Pressure test protocol

For Copper Pipe work In accordance with DIN 1988 Part 2

Construction Project: Location: Temperatures:


Water temperature: C Ambient temperature: C

Lines filled with water and are free of air

Preliminary test

Test duration: 30 minutes Calculated test pressure:

Test pressure: half of operating pressure kPa kPa kPa (max pd 30kPa)

Pressure after 15 minutes (test start): Pressure after 30 minutes (final pressure):

Result of prelim test:


Leakages observed

Main test

Test duration: 180 minutes Calculated test pressure: Pressure at test start:

Test pressure 1.5 times operating pressure kPa kPa kPa (max pd 10kPa)

Pressure after 180 minutes (final pressure):

Result of final test:


Leakages observed

Start of test:

End of test:

MBD representative

Client representative Signature: Print: Date: