Professional Documents
Culture Documents
Burj Al Dubai Facts and Structural Details Presentation - (Malestrom)
Burj Al Dubai Facts and Structural Details Presentation - (Malestrom)
Contents
1.
2.
Models
Project Brief
3.
4.
5.
6. 7. 8.
Sequence of Work
Cranage & Hoisting Concrete Placement Survey & Monitoring
9.
10.
Spire Erection
Photographs
Model
The Burj is a landmark high rise structure part of a very important development scheme in downtown Dubai
Model
Some artistical impressions
Model
Model
Model
Model
Project Brief
Pinnacle Spire
Communication (L160)
Office (L153)
Cost
Owner
876,000,000 USD
EMAAR Properties Above 160 floors Above 800m Hotel, Residence, Office
Observatory (L123) Residence (L108)
Hotel (L39)
Project Brief
.Client Emaar Properties PJSC
.Consultants
Turner Construction Intl. Skidmore, Owings & Merill (SOM) Hyder Consulting DG Jones Intl.
.Construction Period
Structural Overview
Y-shaped floor plan is ideal for residential program Maximizes window perimeter to floor plate area Is inherently stable Buttressed core Three wings arranged around central core Each wing supports other two
Setbacks occur at each wing in a spiraling pattern Reduces vortex shedding by changing building shape 2 4 times
Structural Overview
Analysis Model
Structural Overview
Hotel Residential Floor plan
Structural Overview
Tower Seismic Design 500 year Event Wind Typically Governs Seismic Only Governs near Top
Structural Overview
Predicted Wind Drift Location Elevation Drift (m) (mm)
Top Communications
Top Office Observatory
+604.9 1450
+569.7 1250 +442.1 +375.3 750 540
Top Residential
Structural Overview
Sequence of Work
Typical Work Sequence
wing-A
C-1
C-3
[Section A-A]
C-2
wing-C
wingB
3 to 5 levels below
2 levels below
2 levels below 6 to 8 levels below Wing Slab 3levels below Wing Corridor Slab Corner Slab Center Lobby Slab Nose Slab Wing Corewall Center Corewall Corner Slab
Sequence of Work
Work Sequence & Shoring Plan
Day 0 : Conc Pouring Day 1 : Slab formwork Day 2 : Slab formwork : Rebar Installation : MEP
N+1
N+0 Form N-1 Additional Raking Shore Form N-2 1/2 of Raking Shore 1/2 of Raking Shore 2/3 of Prop 2/3 of Prop N-5 1/3 of Prop 1/2 of Raking Shore 2/3 of Prop Form Form
N-3
N-4
. Hoist - 14 cages Phase 1 (Ground ~ L100) : H/C#1~#4 (8cages) Phase 2 (L100 ~ L142) Phase 3 (L142 ~ SL2) : H/C#5~#6 (4 cages) : H/C#7 (2 cages)
H/C#3~4 H/C#7 T/C#M2 T/C#M3
Jump Hoist : Jump#1, Jump#2 (2 cages) . Concrete Pump - 4 nos. Pump#1~#3 (Ground Level) : High Pressure Pump#4 (L124) for Secondary Pumping
H/C#5~6 H/C#1~2
T/C#M1
T/C#M2 M380D
T/C#M3 M220D
T/C#M1 : M440D
Clamping Height : 15.5 ~ 17m Bottom collar
23
1st Station
W
22
21
SPIRE LEVEL 3 - MEZZANINE T/STEEL EL: +640.0 SPIRE LEVEL 3 - MEZZANINE T/STEEL EL: +640.0 SPIRE LEVEL 3 - MEZZANINE T/STEEL EL: +640.0
20
19
18
SPIRE LEVEL 2 - MEZZANINE2 T/STEEL EL: +627.2 SPIRE LEVEL 2 - MEZZANINE2 T/STEEL EL: +627.2 SPIRE LEVEL 2 - MEZZANINE2 T/STEEL EL: +627.2
17
16
SPIRE LEVEL 2 - MEZZANINE1 T/STEEL EL: +620.8 SPIRE LEVEL 2 - MEZZANINE1 T/STEEL EL: +620.8 SPIRE LEVEL 2 - MEZZANINE1 T/STEEL EL: +620.8
15
14
2nd
Station: L99
LEVEL 160 LEVEL 159 LEVEL 158 LEVEL 157
13
LEVEL 162 / SPIRE LEVEL 1 T/SLAB EL: +608.0 LEVEL 162 / SPIRE LEVEL 1 T/SLAB EL: +608.0 LEVEL 162 / SPIRE LEVEL 1 T/SLAB EL: +608.0
12
11
LEVEL 161 T/SLAB EL: +601.9 LEVEL 161 T/SLAB EL: +601.9 LEVEL 161 T/SLAB EL: +601.9
10
10
LEVEL 160
8 8
LEVEL 160
LEVEL 160
LEVEL 159
7 7 6 6
LEVEL 159
LEVEL 159
LEVEL 158
LEVEL 158
LEVEL 158
LEVEL 157
LEVEL 157
LEVEL 157
LEVEL 156
LEVEL 156
LEVEL 156
LEVEL 156
LEVEL 155 LEVEL 154 LEVEL 153 LEVEL 152 LEVEL 151 LEVEL 150 LEVEL 149 LEVEL 148 LEVEL 147
LEVEL 155 LEVEL 154 LEVEL 153 LEVEL 152 LEVEL 151 LEVEL 150 LEVEL 149 LEVEL 148 LEVEL 147
LEVEL 155 LEVEL 154 LEVEL 153 LEVEL 152 LEVEL 151 LEVEL 150 LEVEL 149 LEVEL 148 LEVEL 147
LEVEL 155
LEVEL 154
LEVEL 153
LEVEL 152
LEVEL 151
LEVEL 150
LEVEL 149
LEVEL 148
LEVEL 147
LEVEL 145
LEVEL 145
LEVEL 145
LEVEL 145
LEVEL 143
LEVEL 142
LEVEL 141
LEVEL 140
LEVEL 135
LEVEL 135
LEVEL 135
LEVEL 135
LEVEL 130
LEVEL 130
LEVEL 130
LEVEL 130
LEVEL 125
LEVEL 125
LEVEL 125
LEVEL 125
LEVEL 120
LEVEL 120
LEVEL 120
LEVEL 120
LEVEL 115
LEVEL 115
LEVEL 115
LEVEL 115
LEVEL 110
LEVEL 110
LEVEL 110
LEVEL 110
2nd
Station
LEVEL 105 LEVEL 105 LEVEL 105
S6 S5 S4 S3 S2 S1 S6 S5 S4 S3 S2 S1 S6 S5 S4 S3 S2 S1
LEVEL 105
4500
4500
4500
4500
4500
4500
4500
4500
4500
4500
4500
4500
4500
4500
4500
23
22
21
SPIRE LEVEL 3 - MEZZANINE T/STEEL EL: +640.0 SPIRE LEVEL 3 - MEZZANINE T/STEEL EL: +640.0 SPIRE LEVEL 3 - MEZZANINE T/STEEL EL: +640.0 SPIRE LEVEL 3 - MEZZANINE T/STEEL EL: +640.0
20
19
18
SPIRE LEVEL 2 - MEZZANINE2 T/STEEL EL: +627.2 SPIRE LEVEL 2 - MEZZANINE2 T/STEEL EL: +627.2
17
16
SPIRE LEVEL 2 - MEZZANINE1 T/STEEL EL: +620.8 SPIRE LEVEL 2 - MEZZANINE1 T/STEEL EL: +620.8 SPIRE LEVEL 2 - MEZZANINE1 T/STEEL EL: +620.8 SPIRE LEVEL 2 - MEZZANINE1 T/STEEL EL: +620.8
15
14
13
LEVEL 162 / SPIRE LEVEL 1 T/SLAB EL: +608.0 LEVEL 162 / SPIRE LEVEL 1 T/SLAB EL: +608.0
12
11
LEVEL 161 T/SLAB EL: +601.9 LEVEL 161 T/SLAB EL: +601.9 LEVEL 161 T/SLAB EL: +601.9 LEVEL 161 T/SLAB EL: +601.9
10
10
LEVEL 160
8
LEVEL 160
8
LEVEL 160
LEVEL 160
LEVEL 159
7 6
LEVEL 159
7 6
LEVEL 159
LEVEL 159
LEVEL 158
LEVEL 158
LEVEL 158
LEVEL 158
LEVEL 157
LEVEL 157
LEVEL 157
SPIRE LEVEL 5 - MEZZANINE1 T/STEEL EL: +659.3
LEVEL 157
SPIRE LEVEL 5 - MEZZANINE1 T/STEEL EL: +659.3
LEVEL 156
LEVEL 156
LEVEL 156
LEVEL 156
LEVEL 155 LEVEL 154 LEVEL 153 LEVEL 152 LEVEL 151
LEVEL 155
SPIRE LEVEL 4 - MEZZANINE T/STEEL EL: +652.9
LEVEL 155 LEVEL 154 LEVEL 153 LEVEL 152 LEVEL 151 LEVEL 150 LEVEL 149 LEVEL 148 LEVEL 147
SPIRE LEVEL 3 T/STEEL EL: +633.6 SPIRE LEVEL 3 - MEZZANINE T/STEEL EL: +640.0 SPIRE LEVEL 4 T/STEEL EL: +646.4 SPIRE LEVEL 4 - MEZZANINE T/STEEL EL: +652.9
LEVEL 153 LEVEL 152 LEVEL 151 LEVEL 150 LEVEL 149 LEVEL 148 LEVEL 147
19 21 22
20
LEVEL 147
18
LEVEL 145
LEVEL 145
17
LEVEL 145
SPIRE LEVEL 2 - MEZZANINE2 T/STEEL EL: +627.2
LEVEL 143
16
LEVEL 143
SPIRE LEVEL 2 - MEZZANINE1 T/STEEL EL: +620.8
LEVEL 145
SPIRE LEVEL 2 - MEZZANINE2 T/STEEL EL: +627.2
14
13
LEVEL 162 / SPIRE LEVEL 1 T/SLAB EL: +608.0 LEVEL 162 / SPIRE LEVEL 1 T/SLAB EL: +608.0
12
LEVEL 135
LEVEL 135
11
LEVEL 161 T/SLAB EL: +601.9
LEVEL 135
LEVEL 135
LEVEL 161 T/SLAB EL: +601.9
10
10
LEVEL 130
LEVEL 160
LEVEL 130
LEVEL 130
LEVEL 130
LEVEL 159
7
LEVEL 125
LEVEL 125
LEVEL 125
6
LEVEL 125
LEVEL 158
LEVEL 120 LEVEL 120
LEVEL 158
LEVEL 120
LEVEL 157
LEVEL 157
Main T/C
LEVEL 120 LEVEL 115
LEVEL 115
LEVEL 156
LEVEL 115
LEVEL 115
LEVEL 156
LEVEL 110
LEVEL 110
LEVEL 110
LEVEL 110
LEVEL 105
LEVEL 152
S5 S4 S3 S2 S1
LEVEL 105
LEVEL 105
LEVEL 152
S5 S4 S3 S2 S1
LEVEL 105
S6
4500
4500
4500
4500
4500
S6
S5
S4
S3
S2
S1
S6
4500
4500
4500
4500
4500
4500
4500
4500
4500
4500
S6
S5
S4
S3
S2
S1
4500
4500
4500
4500
4500
23
22
1st Station
SPIRE LEVEL 4 - MEZZANINE T/STEEL EL: +652.9 SPIRE LEVEL 4 T/STEEL EL: +646.4 SPIRE LEVEL 3 - MEZZANINE T/STEEL EL: +640.0 SPIRE LEVEL 3 T/STEEL EL: +633.6 SPIRE LEVEL 2 - MEZZANINE2 T/STEEL EL: +627.2 SPIRE LEVEL 2 - MEZZANINE1 T/STEEL EL: +620.8
21
SPIRE LEVEL 3 - MEZZANINE T/STEEL EL: +640.0 SPIRE LEVEL 3 - MEZZANINE T/STEEL EL: +640.0 SPIRE LEVEL 3 - MEZZANINE T/STEEL EL: +640.0
20
19
18
SPIRE LEVEL 2 - MEZZANINE2 T/STEEL EL: +627.2
17
16
SPIRE LEVEL 2 - MEZZANINE1 T/STEEL EL: +620.8 SPIRE LEVEL 2 - MEZZANINE1 T/STEEL EL: +620.8 SPIRE LEVEL 2 - MEZZANINE1 T/STEEL EL: +620.8
15
14
13
LEVEL 162 / SPIRE LEVEL 1 T/SLAB EL: +608.0
12
11
LEVEL 161 T/SLAB EL: +601.9 LEVEL 161 T/SLAB EL: +601.9 LEVEL 161 T/SLAB EL: +601.9 LEVEL 161 T/SLAB EL: +601.9
10
10
LEVEL 160
8
LEVEL 160
8
LEVEL 160
LEVEL 160
LEVEL 159
7 6
LEVEL 159
7 6
LEVEL 159
LEVEL 158
LEVEL 158
LEVEL 158
LEVEL 157
SPIRE LEVEL 5 - MEZZANINE1 T/STEEL EL: +659.3
LEVEL 157
LEVEL 157
SPIRE LEVEL 5 - MEZZANINE1 T/STEEL EL: +659.3 SPIRE LEVEL 5 - MEZZANINE1 T/STEEL EL: +659.3
LEVEL 156
LEVEL 156
LEVEL 156
LEVEL 155
LEVEL 155 LEVEL 154 LEVEL 153 LEVEL 152 LEVEL 151 LEVEL 150 LEVEL 149 LEVEL 148 LEVEL 147
LEVEL 155
SPIRE LEVEL 4 - MEZZANINE T/STEEL EL: +652.9
23
22
LEVEL 147
by Ogawa OT4520.
18
LEVEL 145
17
LEVEL 145
SPIRE LEVEL 2 - MEZZANINE2 T/STEEL EL: +627.2
LEVEL 145
LEVEL 145
SPIRE LEVEL 2 - MEZZANINE2 T/STEEL EL: +627.2 SPIRE LEVEL 2 - MEZZANINE2 T/STEEL EL: +627.2
LEVEL 143
16
LEVEL 143
SPIRE LEVEL 2 - MEZZANINE1 T/STEEL EL: +620.8
SPIRE LEVEL 2
14
13
LEVEL 162 / SPIRE LEVEL 1 T/SLAB EL: +608.0 LEVEL 162 / SPIRE LEVEL 1 T/SLAB EL: +608.0 LEVEL 162 / SPIRE LEVEL 1 T/SLAB EL: +608.0
12
LEVEL 135
11
LEVEL 135
LEVEL 161 T/SLAB EL: +601.9
LEVEL 135
LEVEL 135
LEVEL 161 T/SLAB EL: +601.9
10
10
LEVEL 130
LEVEL 160
LEVEL 130
LEVEL 130
LEVEL 160
LEVEL 159
7
LEVEL 159
7
LEVEL 159
LEVEL 125 LEVEL 125
6
LEVEL 125
LEVEL 125
6
LEVEL 158
LEVEL 120
LEVEL 158
LEVEL 120 LEVEL 120
LEVEL 158
LEVEL 120
Favco SDD3/10
LEVEL 157
LEVEL 157
LEVEL 157
LEVEL 156 115 LEVEL LEVEL 155 LEVEL 154 LEVEL 153 LEVEL 152 LEVEL 151 LEVEL 150 99 LEVEL LEVEL 149 LEVEL 148
LEVEL 105
LEVEL 115
LEVEL 156
LEVEL 115
LEVEL 115
LEVEL 156
LEVEL 110
LEVEL 110
LEVEL 110
LEVEL 110
2nd Station
LEVEL 153 LEVEL 152
S5 S4 S3 S2 S1
LEVEL 105
LEVEL 105
LEVEL 105
LEVEL 152
S5 S4 S3 S2 S1
S6
S5
S4
S3
S2
S1
S6
4500
4500
4500
4500
4500
4500
4500
4500
4500
4500
S6
S5
S4
S3
S2
S1
S6
4500
4500
4500
4500
4500
4500
4500
4500
4500
4500
LEVEL 100
LEVEL 145
LEVEL 145
LEVEL 145
LEVEL 140
LEVEL 140
LEVEL 135
23 22
LEVEL 135
SPIRE LEVEL 4 - MEZZANINE T/STEEL EL: +652.9 SPIRE LEVEL 4 T/STEEL EL: +646.4
LEVEL 135
LEVEL 135
21
SPIRE LEVEL 3 - MEZZANINE T/STEEL EL: +640.0 SPIRE LEVEL 3 - MEZZANINE T/STEEL EL: +640.0 SPIRE LEVEL 3 - MEZZANINE T/STEEL EL: +640.0 SPIRE LEVEL 3 - MEZZANINE T/STEEL EL: +640.0
20
19
18
SPIRE LEVEL 2 - MEZZANINE2 T/STEEL EL: +627.2 SPIRE LEVEL 2 - MEZZANINE2 T/STEEL EL: +627.2 SPIRE LEVEL 2 - MEZZANINE2 T/STEEL EL: +627.2 SPIRE LEVEL 2 - MEZZANINE2 T/STEEL EL: +627.2
17
LEVEL 130
W
16
LEVEL 130
SPIRE LEVEL 2 - MEZZANINE1 T/STEEL EL: +620.8 SPIRE LEVEL 2 T/STEEL EL: +617.6
LEVEL 130
W
LEVEL 130
15
14
13
LEVEL 162 / SPIRE LEVEL 1 T/SLAB EL: +608.0 LEVEL 162 / SPIRE LEVEL 1 T/SLAB EL: +608.0 LEVEL 162 / SPIRE LEVEL 1 T/SLAB EL: +608.0 LEVEL 162 / SPIRE LEVEL 1 T/SLAB EL: +608.0
12
11
10
10
LEVEL 160
LEVEL 160
LEVEL 160
8
LEVEL 160
LEVEL 125
LEVEL 159
7 6
LEVEL 125
LEVEL 159
7 6
LEVEL 159
LEVEL 125
LEVEL 159
LEVEL 125
LEVEL 158
LEVEL 158
LEVEL 158
LEVEL 158
LEVEL 157
LEVEL 157
LEVEL 157
LEVEL 157
LEVEL 156
LEVEL 156
LEVEL 156
LEVEL 156
LEVEL 155
LEVEL 155 LEVEL 154 LEVEL 153 LEVEL 152 LEVEL 151 LEVEL 150 LEVEL 149 LEVEL 148
LEVEL 155 LEVEL 154 LEVEL 153 LEVEL 152 LEVEL 151 LEVEL 150 LEVEL 149 LEVEL 148 LEVEL 147
LEVEL 155
LEVEL 120
LEVEL 120
LEVEL 154 LEVEL 153 LEVEL 152 LEVEL 151 LEVEL 150 LEVEL 149 LEVEL 148
LEVEL 120
LEVEL 115
LEVEL 147
LEVEL 115
LEVEL 147
LEVEL 115
LEVEL 147
LEVEL 115
LEVEL 145
LEVEL 145
LEVEL 145
LEVEL 145
LEVEL 143
LEVEL 143
LEVEL 143
LEVEL 110
LEVEL 110
LEVEL 110
LEVEL 110
LEVEL 135
LEVEL 135
Ogawa OT4520
LEVEL 105
LEVEL 105
LEVEL 105
LEVEL 105
LEVEL 130 LEVEL 130
LEVEL 130
LEVEL 130
S6
S5
S4
S3
S2
S1
S6
S5
S4
S3
S2
S1
4500
4500
4500
4500
4500
4500
4500
4500
4500
4500
4500
4500
4500
4500
4500
4500
4500
4500
4500
4500
LEVEL 125
LEVEL 125
LEVEL 125
LEVEL 125
LEVEL 100
L99
LEVEL 99
LEVEL 115
LEVEL 115
LEVEL 115
LEVEL 115
LEVEL 110
LEVEL 110
LEVEL 110
LEVEL 110
LEVEL 105
LEVEL 105
LEVEL 105
2nd Station
S5 S4 S3 S2 S1
Favco SDD3/10
S5 S4 S3 S2 S1
LEVEL 105
S6
S5
S4
S3
S2
S1
S6
S5
S4
S3
S2
S1
S6
S6
4500
4500
4500
4500
4500
4500
4500
4500
4500
4500
4500
4500
4500
4500
4500
4500
4500
4500
4500
4500
BW
B11
C11
BV
BU
Concrete Placement
B10 C10
85 00
85
00
850 0
85 00
85
00
B9
C9
850 0
85
00
85
00
B8
C8
85
00
B7 C7
85 85
00
850 0
00
B6 C6
85 85
00
BT
00
85
00
850 0
Height 531 m
BN
850 0
850 0
Remarks Target Height (RC Structure) Secondary Pump on L124 (East wing 442m) From Ground Level
Pumping Area (Ground Level)
BP
624 m
BL
BM
681.7 m
BK BJ
. Concrete Pump
BH
900 0
900 0
900 0
850 0
850 0
850 0
850 0
Level
Pressure
BG
Output
Pipe Lines
BE
Pump#4
850 0
850 0
Pump#1~#3
BF
850 0
850 0
850 0
850 0
850 0
- 32m boom for Center Core - 3nos. of 28m boom for Wing Core . Pipe Lines
CPB#1
CPB#3
CPB#2
Concrete Placement
Pipe Line Schedule
Line#1. (L160) for Center Core Pinnacle Top of Finial : Spire
Line#3. (L124) for East Wing Line#4. (L112) for West Wing
Concrete Placement
WN2 WN1 W WS1 WS2
Re-pumping
WS2
WS1
WN1
WN2
4500
4500
4500
4500
W4
4500
Spire1 (682m)
4500
W3
W2
Line#1 (~L154)
S1 LEVEL 158 S2 S3
4500
W1 E1
0 450
LEVEL 157 LEVEL 156 LEVEL 155 CPB#2 LEVEL 154 LEVEL 153
0 450
450 0
E2
450 0
E3
SE2
Line#2 (~L139)
L124 (442m)
LEVEL 157 LEVEL 147 LEVEL 156 LEVEL 155 LEVEL 154 LEVEL 153
Secondary Pump
LEVEL 154
LEVEL 143 LEVEL 153
450 0
SE1
ES2
450 0
LEVEL 152
LEVEL 152
0 450
ES1
450 0
450 0
EN1
CPB#1
XYZ
XYZ
XYZ
XYZ
XYZ
ANTENNA
ANTENNA
ANTENNA
REFERENCE STATION
- Location ; B2 Level
- Plan for Integrating Raft and Survey Monitoring . Strain Gauge & Extensometer - Total number ; 211EA (except Raft) - Location : Outrigger Floor Level
Level 76 Level 72
Level 92
: Middle Floor Level between Outrigger Floors : Level 5, 16, 19, 26, 39, 43, 58, 72, 76, 92, 108, 112, 138, 146 (14 Floors)
Level 58
. Wind Speed/Direction, Temperature, Humidity - Location ; Level 5, 43, 76, 112, 146 (Tower Outside)
Spire Erection
Spire Erection
Spire Erection Method
Completion of Lifting
Spire Erection
Thank you !
Photographs
22/01/2005
Photographs
Photographs
Photographs
Photographs
Thank you !