RESOURCES - LABOUR AND EQUIPMENT
SR. NO. ITEM PRODUCTIVITY
UNIT QTY LABOUR EQUIPMENT
COM
OPER- HELP- LABO- MAS- SHOV- DIGG- ROLL-
EXCAVATION & EARTHWORKS PACT-
ATOR ER UR ON EL ER ER
OR
Excavation for foundation pits in
1 Cum 150 1 1 1
normal ground
Excavation for foundations in
2 strips/trenches in normal Cum 130 1 1 1
ground
Hand excavation in normal
3 Cum 3 1
ground upto 1.5m lift
Foundation bed levelling &
4 Cum 90 2 1
compaction
Backfilling in 150mm layers in
5 Cum 180 2 1 0.75 1
buildings below slab on grade
Backfilling around building in
6 Cum 200 2 1 0.75 1
150mm layers
CONCRETE RAPID
DISMANTLING & DISPOSAL (MANUAL) LABOUR
BREAKER BREAKER
1 Plain Concrete/Block Walls Cum 5 2 1
5 Staicase/Steps Sqm 8 1 1 1
8HRS
PRODUCTIVITY
SR. NO. ITEM LABOUR
UNIT QTY
CON
CONCRETE WORKS CARPENTER FITTER HELPER
MASON
a Formwork Sqm 40 1 1
b Concrete Cum 20 2 3
2 PCC Below Slab on Grade
a Formwork Sqm 25 1 1
b Concrete Cum 40 2 3
3 Column Footings/Pile Caps
a Formwork Sqm 30 2 2
b Reinforcement (Fabrication & Fix) Kg 170 1
c Concrete Cum 55 2 2
4 Strip Footings
a Formwork Sqm 25 2 2
b Reinforcement (Fabrication & Fix) Kg 170 1
c Concrete Cum 55 2 2
5 Pedestals (Neck Column)
a Formwork Sqm 25 2 1
b Reinforcement (Fabrication & Fix) Kg 160 1
c Concrete Cum 20 1 2
6 Tie Beams
a Formwork Sqm 30 2 1
b Reinforcement (Fabrication & Fix) Kg 180 1
c Concrete Cum 20 2 2
7 Slab on Grade
a Formwork Sqm 30 3 1
b Reinforcement (Fabrication & Fix) Kg 160 1
c Concrete Cum 18 1 2
9 Columns Upto 0.5 Sqm in area (Using Fabricated Forms)
a Formwork Sqm 14 2 1
b Reinforcement (Fabrication & Fix) Kg 160 1
c Concrete Cum 9 1 2
10 Beams
a Formwork Sqm 20 2 2
b Reinforcement (Fabrication & Fix) Kg 160 1
c Concrete Cum 15 1 2
11 Slabs (Solid)
a Formwork Sqm 15 1 1
b Reinforcement (Fabrication & Fix) Kg 200 1
c Concrete Cum 75 3 3
12 Parapets
a Formwork Sqm 20 2 2
b Reinforcement (Fabrication & Fix) Kg 175 1
c Concrete Cum 12 1 1
13 Cantilevers
a Formwork Sqm 12 1 1
b Reinforcement (Fabrication & Fix) Kg 180 1
c Concrete Cum 50 3 3
14 Stairs
a Formwork Sqm 15 1 1
b Reinforcement (Fabrication & Fix) Kg 170 1
c Concrete Cum 20 1 1
8HRS
SR. NO. ITEM LABOUR
UNIT QTY
BLOCK WORK BLOCK MASON HELPER
8 Sub-Frame Fixing No 5 1 1
TILING WORK TILER HELPER
100 Autocad Floor Plan 200 Autocad Commands 500 Various Sizes of House Plans
SSSSS SSSSS SSSSS
₹99.00 ₹49.00 ₹299.00
AutoCAD Exercises Learn 2d and 3d Autocad House Floor Plan Building Estimation Notes
Pratice Drawings SSSSS SSSSS
SSSSS ₹99.00 ₹299.00
₹49.00
https://www.civildigitalstore.com/product-category/ebooks/ 1/4
Ebooks - Civil DigitalStore
Civil Engineering 50 Practical Knowledge Civil Engineering Indian Standards Code Civil Engineering Interview Questions
SSSSS Books SSSSS
₹49.00
SSSSS ₹149.00
₹199.00
Civil Engineering Objective Type Questions Civil Site Knowledge Book Construction Quantity Surveying
SSSSS SSSSS SSSSS
₹99.00 ₹200.00 ₹299.00
https://www.civildigitalstore.com/product-category/ebooks/ 2/4
Ebooks - Civil DigitalStore
Practical Hand Book for Building Road Construction Notes Shorts Notes Guide for Civil Engineer
Construction SSSSS SSSSS
SSSSS ₹149.00 ₹49.00
₹299.00
Site Engineer Pocket Data Standard Data for Civil Site Engineer Thumb Rule for Site Engineer
SSSSS SSSSS SSSSS
₹99.00 ₹99.00 ₹149.00
Thumb Rules For Civil Engineer Vastu Shastra Tips for Building
SSSSS Construction
₹200.00
SSSSS
₹99.00
https://www.civildigitalstore.com/product-category/ebooks/ 3/4