Plan Actual
(Date) (Date)
Date: 10 - September. 20
Rev. - 0 -
3-Week Schedule Last Week This Week September. 2012 Durati (Practice) on Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Finish Start Finish 3 4 5 6 7 8 9 10 11 12 13 14
Sat 15
Next Week Sept. 2012 Sun Mon Tue Wed Thu Fri 16 17 18 19 20 21
Sat 22
Sun 23
B 5 6 7 8 13 14 15 17 18 19 20 21
Electrical System Laid LV Cable (25 Set, 6056 Meters) & Termiantion & Glanding Laid Control Cable (42 Set, 9516 Meters) & Termination & Glanding Power Up HT & LV Power Supply for BTX Substation Power Up LV Power Supply for TBA Plant Install Support (Concerete Footing) for Street Lighting Laid Cable for Light Fitting Convenience Box & Termination at Laid Cable For Street Lighting Light-Up all the Lighting for TBA Plant Install & Assist on Modify Fire Alarm Panel Install Cable Tray (Branch Out) for Fire Alarm at TBA Plant Install Manual Call Push Button & Sounder Laid Cable & Termination 22-Jul 26-Jul 22-Jul 26-Jul 24-Jul 7-Sep 6-Aug 30-Jul 23-Jul 23-Jun 2-Aug 19-Aug 1-Aug 3-Aug 3-Sep 29-Aug 30-Aug 12-Aug 12-Aug 31-Jul 7-Sep 18-Aug 1-Sep 11-Aug 22-Aug 25-Aug 15-Aug 26-Aug 8-Sep 8-Sep 12-Sep 22 22 8 13 34 20 21 7 15 24 11 14
C 4 6 7 8 9 10
Instrument System Laid Cable Install Field Instrument Install Hook-up & Tubing Instrument Resistance and Continuity Test Power Up Instrument System Loop Check 9-Jul 6-Aug 9-Jul 16-Jul 16-Jul 16-Jul 19-Aug 29-Aug 1-Sep 18-Aug 25-Aug 19-Aug 2-Sep 1-Sep 24-Sep 41 48 35 15 4 24
E 7
Miscellaneous (Sub Work) Testing for 6.6kV Switchgear, Transformer and MCC 8-Aug 8-Aug 16-Aug 5-Sep