You are on page 1of 27

Good Practices in Production and Good Practices in Production and Quality Control.

JOHN STARTUPRelated Guidelines Quality Control Related Guidelines


John Startup

Training workshop: Training workshop on regulatory requirements for registration of Artemisinin based combined medicines and .assessment of data submitted to regulatory authorities, February 23-27, 2009, Kampala, Uganda 1 | February 23-27, 2009, Kampala, Uganda

Artemisinin based combined medicines

Basic Principles of GMP

Good Practices in Production and Quality Control. Related Guidelines


Artemisinin based combined medicines February 23-27, 2009, Kampala, Uganda

2|

Basic Principles of GMP

The Ten Commandments of GMP

Section 16 and 17

3|

Artemisinin based combined medicines February 23-27, 2009, Kampala, Uganda

Basic Principles of GMP


The Ten Commandments of GMP
1 Build Adequate Premises 2 Equip Your Premises with plant and services fit for purpose. 3 Maintain your premises and equipment 4 Write procedures 5 Validate your work/procedures
4|
Artemisinin based combined medicines February 23-27, 2009, Kampala, Uganda

Section 16 and 17

Basic Principles of GMP


The Ten Commandments of GMP
6 Train your workforce 7 Record your work 8 Be clean in all things 9 Test for Quality 10 Audit for compliance.

5|

Artemisinin based combined medicines February 23-27, 2009, Kampala, Uganda

Basic Principles of GMP


The WHO Guidelines EEC Guidelines(ORANGE GUIDE Eudralex Guidelines FDA Guidelines(CFR) MHRA Specific Topics
6|
Artemisinin based combined medicines February 23-27, 2009, Kampala, Uganda

Basic Principles of GMP


Well documented and respected guidelines. Most available on the internet (OG is the exception)

7|

Artemisinin based combined medicines February 23-27, 2009, Kampala, Uganda

Basic Principles of GMP


Do not forget EP, BP,USP Setting standards as opposed to guidelines

8|

Artemisinin based combined medicines February 23-27, 2009, Kampala, Uganda

Basic Principles of GMP


PREMISES
EEC 1.3 Specifically Annexe 1 Sterile Manufacture WHO Chapter 1 .12 HVAC Chapter 3 Sterile Manufacture. Eudralex Monograph

9|

Artemisinin based combined medicines February 23-27, 2009, Kampala, Uganda

Basic Principles of GMP


EQUIPMENT
EEC 3 and 5 (production) Specifically Annexe 1 Sterile Manufacture WHO Chapter 1 (includes HVAC) Chapter 3 Sterile Manufacture. Eudralex Guideline. Also Sterile Manufacture.

10

Artemisinin based combined medicines February 23-27, 2009, Kampala, Uganda

Basic Principles of GMP


CARE and MAINTENANCE
EEC 3.34 to 3.44 Cleaning and maintenance. WHO 1.13 Company SOP for service schedule and pre programmed Maintenance (PPM)

11

Artemisinin based combined medicines February 23-27, 2009, Kampala, Uganda

Basic Principles of GMP


WRITE PROCEDURES
Addressed in the Documentation chapters of the guidelines
EEC 4.19 to 4.29 Include but not limited to Inventory control Sampling Testing and status control Manufacture and packaging Hygiene /environmental monitoring & control

12

Artemisinin based combined medicines February 23-27, 2009, Kampala, Uganda

Basic Principles of GMP


WRITE PROCEDURES
Addressed in the Documentation chapters of the guidelines WHO 1.15 Eudralex PIC Annexe 13

13

Artemisinin based combined medicines February 23-27, 2009, Kampala, Uganda

Basic Principles of GMP


VALIDATION
Validation protocols usually have a generic format # See WHO 1 appendix 6 Validation Master Plan PIC guideline 10063

14

Artemisinin based combined medicines February 23-27, 2009, Kampala, Uganda

Basic Principles of GMP


VALIDATION
A recorded protocol which demonstrates with a high degree of probability that any activity will repeatedly produce a result within a pre determined specification/requirement. All aspects of pharmaceutical manufacture require validation. Sufficiently important to be referred to throughout the guidelines. eg. WHO 1 appendix 6 Normally states the requirement (not negotiable) but rarely how to
15
Artemisinin based combined medicines February 23-27, 2009, Kampala, Uganda

Basic Principles of GMP


TRAINING
WHO 1.10 and EEC 2.8 to 2.12
Detail training requirements General company culture On the job Outside courses Tests for proficiency Authorisation Training records
16
Artemisinin based combined medicines February 23-27, 2009, Kampala, Uganda

Basic Principles of GMP


RECORDS
Found in the documentation chapters of the guidelines. Examples Analytical test records Batch manufacturing documents (BMR) Cleaning records

17

Artemisinin based combined medicines February 23-27, 2009, Kampala, Uganda

Basic Principles of GMP


CLEANLINESS AND HYGIENE
Fleeting reference in EEC and WHO Guidelines

PIC gives better information #

18

Artemisinin based combined medicines February 23-27, 2009, Kampala, Uganda

Basic Principles of GMP


QUALITY
Quality Assurance Both OG and WHO describe in detail the elements of a robust quality system. Emphasises its all embracing function

19

Artemisinin based combined medicines February 23-27, 2009, Kampala, Uganda

Basic Principles of GMP


QUALITY
Quality Control Quality control of raw materials Components Intermediates and finished products. Microbiology
Artemisinin based combined medicines February 23-27, 2009, Kampala, Uganda

20

Basic Principles of GMP


QUALITY
Quality Control WHO 1.17 EEC 12.6 Quality control of raw materials Components Intermediates and finished products. Microbiology $#
21
Artemisinin based combined medicines February 23-27, 2009, Kampala, Uganda

Basic Principles of GMP


AUDITING FOR COMPLIANCE
WHO 1.8 EEC2.9 Describes the procedures Aspects of pharmaceutical production to be assessed. Includes audits of suppliers.
22
Artemisinin based combined medicines February 23-27, 2009, Kampala, Uganda

Basic Principles of GMP

So what else is there?


???
ISO9000
HTM 2010 Validation of Autoclaves BS 6001

GAMP

23

Artemisinin based combined medicines February 23-27, 2009, Kampala, Uganda

Basic Principles of GMP


OTHERS ISPE Publications on good Pharma Practice HTM 2010 Validation of Autoclaves
Artemisinin based combined medicines February 23-27, 2009, Kampala, Uganda

24

Basic Principles of GMP


WHAT ELSE IS THERE
Contract manufacture. Technical agreements. WHO 1.7 EEC 2.7 Both define contract giver and acceptor And their individual and shared responsibilities
25
Artemisinin based combined medicines February 23-27, 2009, Kampala, Uganda

Basic Principles of GMP


WHAT ELSE IS THERE
Complaints Recalls Returns Stability programmes.

26

Artemisinin based combined medicines February 23-27, 2009, Kampala, Uganda

Basic Principles of GMP


All the guidelines presented are objectives which are not negotiable Nowhere does it say if it costs too much one can ignore the guideline Nowhere does it say if the resources are unavailable the guideline can be ignored. Whist not negotiable, the means /ways of achieving the objectives are a matter of company style one mans solution is another mans
27
Artemisinin based combined medicines February 23-27, 2009, Kampala, Uganda

disaster.

You might also like