You are on page 1of 24

ASBESTOS ENCAPSULATION

The Problem and The Solution



By: Eng. Abdullah Alshamrani

:

,



,





,




.

:




,


,




,
,


,

:



.


.





.


2 ,

.

:


,
3

,

:
- 1

(:(ASBESTOSIS

- 2 ( :) LUNG CANCER

.
-3 ( :) MESOTHELIOMA

( )
.

%70-60
, ,
.


( ) ))DONT DISTURB THE ASBESTOS


,

.
,
.

( :)ASBESTOSENCAPSULATION

( )
.

.
:
( )ASBESTOS ENCAPSULATION

( (NUKOTE COATING SYSTEMS ,
%100 .


.

.

BLDGTEC

%100
30
,
.
( )NUKOTE
75 NUKOTE ST
,

3.




,
.

) :)NUKOTE ST ASTM P189

,
).(19a-332a-8

:
.
.
NUKOTE PF
.
. , 2 -1


.
- 1 ( 1000).

.
.
,
.
4350
.
.%430
30- 170+ .

20.
.
(.)zero VOC

.

.

:










.

:


,


29.99# Mba 4350 psi

ASTM D-412

%430

%100

g/l 0

1A1 -B

25

A:689, B:650

20-10

45
24
2000PSI

BLDGTEC COMPARATIVE STUDY


Civilization Makers Consultants& Engineers


Asbestos Removal

Encapsulation Asbestos

Environmental risky
by Spreading of ACM In the air

Environmentally Friendly by Containing ACM IN Place


high cost

Save cost

Save Process

Save time

Must be Removed totally even the soil around the


building

Keep The Building For Future Use With Encapsulated


)Asbestos (100% Seal
%100

Hazardous During Demolition And Disposal


Easy & Save During Demolition And Disposal


Possible Human Mistakes During Removal



No Human Mistakes During


Removal

Possible Leak Or exposure With Earth Movement


And Flooding

Safe Under Ground after removal


LIFE IS BEAUTIFUL WITH US

BY :ABDULLAH ALSHAMRANI

THANK YOU
2012