MILLENNIUMCHALLENGEACCOUNT

MONGOLIA
VOCATIONALEDUCATIONANDTRAINING
PROJECT

DESIGN AND OVERSIGHT FOR WORKSHOP


REHABILITATION FOR DARKHAN VTPC
Darkhan soum, Darkhan-Uul aimag
-

-


Bill of Quantity

May, 2011
Ulaanbaatar

:
1.
.
2. - -
, (HWMMP)-
. HWMMP P-
734 375
.
3. - -
(EMP)-
. EMP- 646 958
.
4.

. , /,
/-
.
.

NOTE:
1. Fee for design and oversight must be excluded from a Bid price.
2. Construction work shall be in line with the Hazardous Waste and Management
Plan (HWMMP). The cost of HWMMP implementation which equals to the
amount 734 375 MNT must be included in a Bid price.
3. Construction work shall be in line with the Environmental Management Plan
(EMP). The cost of EMP implementation which equals to the amount of 646 958
MNT must be included in a Bid price.
4. Equipment will be supplied and installed by the Supplier following to each school
after completion of the civil works. The Contractor shall assist in the installation
process (electrical, ventilation works and etc.). Therefore, this process should be
included in the Contractors work plan.

/ / Construction works /including demolition


works/
01. / Repairing works
/
Name of work
1 / Dismantle brick
wall
2 100%
/Remove the wall surface totally
3 /Paint
walls with the oil paint
4 , /Concrete type hole, with a
space
5 /Construct
column without re-bars
6 /Wall emultion
7
/Remove the wall surface
8 ,
/Painting of plastered wall
9 /Remove fenestella
10 /Install plastic fenestella
11 /Load and remove all the
garbage
12 /Paint the floor
with rubber paint
13 /Remove the door case
14 /Removal of
ventilator window
15 2
/Install 2mm rack in brick wall for windows
16 200
/Plaster the
200mm egde
17 /Plaster gap underneath
the window


29.9

324.2

324.2

1.8

2.9

2
2

849.2
714.3

462.4

2
2
3

39.7
39.7
24.2

855.4

3
96

60

392.8

60

163.2

93.5

40.8

0.066

239.68

105.4

02. / New works


/
1
2
3
4
5
6
7

Name of work


/hand plastering inside of brick walls

/hand painting of plastered walls

/Plaster area of the door
/Construct a
brick wall without re-bar
/Re-bar
installations on the brick walls
/Assembling of steel
frame for PVS window
PVC /Install the PVC

162.2

8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39

wall
PVC
/Install the glassed door in PVC wall
22 /Installation
of metal doors
3.62
/Installation of metal doors

/Suspended ceiling installation
6
/6m high ladder assembly and disassembly

/Fill the gap between window frame with
spray form
/Install collapsible metal
door
/take of floor
/Dig out hole for foundation
/Compaction of soil

250/Concrete pouring for foundation for equipment
/Foundation re-bar
100/Base layer concrete
/Assembly of metal stair
/Metal stair painting
/Preparation of
wooden steps for metal stairs

/Wooden steps painting
/Assembly of wall
frame
/Preparation of metal
structure
2 /Paint the
metal structure twice with oil paint

/Installation of gypsum wall with 2
sides
2 /Painting of twice
4 /Cover
the flat roof with 4 leyer ruberoid

/Installation of sandwich walls
Rockwool /Cover the
brick wall with Rockwool material
/Install
the frame surrounding materials

//Concrete based plastering of
exterior walls
/Dig the conduit
/Remove the soil
/Cover the conduit with soil
100/Lean concrete
/Assembling of wall for conduit

19.36

251.9

714.3

162.4

3
3
3
3

1.8
17.6
10.6
11.74

0.4
2.86
1.86
1.87
15.1

30.2

3.64

3.64

3.64

20.6

30.5
2695.2

93.6

138.1

0.78

138.1

3
3
3
3
2

13.0
11.3
2.3
2.6
28.0
4

40
41
42

/Assembling cover for conduit


15/install 15 copper pipes
/Calefaction of copper pipes

70
100
5.0

, , / / Internal heating,
ventilation, water supply and plumbing /including demolition works/
/
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17

01. / Heating

Name of work

d=40 /D40mm
heating steel pipe installation
d=32 / D32mm
heating steel pipe installation
d=25 / D25mm
heating steel pipe installation
d=20 / D20mm
heating steel pipe installation
d=15 / D15mm
heating steel pipe installation
/Assembling of heaters
150 -355 /Assemble
150mm L355mm gas releaser
15 /Assemble termostate
with 15mm

40/40mm faucet installation
-20 /D20mm heating
steel pipe semi products preparation
-25 /D25mm heating
steel pipe semi products preparation
-32 / D32mm heating
steel pipe semi products preparation
-40 / D40mm heating
steel pipe semi products preparation
d=15
/15mm gas releaser installation

/Cover the heating pipe with penopoliuritan board
/System control
2 /Paint the system
twice with oil paint

124

60

30

110

145.7
2

14

30

60

124

140

38.08

464
171.68

1
1
5

140

02. , , / Ventilation
/
1
2
3
4
5
6

Name of work

KVT5025-4D/Vent installation
DVA400 D4P/ Vent installation
ISOTX355E411/Vent
installation
EL710 D4 01/ Vent installation
DDF 400/ Vent installation
315/315mm nonreturning

2
2
1

7
8
9
10
11
12

valve installation
0.252
/0.25m2 steel frame installation
315
/Installation of
vent pipe with 315mm
500
/ Installation of
vent pipe with 500mm

160-315 /Precast of vent pipe sime
products with 160-315mm

d=635 / Precast of vent pipe sime
products with 635mm
,
, d=1400 /Precast of elbows till
D1400mm

50

100

100.44

100

100.44

43

10

4
1

140

03. / Heating knot


/
1
2
3
4
5
6

Name of work

/Installation of Manometer
/Installation of metal cased
thermometer
d=100 /Assembly of steel
pipe D100
d=100 /D100 blind installation
3 /num.3
elevator station installation
150 /150mm
filter intallation

4
2

04. / Demolishing works


/
1
2

Name of work

25 /
25mm connection pipes dismantle
50 /
50mm connection pipes dismantle

354

, , / / Internal heating,
ventilation, water supply and plumbing /including demolition works/
01. / Water supply
/
1
2

Name of work


15/15mm indoor PVC pipe installation

20/20mm indoor PVC pipe installation

16

54

3
4
5
6
7
8
9
10


25/ 25mm indoor PVC pipe installation
50/50mm fire hydrant out
15 /15mm valve installation
20 /20mm ball valve
installation
d=25 / 25mm valve installation
.
D=15-50 /Clean the pipe with water with chloride
/System control
/Electric boiler installation

18

6
6
2

2
0.088

88
1

54

1
1
1

6
4
6

02. / Sewerage
/
1
2
3
4
5
6

Name of work

50/50mm PVC pipe


installation
100/ 100mm PVC pipe
installation
/Sink installation
100 / Sewage point
/Sink thermomixer
installation
/-100 / / Sewage trap

24

, , , ,
/ / Internal electrical, lighting, grounding, communication, fire
safety systems /including demolition works/
01. / Electrical works
/
1
2
3
4
5
6
7
8
9

Name of work

-1/Main distribution
panel board installation
-1/Equipment distribution
board installation
-2/ Equipment
distribution board installation
-3, -4/ Equipment
distribution board installation
-1/Light
distribution board installation

60/Compact fluorescent lamp for the walls

236 IP20/Fluorescent lamp sep up to the ceiling
installation

418 IP20/Fluorescent lamp set up to the ceiling
installation
, /Exit-enter lights

90

72

3
7

10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31

installation
/ fluorescent
lamp set up to the ceiling

60/ Compact fluorescent lamp for the ceiling
installatiom
/Single switch installation
/Double switch
installation
/ Switch installation
2
25015/ Installation receptacle in
wainscoting
380 20/
Installation receptacle in wainscoting
/Socket installation
/Wire distribution box
installation
12.52
1- /PVC conduit copper wire
installation
162 / PVC conduit
copper wire installation
1102 / PVC conduit
copper wire installation
142 / PVC conduit
copper wire installation
162
1- / PVC conduit copper wire installation
252
1- / PVC conduit copper wire installation
20/20mm PVC pipe
assembly
26/ 26mm PVC pipe
assembly
32/ 32mm PVC pipe
assembly
40/ 50mm PVC pipe
assembly
50/ 50mm PVC pipe
assembly
162/16mm2 Copper wire

/Grounding wire box installation

9
5

2
36

25

100
200

10000

1200

180

100

300

240

3000

400

60

100

50

20
5

02. / Communication
/
1
2
3
4
5

Name of work

/Installation in the wall


/Phone distribution
box installation
PVC /PVC pipe installasion
/Phone installation cable
/Phone box


1
1
100
100
7
8

6
7
8
9
10
11
12
13
14
15
16

/PC Network switch


/PC
network user box
/PC cable assembly
, /Fire signal
station
/Fire signal hand detector
/Smoke detector
/ Smoke detector
/Fire signal box
/Fire signal alarm
/Wire installation
PVC /PVC pipe assembly

1
10

200
1

3
19
16
1
1
350
250

/ Storage for oxygen and acetylene

01. / Land works


/
1
2
3

/
1
2
3
4

Name of work

/Excavation for conduit



/Compaction
/Spread the dirt
02. / Foundation works
Name of work
100/Lean concrete
7.5/Concrete pouring of
foundation
/Re-bar works
/Concrete pouring

03. , / Wall and partition wall works


/
Name of work
1
2
3

/
1
2

380 - /380mm wall assembly


0.1 /Erection of lintel up to 0.1t
weight
/re-bar works
04. / Slab works
Name of work
150/Concrete pouring
/re-bar works

05. / Roofing works


/
Name of work
1

1 / re-bar

3
3

2.7

3
3

0.125
11.7

0.064

2.8
0.3

1.14
5.2

17.9
6

2
0.62

13.73
9

2
3
4
5
6
7
8

works

120/120mm penopolistrol board for roof
20
15/Cement bed first 15mm of 20mm
1 /Cement bed rest
30-
/Roof cement bed must bi 30mm
20 /20mm cement
bed
5
/every 5mm change the thickness
of cement bed
3 /Cover
roof with ruberoid 3 leyers

06. / Door and window works


/
Name of work
1
2
3

/
1
2

/
1
2
3

3 2
/Install doors with 3m2 dimentions indoor and
outdoor purpose
/install the locks for doors

/Fill the gap between door frame and a wall with
spray form
07. / Exterior finishing works
Name of work

//Cover the outside walls with clay

/Paint outside walls with emulsion paint
08. / Interior finishing works
Name of work
/Plaster walls
/Emulsion painting on plastered
wall
/Ceiling emulsion

13.73

13.73

2
2

68.65
13.73

13.73

27.46

36.8

2
4.2

47.1

2
2

11.44

4.2

47.1

40.6
44.8

10

,
/ Hazardous waste and materials management
plan works
/
1

/ Name of work

/ Removing old mercury and PCB

/
Measuring unit
Piece

/Total cost (MNT)

/
Quantity
125

734 375

/
Environmental management plan works

/
1
2
3

4
5
6

/ Name of work
/ To
flatten for grass by hand
,
/ To dig natural soil
by hand
, 0,50,4
/ To plant
bushes with roots and soil into 0.5x0.4m size
standard holes
,
/ Watering by hose, clearing
roads and yards
/
Bedding grass by semination of perennials plants
seed
/ To make address
/ Total cost (MNT)

/Measuring
unit
2

/
Quantity
25

50

25

646 958