POBLACION NUEVO IMPERIAL

TASA DE
CRECIMIENTO
2.68%

1993

2007

13,136

19,026

1993

2007

TASA DE
CRECIMIENTO

252

225

-0.81%

AO
BASE

2007
2012

2013

2014

2015

2016

2017

2018

2019

2020

2021

10

2022

11

2023

12

2024

13

2025

14

2026

15

2027

16

2028

17

2029

18

2030

19

2031

20

2032

Promedio

POBLACION
DISTRITAL
19,026
21,716

POBLACION DEL
ANEXO EL
PORVENIR
225
298

22,298

306

22,895

314

23,509

323

24,139

331

24,786

340

25,450

349

26,132

359

26,833

368

27,552

378

28,290

388

29,048

399

29,827

409

30,626

420

31,447

432

32,290

443

33,155

455

34,044

467

34,956

480

35,893

493

36,855

506

28,654

398
320,000

19,000
101700

804.069863

CUADRO DE DATOS-DE INEI


ZONA DE PLAYA

Sin Proyecto

Con Proyecto

POBLACIN ACTUAL (habitantes)**


298
NUMERO DE VIVIENDAS**
85
TASA CRECIMIENTO ANUAL DE POBLACIONAL DEL DISTRITO
2.68% (%)
DENSIDAD POR LOTE (hab/lote)
3.52
PORCENTAJE DE PRDIDAS *
45%
MICROMEDICIN DOMESTICO (%) **
0
DOTACION DE AGUA (lt/hab/da)***
50
* sin proyecto el especialista / con proyecto dato de ministerio o especialista
** trabajo de campo
*** dato del ministerio

85 268.3693182
297.6296165
3.52
20%
45%
100.00

Parmetros de Diseo-DATOS DEL MINISTERIO


Caudal Promedio (Qp)
Caudal Mximo Diario (Qmd = K1 * QP)
K1 =
1.3
Caudal Mximo Horario (Qmh = K2 * QP)
K2 =
2.6
Caudal Bombeo (Qb = Qmd * 24/ # Hb)
# Hb =
6
Caudal Promedio Desage (Qpd = K3 * Qp) K3 =
0.8
Caudal Desage (Qd = K3 * Qmh, Qd = K2 * Qpd)
Habilitaciones y Centros Poblados
ANEXO EL PORVENIR- LA ENCAADA
TOTAL

N Lotes
85
85

% REPRES.
100%
100%

PROYECCION DE LA POBLACION
AO
0
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20

2012
2013
2014
2015
2016
2017
2018
2019
2020
2021
2022
2023
2024
2025
2026
2027
2028
2029
2030
2031
2032

%
100%
100%

Habitantes
298
298

PROYECCION DE LA COBERTURA DE LOS SERVICIOS

HABITANTES

VIVIENDAS

298
306
314
323
331
340
349
359
368
378
388
399
409
420
432
443
455
467
480
493
506

85
87
89
92
94
97
99
102
105
107
110
113
116
119
123
126
129
133
136
140
144

Fuente: INEI

398

promedio poblacional

DATOS DE CONSUMO POR CONEXIN SEGN CATEGORIAS

AO
0
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20

2012
2013
2014
2015
2016
2017
2018
2019
2020
2021
2022
2023
2024
2025
2026
2027
2028
2029
2030
2031
2032

(m3/mes/cnx)
DOMESTICO
CONSUMO UNITARIO C/MEDIDOR
CONSUMO UNITARIO S/MEDIDOR

16.25
19.99

COMERCIAL
CONSUMO UNITARIO C/MEDIDOR
CONSUMO UNITARIO S/MEDIDOR

16.72
30.00

INDUSTRIAL
CONSUMO UNITARIO C/MEDIDOR
CONSUMO UNITARIO S/MEDIDOR
ESTATAL
CONSUMO UNITARIO C/MEDIDOR
CONSUMO UNITARIO S/MEDIDOR

37.5
64.44

SOCIAL
CONSUMO UNITARIO C/MEDIDOR
CONSUMO UNITARIO S/MEDIDOR
CONSUMO DE LOS NO CONECTADOS
CONSUMO DE LOS NO CONECTADOS
* Consumos EPS EMAPA CAETE S.A.
** Consumos EPS EMAPA CAETE S.A. (ajustado con la Evaluacin Social)

37.50
60.00

3.17 encuesta
3.5156 inei

895
0
0

2010
2007

TOTAL DE LOTES
CON CONEXIN
SIN CONEXIN

0.25%
YECCION DE LA COBERTURA DE LOS SERVICIOS
COBERTURA DESAGUE
COBERTURA AGUA (%)
(%)
80.00%
0.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%

PRDIDAS DE AGUA (%)


45.00%
20.00%
20.00%
20.00%
20.00%
20.00%
20.00%
20.00%
20.00%
20.00%
20.00%
20.00%
20.00%
20.00%
20.00%
20.00%
20.00%
20.00%
20.00%
20.00%
20.00%

santa maria alta


santa maria alta

65
16
81

0.197530864

Cobertura de Conexiones
Ao

0
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20

2012
2013
2014
2015
2016
2017
2018
2019
2020
2021
2022
2023
2024
2025
2026
2027
2028
2029
2030
2031
2032

Poblacin

Vivienda

298
306
314
323
331
340
349
359
368
378
388
399
409
420
432
443
455
467
480
493
506

85
87
89
92
94
97
99
102
105
107
110
113
116
119
123
126
129
133
136
140
144

Vivienda Servida (hab)

Con
conexin

Sin
Conexion

Con
conexion

Sin
Conexion

80.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%

20.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

68
87
89
92
94
97
99
102
105
107
110
113
116
119
123
126
129
133
136
140
144

17
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

N de Conexiones Segn Tipo


Vivienda
Servidas

68
87
89
92
94
97
99
102
105
107
110
113
116
119
123
126
129
133
136
140
144

Domestico

Estatal y
Social

Total

85
87
89
92
94
97
99
102
105
107
110
113
116
119
123
126
129
133
136
140
144

3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3

88
90
92
95
97
100
102
105
108
110
113
116
119
122
126
129
132
136
139
143
147

Consumo Total (l/seg)


Domestico
(l/seg)
36.96
0.55
0.56
0.58
0.59
0.61
0.62
0.64
0.66
0.67
0.69
0.71
0.73
0.75
0.77
0.79
0.81
0.83
0.85
0.88
0.90

Estatal y
Social
(l/seg)

Total
(l/seg)

0.07
0.07
0.07
0.07
0.07
0.07
0.07
0.07
0.07
0.07
0.07
0.07
0.07
0.07
0.07
0.07
0.07
0.07
0.07
0.07
0.07

37.04
0.62
0.63
0.65
0.66
0.68
0.70
0.71
0.73
0.75
0.76
0.78
0.80
0.82
0.85
0.86
0.88
0.91
0.93
0.95
0.98

Prdidas
Fsicas
(%)
45%
20%
20%
20%
20%
20%
20%
20%
20%
20%
20%
20%
20%
20%
20%
20%
20%
20%
20%
20%
20%

Demanda de Produccion de Agua (l/seg)


Caudal
Promedio
lt/seg
67.34
0.78
0.79
0.81
0.83
0.85
0.87
0.89
0.92
0.93
0.96
0.98
1.00
1.03
1.06
1.08
1.10
1.14
1.16
1.19
1.22

Caudal
Caudal Maximo
Maximo Diario
Horario (Qmh)
(Qmd)
87.55
1.01
1.03
1.06
1.08
1.11
1.13
1.16
1.19
1.21
1.24
1.27
1.30
1.33
1.37
1.40
1.44
1.48
1.51
1.55
1.59

175.09
2.02
2.06
2.12
2.16
2.22
2.26
2.32
2.38
2.42
2.48
2.54
2.61
2.67
2.75
2.81
2.87
2.95
3.01
3.09
3.18

Demanda de
Produccin
de Agua (l/s)

Demanda de
Almacenamiento
(m3/da)

Volumen de
Reserva

175.09
2.02
2.06
2.12
2.16
2.22
2.26
2.32
2.38
2.42
2.48
2.54
2.61
2.67
2.75
2.81
2.87
2.95
3.01
3.09
3.18

#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!

617
7
7
7
8
8
8
8
8
9
9
9
9
9
10
10
10
10
11
11
11

Volumen
Contra
Incendios

Volumen de
Almacenamiento
(m3/da)

50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50
50

#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!

Cobertura de
Alcantarillado
Ao
CONSUMOM3/AO
5,521,751
63,546
64,831
66,759
68,044
69,972
71,257
73,185
75,112
76,397
78,325
80,253
82,180
84,108
86,678
88,606
90,533
93,104
95,031
97,601
100,172

2,012
2,013
2,014
2,015
2,016
2,017
2,018
2,019
2,020
2,021
2,022
2,023
2,024
2,025
2,026
2,027
2,028
2,029
2,030
2,031
2,032

Vivienda

0
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20

88
90
92
95
97
100
102
105
108
110
113
116
119
122
126
129
132
136
139
143
147

Con
Conexin
0.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%

Cobertura de
Alcantarillado

Vivienda Servida

Sin
Conexin

Con
Conexin

Sin
Conexin

100.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

0
90
92
95
97
100
102
105
108
110
113
116
119
122
126
129
132
136
139
143
147

88
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Caudal Promedio

Lt/seg

Lt/dia

m3/ao

Caudal
Maximo
Horario
(l/seg)

0.35
0.36
0.37
0.38
0.39
0.40
0.42
0.43
0.44
0.45
0.46
0.47
0.49
0.50
0.51
0.53
0.54
0.56
0.57
0.59

0
30,240
31,104
31,968
32,832
33,696
34,560
36,288
37,152
38,016
38,880
39,744
40,608
42,336
43,200
44,064
45,792
46,656
48,384
49,248
50,976

0
11,038
11,353
11,668
11,984
12,299
12,614
13,245
13,560
13,876
14,191
14,507
14,822
15,453
15,768
16,083
16,714
17,029
17,660
17,976
18,606

0.00
0.91
0.94
0.96
0.99
1.01
1.04
1.09
1.12
1.14
1.17
1.20
1.22
1.27
1.30
1.33
1.38
1.40
1.46
1.48
1.53

AGUA POTABLE

Ao

Oferta Optimizada
(Lt/Seg)

Demanda
(Lt/Seg)

Balance
(Lt/Seg)
3.50

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

2.02
2.06
2.12
2.16
2.22
2.26
2.32
2.38
2.42
2.48
2.54
2.61
2.67
2.75
2.81
2.87
2.95
3.01
3.09
3.18

-2.02
-2.06
-2.12
-2.16
-2.22
-2.26
-2.32
-2.38
-2.42
-2.48
-2.54
-2.61
-2.67
-2.75
-2.81
-2.87
-2.95
-3.01
-3.09
-3.18

Ao

Oferta Optimizada
(Lt/Seg)

Demanda
(Lt/Seg)

Balance
(Lt/Seg)

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!

#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!

3.00
2.50
2.00
1.50
1.00
0.50
0.00
1

1.00
0.90
0.80
0.70
0.60
0.50
0.40
0.30
0.20
0.10
0.00
1

ALCANTARILLADO

Ao

Oferta Optimizada
(Lt/Seg)

Demanda
(Lt/Seg)

Balance
(Lt/Seg)

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.91
0.94
0.96
0.99
1.01
1.04
1.09
1.12
1.14
1.17
1.20
1.22
1.27
1.30
1.33
1.38
1.40
1.46
1.48
1.53

-0.91
-0.94
-0.96
-0.99
-1.01
-1.04
-1.09
-1.12
-1.14
-1.17
-1.20
-1.22
-1.27
-1.30
-1.33
-1.38
-1.40
-1.46
-1.48
-1.53

1.80
1.60
1.40
1.20
1.00
0.80
0.60
0.40
0.20
0.00
1

Oferta Optimizada (Lt/Seg)

Deficit

Demanda (Lt/Seg)

9 10 11 12 13 14 15 16 17 18 19 20

Oferta Optimizada (Lt/Seg)

Deficit

9 10 11 12 13 14 15 16 17 18 19 20

Demanda (Lt/Seg)

Oferta Optimizada (Lt/Seg)

Deficit

9 10 11 12 13 14 15 16 17 18 19 20

Demanda (Lt/Seg)

TIEMPO DE
ACARREO (MIN)

N DE VIAJE/DIA

TIEMPO TOTAL
DE ACARREO
(HORAS)

MADRE

15

0.50

HIJO

0.00

PERSONAS QUE
ACARREAN

Valor del tiempo de acarreo por familia al mes (S/.)


cantidad acarreada al dia (Lt/da)
cantidad acarreada al mes (m3)
Valor del tiempo de acarreo por familia al ao (S/.)
valor tiempo de acarreo al mes por m3 (S/.)
Promedio de consumo de saturacion con costo marginal cero

22.32
36.00
1.08
267.84
20.67
15.84

CURVA DE DEMANDA
Q = a - bP
Q1 = Consumo de los no conectados =
P1 = Valor del acarreo/m3 de los no conectados =
Q2 = consumo de saturacin de los conectados =
P2 = Precio/m3 de los no conectados =

1.08
20.67
15.84
0.00

Los dos pares de puntos permiten calcular los parmetros de la funcin demanda con las ecuaciones
siguientes:
b=
a=

0.71
15.84

La ecuacin es : Q = 15.84 - 0.71 P

20.67

22.32
156.27

1.080

Estimacin de los beneficios de nuevos usuarios


a. Beneficios por recursos liberados (S/. / fam/mes)
b. Beneficios por incremento del consumo de agua (S/. / fam/mes)
c. Beneficios brutos totales (S/. / fam/mes)
Elaboracion: UF

22.32
152.52
174.84

VALOR DEL TIEMPO


(S/. /HORA)

VALOR DEL TIEMPO DE


ACARREO (S/. / DIA)

1.488

0.74

0.744

0.00
0.74
22.32
36.00
1.08
267.84
20.67

anda con las ecuaciones

16.20

20.67

Ao
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20

Usuarios
antiguos

Usuarios
Nuevos

Usuarios
totales

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

87
89
92
94
97
99
102
105
107
110
113
116
119
123
126
129
133
136
140
144

87
89
92
94
97
99
102
105
107
110
113
116
119
123
126
129
133
136
140
144

Beneficios Anuales (Miles de Soles)


Ant. Usuarios
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Beneficios Anuales (Miles de Soles)


Nuevos Usuarios

Total

182,382
187,270
192,288
197,442
202,733
208,166
213,745
219,474
225,356
231,395
237,597
243,964
250,502
257,216
264,109
271,187
278,455
285,918
293,580
301,448

182,382
187,270
192,288
197,442
202,733
208,166
213,745
219,474
225,356
231,395
237,597
243,964
250,502
257,216
264,109
271,187
278,455
285,918
293,580
301,448

PRESUPUESTO DE OBRA
Obra

ITEM
01
01.01
01.01.01
01.01.02
01.01.03
01.01.04
01.01.05
01.01.06
01.01.07
01.02
01.02.01
01.02.01.01
01.02.01.02
01.02.01.03
01.02.01.04
01.02.02
01.02.02.01
01.02.02.02
01.02.02.03
01.02.02.04
01.02.03
01.02.03.01
01.02.04
01.02.04.01
01.02.04.02
01.02.04.03
01.02.05
01.02.05.01
01.02.06
01.02.06.01
01.02.06.02
01.02.07
01.02.07.01
01.02.07.02
01.02.07.03
01.03
01.03.01
01.03.01.01
01.03.01.02
01.03.01.03
01.03.02
01.03.02.01

MEJORAMIENTO DEL SISTEMA DE AGUA POTABLE E INSTALACION DE ALCANTARILLADO EN EL ANEXO


EL PORVENIR - LA ENCAADA
Provincia: CAETE
Distrito: Nuevo Imperial
DESCRIPCION
PLANTA DE TRATAMIENTO DE AGUA POTABLE
(PTAP)
OBRAS PROVISIONALES
Campamento provisional para la obra tipo LP-03 und
1.00 6,520.13 6,520.13
Construccion Provisional para almacen, depsito del
campamento (rea=30.24m2) und 1.00 646.33
646.33
Construccion Provisional para guardiana
(area=2.88m2) und 1.00 181.19 181.19
Servicio de Bao porttil (Inodoro y lavadero) tipo
DISAL o similar und 2.00 280.00 560.00
Cartel de Identificacin de la obra 3.60x2.40m und
1.00 1,490.23 1,490.23
Movilizacion de campamentos, maquinarias,
herramientas para la obra und 1.00 5,988.52
5,988.52
Flete transporte de materiales a la obra
CAPTACIN
TRABAJOS PRELIMINARES
LIMPIEZA DE TERRENO EN ESTRUCTURAS
TRAZO, NIVELACIN Y REPLANTEO INICIAL DE
ESTRUCTURAS
TRAZO, NIVELACIN Y REPLANTEO FINAL DE
ESTRUCTURAS
DESVIO DE CANAL PRINCIPAL EXISTENTE
MOVIMIENTO DE TIERRAS
EXCAVACION CON EQUIPO EN TERRENO
NORMAL P/ESTRUCTURAS
REFINE, NIVELACIN Y COMPACTACIN EN
TERRENO NORMAL
RELLENO COMPACTADO CON MATERIAL
PROPIO
ELIMINACIN DE MATERIAL EXCEDENTE
CONCRETO SIMPLE
SOLADO E=4"
CONCRETO ARMADO
CONCRETO F'C=210 KG/CM2 (CEMENTO V) PARA
ESTRUCTURAS
ACERO DE REFUERZO fy=4200 kg/cm2
ENCOFRADO Y DESENCOFRADO (INC.
HABILITACIN DE MADERA) PARA
ESTRUCTURAS
REVOQUES Y ENLUCIDOS
TARRAJEO EN INTERIORES C/ ADITIVO
IMPERMEABILIZANTE
INSTALACIONES HIDRAULICAS
SUMINISTRO E INSTALACIN DE VLVULA
COMPUERTA HDF 160 mm
SUMINISTRO E INSTALACIN DE TUBERA PVC-UPRESIN NTP 4422 FLEXIBLE C-7.5, 160mm
VARIOS
SUMINISTRO E INSTALACIN DE SOPORTE
METALICO P/ VALV. COMPUERTA
SUMINISTRO E INSTALACIN DE TAPA
METLICO 1.40x1.50e=1/4"
SUMINISTRO E INSTALACIN DE REJILLA DE
INGRESO (SEGN DISEO)
PRESEDIMENTADOR
TRABAJOS PRELIMINARES
LIMPIEZA DE TERRENO EN ESTRUCTURAS
TRAZO, NIVELACIN Y REPLANTEO INICIAL DE
ESTRUCTURAS
TRAZO, NIVELACIN Y REPLANTEO FINAL DE
ESTRUCTURAS
MOVIMIENTO DE TIERRAS
EXCAVACION CON EQUIPO EN TERRENO
NORMAL

U.M.

METRADO

PRECIO

PARCIAL

TOTAL

0.00
glb

1.00

0.00

0.00

glb

6.00

0.00

0.00

glb

1.00

0.00

0.00

0.00
m2

52.31

0.00

0.00
0.00

m2

52.31

0.00

0.00

m2

52.31

0.00

0.00

glb

1.00

0.00

0.00
0.00

m3

12.92

0.00

0.00

m2

32.31

0.00

0.00

m3

5.74

0.00

0.00

m3

16.80

0.00

m3

6.61

0.00

0.00
0.00
0.00
0.00

m3

15.59

0.00

0.00

kg

427.57

0.00

0.00

m2

4.68

0.00

0.00

m2

66.69

0.00

und

1.00

0.00

0.00

4.46

0.00

0.00

und

1.00

0.00

0.00

und

1.00

0.00

0.00

und

1.00

0.00

0.00

0.00
0.00
0.00

0.00

0.00
m2

16.15

0.00

0.00
0.00

m2

16.15

0.00

0.00

m2

16.15

0.00

0.00

m3

13.63

0.00

0.00

Pgina 26

0.00

PRESUPUESTO DE OBRA
Obra

ITEM
01.03.02.02
01.03.02.03
01.03.02.04
01.03.03
01.03.03.01
01.03.03.02
01.03.03.03
01.03.04
01.03.04.01
01.03.04.02
01.03.04.03
01.03.05
01.03.05.01
01.03.06
01.03.06.01
01.03.06.02
01.03.07
01.03.07.01

MEJORAMIENTO DEL SISTEMA DE AGUA POTABLE E INSTALACION DE ALCANTARILLADO EN EL ANEXO


EL PORVENIR - LA ENCAADA
Provincia: CAETE
Distrito: Nuevo Imperial
DESCRIPCION
REFINE, NIVELACIN Y COMPACTACIN EN
TERRENO NORMAL
RELLENO COMPACTADO CON MATERIAL
PROPIO
ELIMINACIN DE MATERIAL EXCEDENTE
CONCRETO SIMPLE
SOLADO E=4"
ENCOFRADO Y DESENCOFRADO (INC.
HABILITACIN DE MADERA)
CONCRETO f'c=175 kg/cm2 CEMENTO TI, PARA
VEREDAS
CONCRETO ARMADO
ACERO DE REFUERZO fy=4200 kg/cm2
ENCOFRADO Y DESENCOFRADO (INC.
HABILITACIN DE MADERA) PARA
ESTRUCTURAS
CONCRETO f'c=210 kg/cm2 (CEMENTO V) PARA
ESTRUCTURAS
REVOQUES Y ENLUCIDOS
TARRAJEO EN INTERIORES C/ ADITIVO
IMPERMEABILIZANTE
INSTALACIONES HIDRAULICAS
SUMINISTRO E INSTALACIN DE COMPUERTA
TIPO TARJETA DE 0.30x0.30m
SUMINISTRO E INSTALACIN DE TUBERA PVC
ISO 4435, SERIE 25, 160mm, PARA REBOSE Y
LIMPIEZA
VARIOS
SUMINISTRO E INSTALACIN DE REJILLA DE
1.20x0.85m, E=1/2"

01.03.07.02

DADO DE CONCRETO P/ANCLAJE DE TUBERA

01.03.07.03
01.04
01.04.01
01.04.01.01

CERCO METALICO MALLA COCADA 2"


FLOCULADOR
TRABAJOS PRELIMINARES
LIMPIEZA DE TERRENO EN ESTRUCTURAS
TRAZO, NIVELACIN Y REPLANTEO INICIAL DE
ESTRUCTURAS
TRAZO, NIVELACIN Y REPLANTEO FINAL DE
ESTRUCTURAS
MOVIMIENTO DE TIERRAS
EXCAVACION CON EQUIPO EN TERRENO
NORMAL
REFINE, NIVELACIN Y COMPACTACIN EN
TERRENO NORMAL C/EQUIPO
RELLENO COMPACTADO CON MATERIAL
PROPIO
ELIMINACIN DE MATERIAL EXCEDENTE
CONCRETO SIMPLE
SOLADO E=4"
CONCRETO ARMADO
ACERO DE REFUERZO fy=4200 kg/cm2
ENCOFRADO Y DESENCOFRADO (INC.
HABILITACIN DE MADERA) PARA
ESTRUCTURAS
CONCRETO f'c=210 kg/cm2 (CEMENTO V) PARA
ESTRUCTURAS
REVOQUES Y ENLUCIDOS
TARRAJEO EN INTERIORES C/ ADITIVO
IMPERMEABILIZANTE
INSTALACIONES HIDRAULICAS
SUMINISTRO E INSTALACIN DE COMPUERTA
TIPO TARJETA 16"x16"
SUMINISTRO E INSTALACIN DE TUBERIA HD BB
DN160mm
SUMINISTRO E INSTALACIN DE BRIDA
ROMPEAGUA HD BB DN160mm
SUMINISTRO E INSTALACIN DE CODO HD BB
DN160mmx90
VARIOS

01.04.01.02
01.04.01.03
01.04.02
01.04.02.01
01.04.02.02
01.04.02.03
01.04.02.04
01.04.03
01.04.03.01
01.04.04
01.04.04.01
01.04.04.02
01.04.04.03
01.04.05
01.04.05.01
01.04.06
01.04.06.01
01.04.06.02
01.04.06.03
01.04.06.04
01.04.07

U.M.

METRADO

PRECIO

PARCIAL

m2

12.77

0.00

0.00

m3

4.85

0.00

0.00

m3

17.72

0.00

m3

0.74

0.00

0.00
0.00
0.00

m2

2.00

0.00

0.00

m3

1.20

0.00

0.00

kg

260.77

0.00

0.00
0.00

m2

41.86

0.00

0.00

m3

4.30

0.00

0.00

m2

10.86

0.00

TOTAL

0.00
0.00
0.00
und

1.00

0.00

0.00

24.35

0.00

0.00

und

1.00

0.00

0.00

und

4.00

0.00

0.00

42.11

0.00

0.00

0.00

0.00
m2

36.48

0.00

0.00
0.00

m2

36.48

0.00

0.00

m2

36.48

0.00

0.00

m3

27.39

0.00

0.00

m2

40.00

0.00

0.00

m3

5.00

0.00

0.00

m3

35.61

0.00

m3

3.65

0.00

kg

698.95

0.00

0.00
0.00
0.00
0.00
0.00

m2

56.48

0.00

0.00

m3

13.28

0.00

0.00

0.00

0.00
m2

48.95

0.00

0.00

und

1.00

0.00

0.00

1.50

0.00

0.00

und

1.00

0.00

0.00

und

1.00

0.00

0.00

0.00

0.00

Pgina 27

PRESUPUESTO DE OBRA
Obra

ITEM
01.04.07.01
01.04.07.02
01.04.07.03
01.05
01.05.01
01.05.01.01
01.05.01.02
01.05.01.03
01.05.02
01.05.02.01
01.05.02.02
01.05.02.03
01.05.02.04
01.05.03
01.05.03.01
01.05.04
01.05.04.01
01.05.04.02
01.05.04.03
01.05.05
01.05.05.01
01.05.06
01.05.06.01
01.05.06.02
01.05.06.03
01.05.06.04
01.05.06.05
01.05.06.06
01.05.06.07
01.05.06.08
01.05.06.09
01.05.06.10
01.05.07
01.05.07.01
01.05.07.02
01.05.07.03
01.06
01.06.01
01.06.01.01
01.06.01.02
01.06.01.03
01.06.02
01.06.02.01

MEJORAMIENTO DEL SISTEMA DE AGUA POTABLE E INSTALACION DE ALCANTARILLADO EN EL ANEXO


EL PORVENIR - LA ENCAADA
Provincia: CAETE
Distrito: Nuevo Imperial
DESCRIPCION
BUZON DE INSPECCION CA, DIAM. 1.50M,
H=1.75m
MEZCLADOR DE FLOCULANTE
SUM/INSTAL DE PANTALLAS DIFUSORAS DE
CA PREFABRICADAS
DECANTADOR
TRABAJOS PRELIMINARES
LIMPIEZA DE TERRENO EN ESTRUCTURAS
TRAZO, NIVELACIN Y REPLANTEO INICIAL DE
ESTRUCTURAS
TRAZO, NIVELACIN Y REPLANTEO FINAL DE
ESTRUCTURAS
MOVIMIENTO DE TIERRAS
EXCAVACION CON EQUIPO EN TERRENO
NORMAL
REFINE, NIVELACIN Y COMPACTACIN EN
TERRENO NORMAL C/EQUIPO
RELLENO COMPACTADO CON MATERIAL
PROPIO
ELIMINACIN DE MATERIAL EXCEDENTE
CONCRETO SIMPLE
SOLADO E=4"
CONCRETO ARMADO
ACERO DE REFUERZO fy=4200 kg/cm2
ENCOFRADO Y DESENCOFRADO (INC.
HABILITACIN DE MADERA) PARA
ESTRUCTURAS
CONCRETO f'c=210 kg/cm2 (CEMENTO V) PARA
ESTRUCTURAS
REVOQUES Y ENLUCIDOS
TARRAJEO EN INTERIORES C/ ADITIVO
IMPERMEABILIZANTE
INSTALACIONES HIDRAULICAS
SUMINISTRO E INSTALACIN DE COMPUERTA
TIPO TARJETA 16"x16"
SUMINISTRO E INSTALACIN DE VALVULA
MARIPOSA HDF DN 160mm ISO 7259
SUMINISTRO E INSTALACIN DE VALVULA
MARIPOSA HDF DN 200mm ISO 7259
SUMINISTRO E INSTALACIN DE TUBERIA
COLECTORA PVC DN160mm, PERFORADA
SUMINISTRO E INSTALACIN DE TUBERIA HD BB
DN160mm
SUMINISTRO E INSTALACIN DE TUBERIA HD BB
DN200mm
SUMINISTRO E INSTALACIN DE BRIDA
ROMPEAGUA HD BB DN160mm
SUMINISTRO E INSTALACIN DE CODO HD BB
DN160mmx90
SUMINISTRO E INSTALACIN DE REDUCCION
HD BB DN160mmx200mm
SUMINISTRO E INSTALACIN DE TEE HD BB
DN160mmx200mm
VARIOS
BUZON DE INSPECCION CA, DIAM. 1.50M,
H=5.20m
PASAMANO TUBO GALV. 2"
LONA DE VINILO 2.50X1.50XE=57mm
C/ARRIOSTRE METALICO
FILTRO
TRABAJOS PRELIMINARES
LIMPIEZA DE TERRENO EN ESTRUCTURAS
TRAZO, NIVELACIN Y REPLANTEO INICIAL DE
ESTRUCTURAS
TRAZO, NIVELACIN Y REPLANTEO FINAL DE
ESTRUCTURAS
MOVIMIENTO DE TIERRAS
EXCAVACION CON EQUIPO EN TERRENO
NORMAL

U.M.

METRADO

PRECIO

PARCIAL

und

1.00

0.00

0.00

und

1.00

0.00

0.00

und

14.00

0.00

0.00

TOTAL

0.00
m2

40.01

0.00

0.00
0.00

m2

40.01

0.00

0.00

m2

40.01

0.00

0.00
0.00

m3

176.92

0.00

0.00

m2

43.55

0.00

0.00

m3

5.00

0.00

0.00

m3

229.99

0.00

m3

4.12

0.00

kg

1,098.88

0.00

0.00
0.00
0.00
0.00
0.00

m2

220.67

0.00

0.00

m3

46.46

0.00

0.00

m2

220.67

0.00

und

4.00

0.00

0.00

und

2.00

0.00

0.00

und

2.00

0.00

0.00

122.50

0.00

0.00

10.00

0.00

0.00

12.50

0.00

0.00

und

1.00

0.00

0.00

und

2.00

0.00

0.00

und

2.00

0.00

0.00

und

2.00

0.00

0.00

und

2.00

0.00

0.00

18.00

0.00

0.00

und

51.00

0.00

0.00

0.00
0.00
0.00

0.00

0.00
m2

51.27

0.00

0.00
0.00

m2

51.27

0.00

0.00

m2

51.27

0.00

0.00
0.00

m3

Pgina 28

248.28

0.00

0.00

PRESUPUESTO DE OBRA
Obra

ITEM
01.06.02.02
01.06.02.03
01.06.02.04
01.06.03
01.06.03.01
01.06.04
01.06.04.01
01.06.04.02
01.06.04.03
01.06.05
01.06.05.01
01.06.06
01.06.06.01
01.06.06.02
01.06.06.03
01.06.06.04
01.06.06.05
01.06.06.06
01.06.07
01.06.07.01
01.06.07.02
01.06.07.03
01.06.07.04
01.06.07.05

MEJORAMIENTO DEL SISTEMA DE AGUA POTABLE E INSTALACION DE ALCANTARILLADO EN EL ANEXO


EL PORVENIR - LA ENCAADA
Provincia: CAETE
Distrito: Nuevo Imperial
DESCRIPCION
REFINE, NIVELACIN Y COMPACTACIN EN
TERRENO NORMAL
RELLENO COMPACTADO CON MATERIAL
PROPIO
ELIMINACIN DE MATERIAL EXCEDENTE
CONCRETO SIMPLE
SOLADO E=4"
CONCRETO ARMADO
ACERO DE REFUERZO fy=4200 kg/cm2
ENCOFRADO Y DESENCOFRADO (INC.
HABILITACIN DE MADERA) PARA
ESTRUCTURAS
CONCRETO f'c=210 kg/cm2 (CEMENTO V) PARA
ESTRUCTURAS
REVOQUES Y ENLUCIDOS
TARRAJEO EN INTERIORES C/ ADITIVO
IMPERMEABILIZANTE
INSTALACIONES HIDRAULICAS
SUMINISTRO E INSTALACIN DE COMPUERTA
TIPO TARJETA 14"x14"
SUMINISTRO E INSTALACIN DE COMPUERTA
TIPO TARJETA 16"x16"
SUMINISTRO E INSTALACIN DE COMPUERTA
TIPO TARJETA 20"x20"
SUMINISTRO E INSTALACIN DE BRIDA
ROMPEAGUA HD BB DN160mm
SUMINISTRO E INSTALACIN DE REDUCCION
HD BB DN160mmx200mm
SUMINISTRO E INSTALACIN DE TEE HD BB
DN160mmx200mm und 2.00
VARIOS
BUZON DE INSPECCION CA, DIAM. 1.50M,
H=5.20m
PASAMANO TUBO GALV. 2" m 18.00 231.40
4,165.20
VERTEDERO RECTANGULAR METALICO E=1/4"
SUMINISTRO E INSTALACIN DE FILTROS DE
GRAVA
SUMINISTRO E INSTALACIN DE FILTROS DE
ARENA

01.06.07.06

VIGUETAS PREFABRICADAS (SEGN DISEO)

01.06.07.07
01.07
01.07.01
01.07.01.01

TUBERIA PVC-UF DN 400mm, C-7.5,ISO 4422


CISTERNA
TRABAJOS PRELIMINARES
LIMPIEZA DE TERRENO EN ESTRUCTURAS
TRAZO, NIVELACIN Y REPLANTEO INICIAL DE
ESTRUCTURAS
TRAZO, NIVELACIN Y REPLANTEO FINAL DE
ESTRUCTURAS
MOVIMIENTO DE TIERRAS
EXCAVACION CON EQUIPO EN TERRENO
NORMAL
EXCAVACION CON EQUIPO EN TERRENO
ROCOSO
REFINE, NIVELACIN Y COMPACTACIN EN
TERRENO NORMAL
RELLENO COMPACTADO CON MATERIAL
PROPIO
ELIMINACIN DE MATERIAL EXCEDENTE
CONCRETO SIMPLE
SOLADO E=4"
ENCOFRADO Y DESENCOFRADO (INC
HABILITACION DE MADERA) SOLADO
CONCRETO F'C=175KG/CM2 CEMENTO TI PARA
VEREDAS
ENCOFRADO Y DESENCOFRADO (INC
HABILITACION DE MADERA) VEREDAS
CONCRETO ARMADO

01.07.01.02
01.07.01.03
01.07.02
01.07.02.01
01.07.02.02
01.07.02.03
01.07.02.04
01.07.02.05
01.07.03
01.07.03.01
01.07.03.02
01.07.03.03
01.07.03.04
01.07.04

U.M.

METRADO

PRECIO

PARCIAL

m2

51.27

0.00

0.00

m3

5.00

0.00

0.00

m3

369.56

0.00

m3

5.13

0.00

kg

3,616.76

0.00

0.00
0.00
0.00
0.00
0.00

m2

391.30

0.00

0.00

m3

84.04

0.00

0.00

m2

391.30

0.00

und

2.00

0.00

0.00

und

4.00

0.00

0.00

und

2.00

0.00

0.00

und

1.00

0.00

0.00

und

2.00

0.00

0.00

und

2.00

0.00

0.00

TOTAL

0.00
0.00
0.00

0.00
und

2.00

0.00

0.00

18.00

0.00

0.00

und

2.00

0.00

0.00

m3

8.70

0.00

0.00

m3

13.92

0.00

0.00

und

21.00

0.00

0.00

26.00

0.00

0.00
0.00

m2

114.49

0.00

0.00
0.00

m2

114.49

0.00

0.00

m2

114.49

0.00

0.00

m3

690.20

0.00

0.00

m3

22.90

0.00

0.00

m2

114.49

0.00

0.00

m3

4.28

0.00

0.00

m3

855.20

0.00

m3

11.45

0.00

0.00
0.00
0.00

m2

4.28

0.00

0.00

m3

6.42

0.00

0.00

m2

4.80

0.00

0.00

0.00

0.00

Pgina 29

PRESUPUESTO DE OBRA
Obra

MEJORAMIENTO DEL SISTEMA DE AGUA POTABLE E INSTALACION DE ALCANTARILLADO EN EL ANEXO


EL PORVENIR - LA ENCAADA
Provincia: CAETE
Distrito: Nuevo Imperial

ITEM
01.07.04.01

DESCRIPCION

U.M.

METRADO

PRECIO

LOSA DE CIMENTACIN

PARCIAL

01.07.04.01.01 ACERO DE REFUERZO fy=4200 kg/cm2

kg

2,171.12

0.00

0.00

ENCOFRADO Y DESENCOFRADO (INC.


01.07.04.01.02 HABILITACIN DE MADERA) PARA
ESTRUCTURAS

m2

17.12

0.00

0.00

01.07.04.01.03 CONCRETO f'c=280 kg/cm2 P/LOSA DE FONDO

m3

45.80

0.00

0.00

01.07.04.02.01 ACERO DE REFUERZO fy=4200 kg/cm2

kg

2,304.09

0.00

0.00

ENCOFRADO Y DESENCOFRADO (INC.


01.07.04.02.02 HABILITACIN DE MADERA) PARA
ESTRUCTURAS

m2

513.60

0.00

0.00

01.07.04.02.03 CONCRETO f'c=280 kg/cm2 P/MUROS

m3

83.89

0.00

0.00

01.07.04.03.01 ACERO DE REFUERZO fy=4200 kg/cm2

kg

361.59

0.00

0.00

ENCOFRADO Y DESENCOFRADO (INC.


01.07.04.03.02 HABILITACIN DE MADERA) PARA
ESTRUCTURAS

m2

40.11

0.00

0.00

01.07.04.03.03 CONCRETO f'c=280 kg/cm2 P/VIGA DE ANILLO

m3

12.28

0.00

0.00

01.07.04.04.01 ACERO DE REFUERZO fy=4200 kg/cm2

kg

1,518.26

0.00

0.00

ENCOFRADO Y DESENCOFRADO (INC.


01.07.04.04.02 HABILITACIN DE MADERA) PARA
ESTRUCTURAS

m2

114.49

0.00

0.00

01.07.04.04.03 CONCRETO f'c=280 kg/cm2 P/LOSA DE TECHO

0.00

01.07.04.02

01.07.04.03

01.07.04.04

MUROS

0.00

VIGAS

0.00

LOSA DE TECHO

0.00

m3

34.35

0.00

m2

191.49

0.00

01.07.06

REVOQUES Y ENLUCIDOS
TARRAJEO EN INTERIORES C/ ADITIVO
IMPERMEABILIZANTE
VARIOS

01.07.06.01

JUNTA DE CONSTRUCCIN C/ WATER STOP 9"

144.00

0.00

0.00

und

1.00

0.00

0.00

und

1.00

0.00

0.00

01.07.05
01.07.05.01

SUM./ INST. DE MARCO Y TAPA C/MEC.


01.07.06.02
SEGURIDAD S/DISEO CISTERNA
SUM./INST. DE ESCALERA DE INGRESO A
01.07.06.03
CISTERNA
01.08
CUARTO DE MAQUINAS
01.08.01
CONCRETO SIMPLE
ENCOFRADO Y DESENCOFRADO (INC.
01.08.01.01
HABILITACIN DE MADERA)
CONCRETO f'c=175 kg/cm2 CEMENTO TI, PARA
01.08.01.02
VEREDAS
01.08.02
CONCRETO ARMADO
01.08.02.01
COLUMNAS
ACERO DE REFUERZO fy=4200 kg/cm2
01.08.02.01.01
P/COLUMNAS
ENCOFRADO Y DESENCOFRADO (INC.
01.08.02.01.02
HABILITACIN DE MADERA) P/COLUMNAS
01.08.02.01.03 CONCRETO f'c=210 kg/cm2 P/COLUMNAS
01.08.02.02

0.00
0.00
0.00

0.00
0.00
m2

4.80

0.00

0.00

m3

6.42

0.00

0.00
0.00
0.00

kg

999.61

0.00

0.00

m2

156.48

0.00

0.00

m3

1.66

0.00

0.00

VIGAS

0.00

01.08.02.02.01 ACERO DE REFUERZO fy=4200 kg/cm2 P/VIGAS

kg

104.81

0.00

0.00

ENCOFRADO Y DESENCOFRADO (INC.


01.08.02.02.02
HABILITACIN DE MADERA) P/VIGA m2

m2

2.99

0.00

0.00

01.08.02.02.03 CONCRETO f'c=210 kg/cm2 P/VIGAS

m3

1.24

0.00

0.00

kg

104.81

0.00

0.00

m2

10.12

0.00

0.00

m3

5.80

0.00

0.00

01.08.02.03

LOSA DE TECHO

01.08.02.03.01 ACERO DE REFUERZO fy=4200 kg/cm2 P/TECHO


01.08.02.03.02

ENCOFRADO Y DESENCOFRADO (INC.


HABILITACIN DE MADERA) P/TECHO

01.08.02.03.03 CONCRETO f'c=210 kg/cm2 P/TECHO

TOTAL

0.00

0.00

Pgina 30

PRESUPUESTO DE OBRA
Obra

ITEM

MEJORAMIENTO DEL SISTEMA DE AGUA POTABLE E INSTALACION DE ALCANTARILLADO EN EL ANEXO


EL PORVENIR - LA ENCAADA
Provincia: CAETE
Distrito: Nuevo Imperial
DESCRIPCION

LADRILLO HUECO DE ARCILLA h=15 cm PARA


01.08.02.03.04
TECHO ALIGERADO
01.08.03
MAMPOSTERIA DE LADRILLO
MUROS DE LADRILLO KK DE ARCILLA DE
01.08.03.01
CABEZA CON MEZCLA 1:4 X 1.5 cm
01.08.04
REVOQUES Y ENLUCIDOS
01.08.04.01
TARRAJEO EN CIELORASO
01.08.04.02
TARRAJEO EN MUROS INTERIORES
01.08.04.03
TARRAJEO EN MUROS EXTERIORES
01.08.05
PINTURA
01.08.05.01
PINTURA DE CIELO RASO
01.08.05.02
PINTURA EN MUROS INTERIORES
01.08.05.03
PINTURA EN MUROS EXTERIORES
01.08.06
INSTALACIONES HIDRAULICA
SUMINISTRO DE BOMBAS, VALVULAS Y
01.08.06.01
ACCESORIOS PARA SISTEMA DE BOMBEO
INSTALACIN DE BOMBAS, VALVULA Y
01.08.06.02
ACCESORIOS PARA SISTEMA DE BOMBEO
01.08.07
INSTALACIONES ELECTRICAS
INSTALACIN ELCTRICA P/ SISTEMA DE
01.08.07.01
BOMBAS
01.08.08
ALIMENTACION ELECTRICA
01.08.08.01
ALIMENTACION ELECTRICA
01.08.09
VARIOS
SUM./ INST. DE HIPOCLORADOR DE FLUJO
01.08.09.01
DIFUSOR CISTERNA SUMERGIDO V=500 M3
SUM./ INST. DE REGLA GRADUADA PARA
01.08.09.02
NIVELES
SUM./INST. TUBERIA DE VENTILACIN DE
01.08.09.03
ACERO DN100mm

U.M.

METRADO

PRECIO

PARCIAL

und

242.00

0.00

m2

33.06

0.00

m2
m2
m2

10.12
29.00
38.00

0.00
0.00
0.00

m2
m2
m2

10.12
29.00
38.00

0.00
0.00
0.00

glb

1.00

0.00

0.00

glb

1.00

0.00

0.00

glb

1.00

0.00

0.00

glb

1.00

0.00

0.00
0.00

und

3.00

0.00

0.00

und

1.00

0.00

0.00

und

4.00

0.00

0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00

01.08.09.04

DADO DE CONCRETO P/ANCLAJE DE TUBERA

und

7.00

0.00

0.00

01.08.09.05

SUM./INST. DE PUERTA METLICA

und

1.00

0.00

0.00

01.08.09.06

SUM./INST. DE VENTANA DE FIERRO 1.50X0.60m

und

2.00

0.00

0.00

01.08.09.07

SUM./INST. SOPORTE METLICO T/ABRAZADERA


P/TUBERIA DE DN 160-200MM P/INGRESO A
CISTERNA

und

2.00

0.00

0.00

01.08.09.08

SUM/INST. DE TAPA METLICA 1.20X1.20 E=3/16

und

4.00

0.00

0.00

01.08.09.09

SUM./INST. REJA METLICA 0.80X0.58m Y TAPA


DE CONCRETO 0.60X0.80 EN CAJA DE REBOSE

und

1.00

0.00

0.00

01.08.09.10

SUM./INST. TRAGALUZ EN CUARTO DE MAQUINA

und

2.00

0.00

0.00

01.09
01.09.01
01.09.01.01

CERCO PERIMETRICO
TRABAJOS PRELIMINARES
LIMPIEZA DE TERRENO EN ESTRUCTURAS
TRAZO, NIVELACIN Y REPLANTEO INICIAL DE
ESTRUCTURAS
TRAZO, NIVELACIN Y REPLANTEO FINAL DE
ESTRUCTURAS
MOVIMIENTO DE TIERRAS
DEMOLICION DE MUROS DE ALBAILERIA
DEMOLICION DE ESTRUCTURAS DE CONCRETO
ARMADO
CORTE Y EXCAVACIN MANUAL EN TERRENO
NORMAL
CORTE Y EXCAVACION CON EQUIPO EN
TERRENO SEMIROCOSO
RELLENO CON MATERIAL PROPIO
RELLENO COMPACTADO CON MATERIAL DE
PRESTAMO
ELIMINACIN DE MATERIAL EXCEDENTE
CONCRETO SIMPLE
CONCRETO C:H 1:10 +30% P.G. P/ CIMIENTOS
CORRIDOS
ENCOFRADO Y DESENCOFRADO (INC.
HABILITACIN DE MADERA)

01.09.01.02
01.09.01.03
01.09.02
01.09.02
01.09.03
01.09.04
01.09.05
01.09.06
01.09.07
01.09.08
01.09.03
01.09.03.01
01.09.03.02

TOTAL

0.00
m2

100.00

0.00

0.00
0.00

m2

100.00

0.00

0.00

m2

100.00

0.00

0.00

m3

24.50

0.00

0.00
0.00

m3

70.56

0.00

0.00

m3

79.68

0.00

0.00

m3

13.28

0.00

0.00

m3

39.68

0.00

0.00

m3

13.28

0.00

0.00

m3

252.00

0.00

0.00
0.00

m3

56.44

0.00

0.00

m2

46.48

0.00

0.00

Pgina 31

PRESUPUESTO DE OBRA
Obra

ITEM

MEJORAMIENTO DEL SISTEMA DE AGUA POTABLE E INSTALACION DE ALCANTARILLADO EN EL ANEXO


EL PORVENIR - LA ENCAADA
Provincia: CAETE
Distrito: Nuevo Imperial
DESCRIPCION

CONCRETO f'c=175 kg/cm2 CEMENTO TI, P/


01.09.03.03
SOBRECIMIENTOS
01.09.04
CONCRETO ARMADO
01.09.04.01
COLUMNAS
ACERO ESTRUCTURAL TRABAJADO PARA
01.09.04.01.01
COLUMNAS
ENCOFRADO Y DESENCOFRADO PARA
01.09.04.01.02
COLUMNAS
01.09.04.01.03 CONCRETO f'c=210 kg/cm2 PARA COLUMNAS
VIGAS
ACERO ESTRUCTURAL TRABAJADO PARA
01.09.04.02.01
VIGAS
ENCOFRADO Y DESENCOFRADO PARA VIGAS
01.09.04.02.02
DE AMARRE
CONCRETO f'c=210 kg/cm2 PARA VIGAS DE
01.09.04.02.03
AMARRE
01.09.05
MAMPOSTERIA DE LADRILLO
MUROS DE LADRILLO KK DE ARCILLA DE
01.09.05.01
CABEZA CON MEZCLA 1:4 X 1.5 cm
TOTAL PRESUPUESTO

U.M.

METRADO

m3

29.05

PRECIO
0.00

PARCIAL

TOTAL

0.00
0.00
0.00

kg

748.80

0.00

0.00

m2

3.00

0.00

0.00

m3

6.00

0.00

0.00

kg

788.50

0.00

0.00

m2

25.00

0.00

0.00

m3

7.47

0.00

0.00

m2

200.00

0.00

01.09.04.02

0.00

0.00
0.00
0.00

Pgina 32

PRESUPUESTO DE OBRA
Obra

ITEM
02
02.01
02.02
02.02.07.04
02.03
02.04
02.05
02.06
02.07
01.10

MEJORAMIENTO DEL SISTEMA DE AGUA POTABLE E INSTALACION DE ALCANTARILLADO EN EL ANEXO


EL PORVENIR - LA ENCAADA
Provincia: CAETE
Distrito: Nuevo Imperial
DESCRIPCION
RESERVORIO
OBRAS PROVISIONALES
RESERVORIO
SUM./INST. DE ESCALERA DE INGRESO
CUARTO DE MAQUINAS
CERCO PERIMETRICO
LINEA DE IMPULSIN
LINEA DE ADUCCIN
LINEA DE LIMPIA
LINEA DE CONDUCCION
TOTAL PRESUPUESTO

U.M.

METRADO

und

Pgina 33

1.00

PRECIO

0.00

PARCIAL

0.00

TOTAL
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

PRESUPUESTO DE OBRA
Obra

ITEM
03
03.01
03.02
03.03
03.04
03.05
03.06
03.07
03.08

MEJORAMIENTO DEL SISTEMA DE AGUA POTABLE E INSTALACION DE ALCANTARILLADO EN EL ANEXO


EL PORVENIR - LA ENCAADA
Provincia: CAETE
Distrito: Nuevo Imperial
DESCRIPCION

U.M.

METRADO

REDES DE DISTRIBUCIN DE AGUA POTABLE


OBRAS PROVISIONALES
TRABAJOS PRELIMINARES
MOVIMIENTO DE TIERRAS
TENDIDO DE TUBERA
ACCESORIOS
VLVULAS
CONEXIONES DOMICILIARIAS
VARIOS
TOTAL PRESUPUESTO

PRECIO

PARCIAL

TOTAL
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Pgina 34

PRESUPUESTO DE OBRA
Obra

ITEM

MEJORAMIENTO DEL SISTEMA DE AGUA POTABLE E INSTALACION DE ALCANTARILLADO EN EL ANEXO


EL PORVENIR - LA ENCAADA
Provincia: CAETE
Distrito: Nuevo Imperial
DESCRIPCION

U.M.

METRADO

PRECIO

PARCIAL

TOTAL

01.01.00.00

REDES DE ALCANTARILLADO

01.01.01.00

TRABAJOS PROVISIONALES Y PRELIMINARES

0.00

01.01.02.00
01.01.03.00
01.01.04.00
01.01.05.00
01.01.06.00
01.01.07.00
01.01.08.00

MOVIMIENTO DE TIERRAS
SUMINISTRO E INSTALACION DE TUBERIAS
PRUEBA HIDRAULICA
BUZONES
CONEXIONES DOMICILIARIAS
PRUEBA DE CONTROL DE CALIDAD
VARIOS
TOTAL PRESUPUESTO

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Pgina 35

PRESUPUESTO DE OBRA
Obra

ITEM
01.02.00.00
01.02.01.00
01.02.02.00
01.02.02.01
01.02.02.02
01.02.02.03
01.02.02.04
01.02.02.05
01.02.02.06
01.02.02.07
01.02.02.08
01.02.03.00
01.02.04.00
01.02.05.00
01.02.06.00
01.02.07.00

MEJORAMIENTO DEL SISTEMA DE AGUA POTABLE E INSTALACION DE ALCANTARILLADO EN EL ANEXO


EL PORVENIR - LA ENCAADA
Provincia: CAETE
Distrito: Nuevo Imperial
DESCRIPCION
EMISOR
TRABAJOS PRELIMINARES
MOVIMIENTO DE TIERRAS
EXCAV, ZANJAS C/MAQ. TN HASTA 3.00M, P/TUB.
250mm
EXCAV, ZANJAS C/MAQ. TN DE 3.01M, A 4.22 M
P/TUB. 250mm
REFINE Y NIVELACION ZANJA T.N P/TUB.
=250 MM
PREPARAC. CAMAS DE APOYO PTUB. DN=
250M,HASTA 3.00 M
PREPARAC. CAMAS DE APOYO PTUB. DN=
250M,DE 3.00M A 4.22M
PRIMER RELLENO /COMPACT. ZANJAS TN
P/TUB. 250mm H=.30
S/CLAVE CON MAT.DE
PRESTAMO
SEGUNDO RELLENO /COMPACT. ZANJAS
T.NORMAL P/TUB. 10" HASTA 4.22M
ELIMINACION DE MATERIAL EXCEDENTE
D<2KM
SUMINISTRO E INSTALACION DE TUBERIAS
PRUEBA HIDRAULICA
BUZONES
PRUEBA DE CONTROL DE CALIDAD
VARIOS
TOTAL PRESUPUESTO

U.M.

METRADO

PRECIO

PARCIAL

TOTAL
0.00
0.00

365.43

0.00

0.00

554.63

0.00

0.00

920.06

0.00

0.00

365.43

0.00

0.00

554.63

0.00

0.00

920.06

0.00

0.00

920.06

0.00

0.00

m3

312.15

0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00

Pgina 36

PRESUPUESTO DE OBRA
Obra

ITEM
02.00.00.00
02.01.00.00
02.02.00.00

MEJORAMIENTO DEL SISTEMA DE AGUA POTABLE E INSTALACION DE ALCANTARILLADO EN EL ANEXO


EL PORVENIR - LA ENCAADA
Provincia: CAETE
Distrito: Nuevo Imperial
DESCRIPCION

U.M.

METRADO

PLANTA DE TRATAMIENTO DE AGUAS


RESIDUALES
CAMARA DE REJAS
DESARENADOR

PRECIO

PARCIAL

TOTAL

0.00
0.00

Pgina 37

PRESUPUESTO DE OBRA
Obra

ITEM

MEJORAMIENTO DEL SISTEMA DE AGUA POTABLE E INSTALACION DE ALCANTARILLADO EN EL ANEXO


EL PORVENIR - LA ENCAADA
Provincia: CAETE
Distrito: Nuevo Imperial
DESCRIPCION

02.03.00.00
02.03.05.05

ESTRUCTURAS DE INGRESO Y SALIDA


ESTRUCTURAS DE INGRESO A LAGUNA

02.04.00.00

LAGUNAS FACULTATIVAS (PRIMARIA,


SECUNDARIA)

U.M.

METRADO

und

3.00

PRECIO

PARCIAL

TOTAL
0.00

0.00

0.00
0.00

Pgina 38

PRESUPUESTO DE OBRA
Obra

ITEM
02.04.01.00
02.04.01.01
02.04.01.02
02.04.02.00
02.04.02.01
02.04.02.02
02.04.02.03
02.04.02.04
02.04.02.05
02.04.04.00
02.04.04.01
02.04.04.02
02.04.04.03
02.04.04.04
02.04.04.05
02.04.04.06
02.04.04.07
02.04.04.08
02.04.04.09

MEJORAMIENTO DEL SISTEMA DE AGUA POTABLE E INSTALACION DE ALCANTARILLADO EN EL ANEXO


EL PORVENIR - LA ENCAADA
Provincia: CAETE
Distrito: Nuevo Imperial
DESCRIPCION
TRABAJOS PRELIMINARES
LIMPIEZA DE TERRENO A UNA PROFUNDIDAD
DE e=0.40 m.
TRAZO, NIVELACION Y REPLANTEO FINAL EN
LAGUNA FACULTATIVA
MOVIMIENTO DE TIERRAS
EXCAVACION MASIVA C/MAQUINA
REFINE, NIVELACIN Y COMPACTACIN EN
T.N. CON COMPACTADORA EN LAGUNA
RELLENO/COMPACT. CON MAQUINA
MATERIAL DE PRESTAMO
IMPERMEABILIZACION CON GEOMEMBRANA
P.E.A. 2 MM
ELIMINACION DE MATERIAL EXCEDENTE
D<2KM
CERCO PERIMETRICO
LIMPIEZA DE TERRENO EN ESTRUCTURAS
TRAZO, NIVELACION Y REPLANTEO DE
ESTRUCTURAS
REPLANTEO FINAL DE ESTRUCTURAS
EXCAVACION MANUAL EN TERRENO NORMAL
PARA ESTRUCTURAS
ELIMINACION DE MATERIAL EXCEDENTE
D<2KM
CONCRETO F'C 140 KG/CM2, PARA DADOS DE
CERCO
COLUMNETA DE TUBO NEGRO D=4"
MALLA METALICA
PUERTA METALICA SEGUN DISEO
TOTAL PRESUPUESTO

U.M.

METRADO

PRECIO

PARCIAL

TOTAL

0.00
m2

13,600.00

0.00

0.00

m2

13,613.28

0.00

0.00

m3

16,161.41

0.00

0.00
0.00

m2

13,613.28

0.00

0.00

m2

4,642.85

0.00

0.00

m2

12,018.83

0.00

0.00

m2

28,361.76

0.00

0.00

m2

13,613.28

0.00

0.00
0.00

m2

13,613.28

0.00

0.00

m2

13,613.28

0.00

0.00

m3

235.00

0.00

0.00

m3

294.00

0.00

0.00

m3

36.00

0.00

0.00

und
m2
und

164.00
1,169.00
1.00

0.00
0.00
0.00

0.00
0.00
0.00
0.00

Pgina 39

MONTO DEL PERFIL


DESCRIPCION
1. EXPEDIENTE TECNICO

MONTO

FC

25,000.00

0.909

MONTO P.S
22,725.00

2. PRESUPUESTO DE LA OBRA

761,276.66

608,481.51

2.1. Costos Directos

634,396.66

497,080.87

94,417.39

75,722.75

2.1.1. AGUA POTABLE


2.1.1.3. Redes de distribucion de agua potable

94,417.39

0.802

75,722.75

2.1.2. ALCANTARILLADO

527,979.27

2.1.2.1. Redes de alcantarillado

269,664.99

0.772

208,181.37

10,458.40

0.772

8,073.88

247,855.88

0.785

194,566.87

2.1.3. EDUCACION SANITARIA

6,000.00

0.909

5,454.00

2.1.4. MEDIDAS DE MITIGACION

6,000.00

0.847

5,082.00

2.1.2.2. Emisor
2.1.2.2. Planta de tratamiento de aguas residuales

2.2. Costos Indirecto

410,822.12

126,880.00

111,400.64

2.2.1. Gastos generales (10%)

63,440.00

0.847

53,733.68

2.2.2. Utilidad (10%)

63,440.00

0.909

57,666.96

3. SUPERVISION

25,000.00

0.909

22,725.00

COSTO DE LA INVERSION

811,276.66

653,931.51

AGUA
DESCRIPCION

F.C.

MONTO P.S

12,500.00
163,857.39
100,417.39
94,417.39

0.909

94,417.39

0.802

11,362.50
136,691.07
80,990.75
75,722.75
75,722.75

2.1.2. EDUCACION SANITARIA

3,000.00

0.909

2,727.00

2.1.3. MEDIDAS DE MITIGACION

3,000.00

0.847

2,541.00

1. EXPEDIENTE TECNICO
2. PRESUPUESTO DE LA OBRA
2.1. Costos Directos
2.1.1. AGUA POTABLE
2.1.1.3. Redes de distribucion de agua potable

MONTO

2.2. Costos Indirecto


2.2.1. Gastos generales

63,440.00
31,720.00

0.847

55,700.32
26,866.84

2.2.2. Utilidad

31,720.00

0.909

28,833.48

3. SUPERVISION

12,500.00

0.909

11,362.50

COSTO DE LA INVERSION

188,857.39

159,416.07

ALCANTARILLADO
DESCRIPCION
1. EXPEDIENTE TECNICO

MONTO
6,250.00

F.C.
0.909

2. PRESUPUESTO DE LA OBRA
2.1. Costos Directos

316,343.39
284,623.39

2.1.1. ALCANTARILLADO

280,123.39

2.1.1.1. Redes de alcantarillado

269,664.99

0.772

10,458.40

0.772

3,000.00
1,500.00

0.909

2.1.1.2. Emisor

2.1.2. EDUCACION SANITARIA


2.1.3. MEDIDAS DE MITIGACION
2.2. Costos Indirecto
2.2.1. Gastos generales
2.2.2. Utilidad
3. SUPERVISION
COSTO DE LA INVERSION

MONTO P.S
5,681.25
248,102.92
220,252.76

0.847

216,255.26
208,181.37
8,073.88
2,727.00
1,270.50

31,720.00
15,860.00
15,860.00

0.847
0.909

27,850.16
13,433.42
14,416.74

6,250.00

0.909

5,681.25

328,843.39

259,465.42

PTAR
DESCRIPCION
1. EXPEDIENTE TECNICO
2. PRESUPUESTO DE LA OBRA
2.1. Costos Directos
2.1.1. PTAR
2.1.1.1. Planta de Tratamiento de Aguas Residuales

2.1.2. MEDIDAS DE MITIGACION


2.2. Costos Indirecto
2.2.1. Gastos generales
2.2.2. Utilidad
3. SUPERVISION
COSTO DE LA INVERSION

2.1.1. AGUA POTABLE


2.1.1. ALCANTARILLADO
2.1.1. PTAR

MONTO

F.C.

MONTO P.S

6,250.00
281,075.88
249,355.88
247,855.88
247,855.88
1,500.00
31,720.00
15,860.00
15,860.00

0.909

0.909

5,681.25
223,687.53
195,837.37
194,566.87
194,566.87
1,270.50
27,850.16
13,433.42
14,416.74

6,250.00

0.909

5,681.25

0.785
0.847
0.847

293,575.88

235,050.03

188,857.39
328,843.39
293,575.88
811,276.66

159,416.07
259,465.42
235,050.03
653,931.51

COSTOS DE OPERACION Y MANTENIMIENTO SIN PROYECTO


COMPONENTE

UND

CANT.
MENSUAL

P.U.

PARCIAL

1. Costos de Operacin

TOTAL P.P.

FC

PARCIAL

5,300.00

1.1. Mano de Obra

4,600.70

1,800.00

Operador de planta y redes

mes

12

150.00

1.2. Gastos Administrativos y de Ventas


Utiles de oficina

1,636.20

1,800.00

#######

600.00
mes

12

50.00

1.3. Otros Costos de Operacin

Herramientas y materiales
Energia Elecrica

1,636.20
508.20

600.00

#######

2,900.00

Insumos-Cloro

508.20
2,456.30

Kg.

200

2.20

440.00

#######

global

300.00

300.00

#######

254.10

mes

12

180.00

2,160.00

#######

1,829.52

mes

12

250.00

3,000.00

#######

2,727.00

2. Costos de Mantenimiento

372.68

3,000.00

Servicio de mantenimiento

TOTAL

TOTAL P.S.

2,727.00

8,300.00

7,327.70

COSTOS DE OPERACION Y MANTENIMIENTO CON PROYECTO


COMPONENTE
1. Costos de Operacin
1.1. Mano de Obra
Operador de planta y redes
1.2. Gastos Administrativos y de Ventas
Utiles de oficina
1.3. Otros Costos de Operacin
Insumos-Cloro
Herramientas y materiales
Energia Elecrica

UND

CANT.
MENSUAL

P.U.

PARCIAL

FC

PARCIAL

5,410.00
mes

12

150.00

mes

12

50.00

1,800.00
1,800.00
600.00
600.00
3,010.00

#######

1,636.20
1,636.20
508.20
508.20
2,549.47

Kg.

250

2.20

550.00

#######

300.00

300.00

#######

254.10

mes

12

180.00

2,160.00

#######

1,829.52

mes

12

250.00

3,000.00

465.85

#######

2,727.00

3,000.00

TOTAL

8,410.00

TOTAL P.S.
4,693.87

#######

global

2. Costos de Mantenimiento
Servicio de mantenimiento

TOTAL P.P.

2,727.00

7,420.87

PRECIOS PRIVADOS
AO

INVERSION

COSTOS DE O & M
SIN PROYECTO

COSTOS DE O & M CON PROYECTO


OPERACIN

MANTENIMIENTO

TOTAL

188,857.39

0.00

5,300.00

3,000.00

8,300.00

0.00

5,442.00

3,080.00

8,522.00

0.00

5,588.00

3,163.00

8,751.00

0.00

5,738.00

3,248.00

8,986.00

0.00

5,892.00

3,335.00

9,227.00

0.00

6,050.00

3,424.00

9,474.00

0.00

6,212.00

3,516.00

9,728.00

0.00

6,378.00

3,610.00

9,988.00

0.00

6,549.00

3,707.00

10,256.00

10

0.00

6,725.00

3,806.00

10,531.00

11

0.00

6,905.00

3,908.00

10,813.00

12

0.00

7,090.00

4,013.00

11,103.00

13

0.00

7,280.00

4,121.00

11,401.00

14

0.00

7,475.00

4,231.00

11,706.00

15

0.00

7,675.00

4,344.00

12,019.00

16

0.00

7,881.00

4,460.00

12,341.00

17

0.00

8,092.00

4,580.00

12,672.00

18

0.00

8,309.00

4,703.00

13,012.00

19

0.00

8,532.00

4,829.00

13,361.00

20

0.00

8,761.00

4,958.00

13,719.00

PRECIOS SOCIALES
COSTOS
INCREMENTALES

AO

INVERSION

COSTOS DE O &
M SIN
PROYECTO

COSTOS DE O & M CON PROY


OPERACIN

653,931.51

8,300.00

0.00

4,600.70

8,522.00

0.00

4,724.00

8,751.00

0.00

4,851.00

8,986.00

0.00

4,981.00

9,227.00

0.00

5,114.00

9,474.00

0.00

5,251.00

9,728.00

0.00

5,392.00

9,988.00

0.00

5,537.00

10,256.00

0.00

5,685.00

10,531.00

10

0.00

5,837.00

10,813.00

11

0.00

5,993.00

11,103.00

12

0.00

6,154.00

11,401.00

13

0.00

6,319.00

11,706.00

14

0.00

6,488.00

12,019.00

15

0.00

6,662.00

12,341.00

16

0.00

6,841.00

12,672.00

17

0.00

7,024.00

13,012.00

18

0.00

7,212.00

13,361.00

19

0.00

7,405.00

13,719.00

20

0.00

7,603.00

AGUA
AO

INVERSION

159,416

40%
COSTOS DE O &
M SIN
PROYECTO

BENEFICIOS
BRUTOS

2,931

182,382

3,010

187,270

3,090

192,288

3,173

197,442

3,258

202,733

3,345

208,166

3,435

213,745

3,527

219,474

3,622

225,356

10

3,718

231,395

11

3,818

237,597

12

3,920

243,964

13

4,026

250,502

14

4,133

257,216

15

4,244

264,109

16

4,358

271,187

17

4,475

278,455

18

4,595

285,918

19

4,718

293,580

20

4,844

301,448

ALCANTARILLADO
AO

POBLACION

INVERSION

COSTOS DE O & M

259,465

306

1,832

314

1,881

323

1,932

331

1,983

340

2,036

349

2,091

359

2,147

368

2,205

378

2,264

10

388

2,324

11

399

2,386

12

409

2,450

13

420

2,516

14

432

2,583

15

443

2,653

16

455

2,724

17

467

2,797

18

480

2,872

19

493

2,949

20

506

3,028
VACS
Indicador (Promedio Poblacional)
ICE

PTAR
AO

35%

POBLACION

INVERSION

COSTOS DE O & M

235,050

306

2,565

314

2,633

323

2,704

331

2,777

340

2,851

349

2,927

359

3,005

368

3,086

378

3,169

10

388

3,254

11

399

3,341

12

409

3,430

13

420

3,522

14

432

3,617

15

443

3,714

16

455

3,813

17

467

3,915

18

480

4,020

19

493

4,128

20

506

4,239

VACS
Indicador (Promedio Poblacional)
ICE

ALCANTARILLADO Y PTAR
AO

POBLACION

INVERSION

COSTOS DE O & M

494,515

306

4,397

314

4,514

323

4,636

331

4,760

340

4,887

349

5,018

359

5,152

368

5,291

378

5,433

10

388

5,578

11

399

5,727

12

409

5,880

13

420

6,038

14

432

6,200

15

443

6,367

16

455

6,537

17

467

6,712

18

480

6,892

19

493

7,077

20

506

7,267

VACS
Indicador (Promedio Poblacional)
ICE

COMPONENTE

INDICADOR
VAN SOCIAL

RESULTADO
S/. 1,673,658

AGUA POTABLE
TIR SOCIAL

95.68%

VAC

S/. 278,178

ICE

S/. 698.98

VAC

S/. 261,247

ALCANTARILLADO

PTAR
CE

S/. 656.44

COSTOS DE O & M CON PROYECTO


MANTENIMIENTO

TOTAL

COSTOS
INCREMENTALES

2,727.00

7,327.70

7,327.70

2,800.00

7,524.00

7,524.00

2,875.00

7,726.00

7,726.00

2,952.00

7,933.00

7,933.00

3,031.00

8,145.00

8,145.00

3,112.00

8,363.00

8,363.00

3,195.00

8,587.00

8,587.00

3,281.00

8,818.00

8,818.00

3,369.00

9,054.00

9,054.00

3,459.00

9,296.00

9,296.00

3,552.00

9,545.00

9,545.00

3,647.00

9,801.00

9,801.00

3,745.00

10,064.00

10,064.00

3,845.00

10,333.00

10,333.00

3,948.00

10,610.00

10,610.00

4,054.00

10,895.00

10,895.00

4,163.00

11,187.00

11,187.00

4,275.00

11,487.00

11,487.00

4,390.00

11,795.00

11,795.00

4,508.00

12,111.00

12,111.00

BENEFICIOS NETOS

FACTOR DE
DESCUENTO

COSTOS
INCREMENTALES

1.000

-159,416

179,451

0.909

163,137

184,260

0.826

152,281

189,198

0.751

142,148

194,269

0.683

132,688

199,475

0.621

123,858

204,821

0.564

115,616

210,310

0.513

107,922

215,947

0.467

100,741

221,734

0.424

94,037

227,677

0.386

87,779

233,779

0.350

81,938

240,044

0.319

76,485

246,476

0.290

71,395

253,083

0.263

66,645

259,865

0.239

62,210

266,829

0.218

58,070

273,980

0.198

54,206

281,323

0.180

50,598

288,862

0.164

47,231

296,604

0.149

44,088

VAN

S/. 1,673,658.10

TIR SOCIAL

95.68%

25%

FACTOR DE
DESCUENTO

1.000

259,465.42

0.909

1,665.45

0.826

1,554.55

0.751

1,451.54

0.683

1,354.42

0.621

1,264.20

0.564

1,180.31

0.513

1,101.75

0.467

1,028.65

0.424

960.16

0.386

896.00

0.350

836.28

0.319

780.65

0.290

728.80

0.263

680.18

0.239

635.11

0.218

592.82

0.198

553.37

0.180

516.55

0.164

482.19

0.149

450.09

VACS
Indicador (Promedio Poblacional)
ICE

COSTOS
INCREMENTALES

S/. 278,178.48
398
S/. 698.98

FACTOR DE
DESCUENTO

COSTOS
INCREMENTALES

1.000

235,050.03

0.909

2,331.82

0.826

2,176.03

0.751

2,031.56

0.683

1,896.73

0.621

1,770.25

0.564

1,652.22

0.513

1,542.04

0.467

1,439.64

0.424

1,343.97

0.386

1,254.56

0.350

1,171.00

0.319

1,092.90

0.290

1,020.20

0.263

952.47

0.239

889.10

0.218

829.82

0.198

774.56

0.180

723.03

0.164

674.96

0.149

630.10

VACS

S/. 261,246.98

Indicador (Promedio Poblacional)


ICE

398
S/. 656.44

DO Y PTAR
FACTOR DE
DESCUENTO

COSTOS
INCREMENTALES

1.000

494,515.44

0.909

3,997.27

0.826

3,730.58

0.751

3,483.10

0.683

3,251.14

0.621

3,034.44

0.564

2,832.53

0.513

2,643.79

0.467

2,468.29

0.424

2,304.12

0.386

2,150.56

0.350

2,007.28

0.319

1,873.55

0.290

1,748.99

0.263

1,632.65

0.239

1,524.21

0.218

1,422.64

0.198

1,327.93

0.180

1,239.59

0.164

1,157.15

0.149

1,080.19

VACS
Indicador (Promedio Poblacional)
ICE

S/. 539,425.46
398
S/. 1,355.42

AGUA POTABLE
18,000,000

INVERSION

16,000,000
14,000,000

VARIACION (%)
-40%
-30%
-20%
-10%
0%
10%
20%
30%
40%

VANS
16,544,217
16,185,598
15,826,979
15,468,360
1,673,658
14,751,123
14,392,504
14,033,885
13,675,266

TIRS

12,000,000

70.52%
59.50%
51.24%
44.81%
95.68%
35.45%
31.93%
28.94%
26.37%

10,000,000
8,000,000
6,000,000
0%

4,000,000
2,000,000
0
-40%

O&M
16,000,000
VARIACION (%)
-40%
-30%
-20%
-10%
0%
10%
20%
30%
40%

VANS
15,183,145
15,164,794
15,146,443
15,128,092
1,673,658
15,091,391
15,073,040
15,054,689
15,036,339

TIRS

14,000,000

39.85%
39.80%
39.75%
39.71%
95.68%
39.62%
39.57%
39.53%
39.48%

12,000,000
10,000,000
8,000,000
0%

6,000,000
4,000,000
2,000,000
0
-40%

ALCANTARILLADO
INVERSION
1,200
VARIACION (%)
-40%
-30%
-20%
-10%
0%

VACS
1,778,467
2,055,762
2,333,057
2,610,353
278,178

CE
440.39
509.06
577.72
646.39
698.98

LINEA DE
CORTE
653.11
653.11
653.11
653.11
653.11

1,000
800
600
0%

400

-30%

10%
20%
30%
40%

3,164,944
3,442,239
3,719,535
3,996,830

783.72
852.38
921.05
989.71

400

653.11
653.11
653.11
653.11

200
0
-40%

-30%

-40%

-30%

-40%

-30%

PTAR
INVERSION
700
VARIACION (%)
-40%
-30%
-20%
-10%
0%
10%
20%
30%
40%

VACS
873,342
992,137
1,110,933
1,229,728
261,247
1,467,319
1,586,114
1,704,909
1,823,705

CE
216.26
245.68
275.09
304.51
656.44
363.34
392.76
422.18
451.59

LINEA DE
CORTE
256.70
256.70
256.70
256.70
256.70
256.70
256.70
256.70
256.70

600
500
400
0%

300
200
100
0

ALCANTARILLADO Y PTAR
1,600

INVERSION
VARIACION (%)
-40%
-30%
-20%
-10%
0%
10%
20%
30%
40%

1,400
VACS
3,760,990
3,879,786
3,998,581
4,117,376
539,425
4,354,967
4,473,762
4,592,558
4,711,353

CE
931.31
960.73
990.14
1,019.56
1,355.42
1,078.39
1,107.81
1,137.23
1,166.64

LINEA DE
CORTE
909.81
909.81
909.81
909.81
909.81
909.81
909.81
909.81
909.81

1,200
1,000
800
600
0%

400
200
0

-40%

-30%

-20%

-10%

0%

10%

20%

30%

40%

VANS

-30%

-20%

-10%

0%

VANS

10%

20%

30%

40%

-30%

-30%

-20%

-10%

-20%

-20%
CE

10%

CE

LINEA DE CORTE

-10%

0%

CE

-30%

0%

-10%

10%

20%

20%

30%

30%

40%

40%

LINEA DE CORTE

0%

10%

LINEA DE CORTE

20%

30%

40%

CE

LINEA DE CORTE

Ao

Inversion

O&M
653,932

0
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20

7,328
7,524
7,726
7,933
8,145
8,363
8,587
8,818
9,054
9,296
9,545
9,801
10,064
10,333
10,610
10,895
11,187
11,487
11,795
12,111

Costo Total
653,932
7,328
7,524
7,726
7,933
8,145
8,363
8,587
8,818
9,054
9,296
9,545
9,801
10,064
10,333
10,610
10,895
11,187
11,487
11,795
12,111

Ingreso familiar

Consumo
(m3/ao)

Factor de
Actualizacion

63,546
64,831
66,759
68,044
69,972
71,257
73,185
75,112
76,397
78,325
80,253
82,180
84,108
86,678
88,606
90,533
93,104
95,031
97,601
100,172

1.000
0.909
0.826
0.751
0.683
0.621
0.564
0.513
0.467
0.424
0.386
0.350
0.319
0.290
0.263
0.239
0.218
0.198
0.180
0.164
0.149
10%

CIP (I+O&M) =

S/. 1.15

CIP ( I ) =

S/. 1.03

CIP ( O&M ) =

S/. 0.12

650

5%

32.5

Soles por
M3

Pago /
conex./mes
por 15 m3

Lmite de
capacidad de
pago (soles)

Est dentro
Capacidad Pago
?

Costo Incremental total por m3


consumido

1.15

17.2

32.5

SI

Costo de O&M promedio por m3


consumido

0.12

1.8

32.5

SI

Costos Unitarios / M3

Elaboracin: UF
15

Valor Actual Neto


Inversion

O&M

653,932

653,932
m3
m3
m3

Nivel
Subsidio por
conexin
0.0

0.0

6,662
6,218
5,805
5,418
5,057
4,721
4,406
4,114
3,840
3,584
3,345
3,123
2,915
2,721
2,540
2,371
2,213
2,066
1,929
1,800
74,848

Costo Total
653,932
6,662
6,218
5,805
5,418
5,057
4,721
4,406
4,114
3,840
3,584
3,345
3,123
2,915
2,721
2,540
2,371
2,213
2,066
1,929
1,800
728,780

Consumo
(m3/ao)
57,769
53,580
50,157
46,475
43,447
40,223
37,555
35,040
32,400
30,198
28,128
26,185
24,363
22,825
21,212
19,703
18,420
17,092
15,959
14,890
635,620

ETAPA

ACTIVIDADES DEL
PROYECTO
Adecuacion/Construccion de
captacion

E
J
E
C
U
C
I
O
N

O
P
E
R
A
C
I

Modificacion/Instalacion de
linea de conduccion

COMPONE
MEDIO FISICO
AGUA
Riesgo de contaminacion de
curso de agua por inadecuada
Emision de material particulado
disposicion de material
excavado
Riesgo de contaminacion de
curso de agua por inadecuada
Emision de material particulado
disposicion de material
excavado
AIRE

SUELO
Residuos solidos acumulados
no removidos del area
concreta, botar grasa al suelo
Residuos solidos acumulados
no removibles del area

Construccion de planta de
tratamiento de agua potable

Emision de material particulado

Solidos acumulados no
removidos del area

Construccion de reservorio
proyectado

Riesgo de contaminacion de
Residuos solidos generados no
curso de agua por inadecuada
Emision de material particulado
removibles del area (concreto,
disposicion de material
madera, etc)
excavado

Instalacion de redes,
conexiones y empalmes

Riesgo de alteracion de calidad Residuos solidos acumulados


Emision de material particulado de agua por inadecuada
no removibles del area bote de
desinfeccion
grasa al suelo

Operacin de captacion y
lineas de conduccion /
aduccion

Uso afecta fuentes cercanas o


actividades de riego

Operacin de planta de
tratamiento de agua

Descarga de agua de lavado

Operacin de reservorios
existentes

Inadecuado mantenimiento
Disposicion indiscriminada de
(limpieza de reservorio) genera
aguas de lavado de reservorio
perdida de calidad de agua

Descarga de lodos y material


removido

O
P
E
R
A
C
I

Operacin de redes de
conexiones

Posibilidad contaminacion por


inadecuada instalacion

Aniego /deterioro de vias por


fugas por exceso de presion
y/o inadecuadamente
instaladas

COMPONENTES DEL MEDIO AMBIENTE


MEDIO BIOLOGICO
FLORA
FAUNA

MEDIO SOCIAL
ECONOMIA

SERVICIO

Deforestacion temporal del


area

Suspension temporal del


servicio

Deforestacion temporal del


area

Suspension temporal del


servicio

SALUD

Deforestacion temporal del


area

Suspension temporal del


servicio

Suspension de transito en
calles

Suspension temporal del


servicio

Afecciones respiratorias

Afecta riego de cultivos

Suspensin del servicio por


mantenimiento

Afeccion por inadecuada


calidad de agua

Suspensin del servicio por


mantenimiento

Impacto en la salud publica por


conexiones cruzadas

Suspensin del servicio por


mantenimiento

Suspension de actividades
comerciales por rehabilitacion
de vias

Suspensin del servicio por


mantenimiento

PAISAJE
Alteracion paisajistica

Alteracion paisajistica

Alteracion paisajistica

Alteracion paisajistica

Alteracion paisajistica

COSTO DEL PLAN AMBIENTAL - ETAPA DE EJECUCION


DESCRIPCION
SUELO

COSTO S/.
550.00

* Una vez utilizada la cantera dejar la zona en su estado


original

450.00

* Durante la ejecucion de obras dar instrucciones adecuadas


para el buen manejo de maquinas y equipos, evitando la
contaminacion del suelo

100.00

AGUA

1,300.00

* Ubicar y disear las obras en base a los datos adecuados


sobre las caracteristicas del sitio.

100.00

* Realizar por fases la construccion de obras del sistema de


agua potable a fin de evitar la paralizacion del servicio

150.00

* Requerir de controles de erosion / sedimentacion durante la


construccion.

750.00

* Realizar por fases la construccion de los sistemas de


recoleccion y las obras de tratamiento de las aguas residuales,
a fin de evitar la descarga de aguas servidas crudas

300.00

AIRE

500.00

* Los equipos estacionarios localizarlos en areas no sensitivas

200.00

* Utilizar materiales adecuados que sirvan como barreras de


polvo y otras particulas

300.00

VEGETACION
* Reforestar con vegetacion natural la zona afectada por las
excavaciones.

550.00
550.00

SOCIOECONOMICA - CULTURAL

2,250.00

* Realizar las coordinaciones con el INC para la proporcion de


un CIRA (Certificado de Inexistencia de Restos Arqueologicos)

550.00

* Limitar la ejecucion del proyecto a horas diurnas, salvo


excepcion justificadas

100.00

* Analizar la ruta mas adecuada para el transporte de


materiales y equipos

100.00

* Dar el equipo y las condiciones laborales apropiadas a los


trabajadores
PAISAJE

1,500.00
350.00

* Utilizar materiales adecuados que sirvan como barreras


visuales

200.00

* Otras medidas no previstas

150.00

TOTAL

5,500.00

COSTO DEL PLAN AMBIENTAL - ETAPA DE OPERACIN


DESCRIPCION
SUELO

COSTO S/.
1,150.00

* Incorporar el manejo de lodos en los sistemas de


tratamiento, incluyendo capacitacion de personal y plan de
arranque

500.00

* Incorporar en los planes regionales el manejo de lodo, las


excretas y el material septico

650.00

AGUA

500.00

* Aprovechar la reutilizacion de aguas servidas. Especialmente


en areas de poco agua
AIRE

500.00
250.00

* Ubicar las obras de tratamiento, solamente en areas de uso


compatible de la tierra

150.00

* Capacitacion constante del personal

100.00

VEGETACION
* Considerar las medidas de proteccion de la flora local
SOCIOECONOMICA - CULTURAL

300.00
300.00
2,900.00

* Limitar el acceso a los lugares de eliminacion de aguas


servidas o lodos, donde sean inevitables los peligros de salud

300.00

* Controlar los vectores para evitar enfermedades

450.00

* Establecer un programa operacional para la limpieza de


alcantarillas

450.00

* Inspeccionar en forma rutinaria las alcantarillas en busca de


conexiones ilegales

400.00

* Sensibilizar a usuarios a fin de evitar la eliminacion de


desechos solidos en la alcantarilla

450.00

* Incorporar un plan de contingencia para responder a los


accidentes

350.00

* Proporcionar equipos de seguridad a los trabajadores

500.00

PAISAJE

500.00

* El diseo debe proporcionar armonia con los espacios


adyacentes

250.00

* Otras medidas

250.00

TOTAL

5,600.00

INDICADORES

FIN

RESUMEN DE OBJETIVOS

* 90% de la poblacin satisfecha con el servicio de agua


Mejora de las condiciones de vida de la
y alcantarillado a partir del ao 2 del proyecto.
poblacin del CP Pueblo Nuevo de Conta del
Distrito de Nuevo Imperial
* 20% de reduccin de visitas a Centro de Salud dentro
de los 03 primeros aos

PROPOSITO

ITEM

Disminuir las enfermedades


gastrointestinales, diarreicas y parasitarias en * Reduccin de enfermedades intestinales en un 30% al
el CP Pueblo Nuevo de Conta del Distrito de quinto ao de ejecucin del proyecto.
Nuevo Imperial

COMPONENTES

* Existencia del servicio de agua potable


* Existencia de un adecuado tratamiento del
recurso hidrico
* Existencia de una red de alcantarillado para la
disposicion sanitaria de excretas
* Existencia de un adecuado tratamiento de
aguas servidas
* Existencia de programas de educacion
sanitaria

* Al ao 1, el 99.55% de la poblacion contara con los


servicios de agua y alcantarillado
* Al ao 3, el 100% de la poblacion contara con los
servicios de agua y alcantarillado

* Al ao 2, la poblacion estara educada en tema de


educacion sanitaria.

ACCIONES

* Instalacion del sistema de agua potable, redes


* Costo total de la obra S/ 9'450,423.00
y conexiones domiciliarias
* Construccion de una planta de tratamiento de
agua potable

* Expediente Tecnico S/. 165,321.00

* Instalacion del sistema de alcantarillado, redes


* Presupuesto de la obra S/. 9'035,102.00
y conexiones domiciliarias
* Construccion de una planta de tratamiento de
aguas residuales
* Supervisin S/. 250,000.00
* Implementacion del programa de educacion
sanitaria

MEDIOS DE VERIFICACION

* Reduccion de reclamos por parte de la poblacion.

SUPUESTOS

* Se asume que el la Unidad de Gestion


administrada por la Municipalidad va a realizar una
adecuada operacin y mantenimiento

* Estadisticas del ministerio de salud

* Informe del Centro de Salud de la zona y la encuesta


anual del ministerio de salud.

* Adecuado prcticas de higiene por parte de la


poblacin

* Reporte de instalaciones del sistema.

* El Ministerio de Vivienda Construccion y


Saneamiento o el Gobierno Regional Lima
Provincias realizaran los desembolsos
correspondientes al proyecto

* Lista de asistencia a las capacitaciones

* La poblacion asistira a la capacitacion y ejecutara


lo planteado.

* Avances y liquidacin de obra.

* Los desembolsos presupustales no se


interrumpen. No se perturban las labores de
construccin

* Informes escritos de supervisin de obra

* La poblacin mejora hbitos de higiene y usa


adecuadamente los servicios
* Cuaderno de obra