You are on page 1of 44

The Burj Tower

Presentation Constructing the Worlds highest Tower


THE BURJ TOWER

Contents
1.
2.

Models
Project Brief

3.
4.

Figures & Quantities


Structural Overview

THE BURJ TOWER

5.
6. 7. 8.

Sequence of Work
Cranage & Hoisting Concrete Placement Survey & Monitoring

9.
10.

Spire Erection
Photographs

Model
The Burj is a landmark high rise structure part of a very important development scheme in downtown Dubai

THE BURJ TOWER

Model
Some artistical impressions

THE BURJ TOWER

THE BURJ TOWER

Model

THE BURJ TOWER

Model

THE BURJ TOWER

Model

THE BURJ TOWER

Model

Project Brief
Pinnacle Spire

Project Name Duration

The Burj Tower 47Months (Feb. 05 ~ Dec. 08)

Communication (L160)

Office (L153)

Cost
Owner

876,000,000 USD
EMAAR Properties Above 160 floors Above 800m Hotel, Residence, Office
Observatory (L123) Residence (L108)

THE BURJ TOWER

Floors Height Usage

Hotel (L39)

Project Brief
.Client Emaar Properties PJSC

.Consultants

Project Manager Design

Turner Construction Intl. Skidmore, Owings & Merill (SOM) Hyder Consulting DG Jones Intl.

THE BURJ TOWER

Supervision Quantity Surveyor

.Construction Period

01 Feb 2005 30 Dec 2008

Figures & Quantities

Some salient figures and quantities:

Total height of the tower : More than 800 M


Gross area tower : 279,000 sq. M Gross area podium : 186,000 sq. M Total concrete quantity tower : 145,000 cubic M Total concrete quantity podium : 115,000 cubic M Overall concrete quantity : 260,000 cubic M Overall rebar quantity : 34,000 tons

THE BURJ TOWER

Structural Overview

Y-shaped floor plan is ideal for residential program Maximizes window perimeter to floor plate area Is inherently stable Buttressed core Three wings arranged around central core Each wing supports other two

THE BURJ TOWER

Setbacks occur at each wing in a spiraling pattern Reduces vortex shedding by changing building shape 2 4 times

2003 All rights reserved.

Structural Overview

THE BURJ TOWER

Analysis Model

Structural Overview
Hotel Residential Floor plan

THE BURJ TOWER

Typical Floor Plan

Structural Overview
Tower Seismic Design 500 year Event Wind Typically Governs Seismic Only Governs near Top

THE BURJ TOWER

Structural Overview
Predicted Wind Drift Location Elevation Drift (m) (mm)

Top Communications
Top Office Observatory

+604.9 1450
+569.7 1250 +442.1 +375.3 750 540

THE BURJ TOWER

Top Residential

50 year wind event

Structural Overview

THE BURJ TOWER

3D View Under Construction

Sequence of Work
Typical Work Sequence
wing-A

C-1

C-3

[Section A-A]

C-2

wing-C

wingB

[Work Sequence] Level 0

THE BURJ TOWER

Level -1 Level -2 Level -3 Level -4 Level -5 Level -6 Level -7 Level -8 Level -9

3 to 5 levels below

2 levels below

2 levels below 6 to 8 levels below Wing Slab 3levels below Wing Corridor Slab Corner Slab Center Lobby Slab Nose Slab Wing Corewall Center Corewall Corner Slab

Sequence of Work
Work Sequence & Shoring Plan
Day 0 : Conc Pouring Day 1 : Slab formwork Day 2 : Slab formwork : Rebar Installation : MEP
N+1

Day 3 : Conc Pouring

N+0 Form N-1 Additional Raking Shore Form N-2 1/2 of Raking Shore 1/2 of Raking Shore 2/3 of Prop 2/3 of Prop N-5 1/3 of Prop 1/2 of Raking Shore 2/3 of Prop Form Form

THE BURJ TOWER

N-3

N-4

Tower Slab Formwork

Cranage & Hoisting


Overall Equipments Layout
. Tower Crane - 3 nos.
T/C#M1 : Favco M440D (25ton) T/C#M2 : Favco M380D (25ton) T/C#M3 : Favco M220D (11ton)
Pump#1~#3

. Hoist - 14 cages Phase 1 (Ground ~ L100) : H/C#1~#4 (8cages) Phase 2 (L100 ~ L142) Phase 3 (L142 ~ SL2) : H/C#5~#6 (4 cages) : H/C#7 (2 cages)
H/C#3~4 H/C#7 T/C#M2 T/C#M3

THE BURJ TOWER

Jump Hoist : Jump#1, Jump#2 (2 cages) . Concrete Pump - 4 nos. Pump#1~#3 (Ground Level) : High Pressure Pump#4 (L124) for Secondary Pumping

H/C#5~6 H/C#1~2

. Concrete Placing Boom - 4 nos.

CPB#1. for Center core : 32m Boom


CPB#2~#4. for Wing core : 28m Boom

T/C#M1

Cranage & Hoisting


Tower Crane Installation Method

T/C#M2 M380D

T/C#M3 M220D

Conc Placing Boom Climbing

Core wall form 3rd Bracket Installation

THE BURJ TOWER

Installation Height : 48m Top collar

T/C#M1 : M440D
Clamping Height : 15.5 ~ 17m Bottom collar

Cranage & Hoisting


Tower Crane - Dismantling Method
TOP OF SPIRE T/STEEL EL: +704.9 TOP OF SPIRE T/STEEL EL: +704.9 TOP OF SPIRE T/STEEL EL: +704.9 SPIRE LEVEL 8 BASE T/STEEL EL: +691.3 SPIRE LEVEL 8 BASE T/STEEL EL: +691.3 SPIRE LEVEL 8 BASE T/STEEL EL: +691.3

SPIRE LEVEL 7 BASE T/STEEL EL: +681.7

SPIRE LEVEL 7 BASE T/STEEL EL: +681.7

SPIRE LEVEL 7 BASE T/STEEL EL: +681.7

SPIRE LEVEL 6 BASE T/STEEL EL: +668.9

SPIRE LEVEL 6 BASE T/STEEL EL: +668.9

SPIRE LEVEL 6 BASE T/STEEL EL: +668.9

SPIRE LEVEL 5 - MEZZANINE2 T/STEEL EL: +665.7

SPIRE LEVEL 5 - MEZZANINE2 T/STEEL EL: +665.7

SPIRE LEVEL 5 - MEZZANINE2 T/STEEL EL: +665.7

SPIRE LEVEL 5 - MEZZANINE1 T/STEEL EL: +659.3

SPIRE LEVEL 5 - MEZZANINE1 T/STEEL EL: +659.3

SPIRE LEVEL 5 - MEZZANINE1 T/STEEL EL: +659.3

SPIRE LEVEL 5 T/STEEL EL: +656.1

SPIRE LEVEL 5 T/STEEL EL: +656.1

SPIRE LEVEL 5 T/STEEL EL: +656.1

Multi Step Method - 1st Station : L161

SPIRE LEVEL 4 - MEZZANINE T/STEEL EL: +652.9

SPIRE LEVEL 4 - MEZZANINE T/STEEL EL: +652.9

SPIRE LEVEL 4 - MEZZANINE T/STEEL EL: +652.9

23

1st Station
W

22

SPIRE LEVEL 4 T/STEEL EL: +646.4

SPIRE LEVEL 4 T/STEEL EL: +646.4

SPIRE LEVEL 4 T/STEEL EL: +646.4

21
SPIRE LEVEL 3 - MEZZANINE T/STEEL EL: +640.0 SPIRE LEVEL 3 - MEZZANINE T/STEEL EL: +640.0 SPIRE LEVEL 3 - MEZZANINE T/STEEL EL: +640.0

20

19

SPIRE LEVEL 3 T/STEEL EL: +633.6

SPIRE LEVEL 3 T/STEEL EL: +633.6

SPIRE LEVEL 3 T/STEEL EL: +633.6

18
SPIRE LEVEL 2 - MEZZANINE2 T/STEEL EL: +627.2 SPIRE LEVEL 2 - MEZZANINE2 T/STEEL EL: +627.2 SPIRE LEVEL 2 - MEZZANINE2 T/STEEL EL: +627.2

17

16
SPIRE LEVEL 2 - MEZZANINE1 T/STEEL EL: +620.8 SPIRE LEVEL 2 - MEZZANINE1 T/STEEL EL: +620.8 SPIRE LEVEL 2 - MEZZANINE1 T/STEEL EL: +620.8

15

SPIRE LEVEL 2 T/STEEL EL: +617.6

SPIRE LEVEL 2 T/STEEL EL: +617.6

SPIRE LEVEL 2 T/STEEL EL: +617.6

14

SPIRE LEVEL 1 - MEZZANINE T/STEEL EL: +614.4

SPIRE LEVEL 1 - MEZZANINE T/STEEL EL: +614.4

SPIRE LEVEL 1 - MEZZANINE T/STEEL EL: +614.4

2nd

Station: L99
LEVEL 160 LEVEL 159 LEVEL 158 LEVEL 157

13
LEVEL 162 / SPIRE LEVEL 1 T/SLAB EL: +608.0 LEVEL 162 / SPIRE LEVEL 1 T/SLAB EL: +608.0 LEVEL 162 / SPIRE LEVEL 1 T/SLAB EL: +608.0

12

11
LEVEL 161 T/SLAB EL: +601.9 LEVEL 161 T/SLAB EL: +601.9 LEVEL 161 T/SLAB EL: +601.9

10

10

LEVEL 160
8 8

LEVEL 160

LEVEL 160

3nos. Recovery Crane - Favco 242R, Ogawa OT4520, Favco SDD3/10

LEVEL 159
7 7 6 6

LEVEL 159

LEVEL 159

LEVEL 158

LEVEL 158

LEVEL 158

LEVEL 157

LEVEL 157

LEVEL 157

LEVEL 156

LEVEL 156

LEVEL 156

LEVEL 156

LEVEL 155 LEVEL 154 LEVEL 153 LEVEL 152 LEVEL 151 LEVEL 150 LEVEL 149 LEVEL 148 LEVEL 147

LEVEL 155 LEVEL 154 LEVEL 153 LEVEL 152 LEVEL 151 LEVEL 150 LEVEL 149 LEVEL 148 LEVEL 147

LEVEL 155 LEVEL 154 LEVEL 153 LEVEL 152 LEVEL 151 LEVEL 150 LEVEL 149 LEVEL 148 LEVEL 147

LEVEL 155

LEVEL 154

LEVEL 153

LEVEL 152

LEVEL 151

LEVEL 150

LEVEL 149

LEVEL 148

LEVEL 147

THE BURJ TOWER

LEVEL 145

LEVEL 145

LEVEL 145

LEVEL 145

LEVEL 143 LEVEL 142 LEVEL 141 LEVEL 140

LEVEL 143 LEVEL 142 LEVEL 141 LEVEL 140

LEVEL 143 LEVEL 142 LEVEL 141 LEVEL 140

LEVEL 143

LEVEL 142

LEVEL 141

LEVEL 140

LEVEL 135

LEVEL 135

LEVEL 135

LEVEL 135

LEVEL 130

LEVEL 130

LEVEL 130

LEVEL 130

LEVEL 125

LEVEL 125

LEVEL 125

LEVEL 125

LEVEL 120

LEVEL 120

LEVEL 120

LEVEL 120

LEVEL 115

LEVEL 115

LEVEL 115

LEVEL 115

LEVEL 110

LEVEL 110

LEVEL 110

LEVEL 110

2nd

Station
LEVEL 105 LEVEL 105 LEVEL 105
S6 S5 S4 S3 S2 S1 S6 S5 S4 S3 S2 S1 S6 S5 S4 S3 S2 S1

LEVEL 105

4500

4500

4500

4500

4500

4500

4500

4500

4500

4500

4500

4500

4500

4500

4500

LEVEL 100 LEVEL 99

LEVEL 100 LEVEL 99

LEVEL 100 LEVEL 99

LEVEL 100 LEVEL 99

Cranage & Hoisting


TOP OF SPIRE T/STEEL EL: +704.9 TOP OF SPIRE T/STEEL EL: +704.9 TOP OF SPIRE T/STEEL EL: +704.9 TOP OF SPIRE T/STEEL EL: +704.9 SPIRE LEVEL 8 BASE T/STEEL EL: +691.3 SPIRE LEVEL 8 BASE T/STEEL EL: +691.3 SPIRE LEVEL 8 BASE T/STEEL EL: +691.3 SPIRE LEVEL 8 BASE T/STEEL EL: +691.3

SPIRE LEVEL 7 BASE T/STEEL EL: +681.7

SPIRE LEVEL 7 BASE T/STEEL EL: +681.7

SPIRE LEVEL 7 BASE T/STEEL EL: +681.7

SPIRE LEVEL 7 BASE T/STEEL EL: +681.7

SPIRE LEVEL 6 BASE T/STEEL EL: +668.9

SPIRE LEVEL 6 BASE T/STEEL EL: +668.9

SPIRE LEVEL 6 BASE T/STEEL EL: +668.9

SPIRE LEVEL 6 BASE T/STEEL EL: +668.9

SPIRE LEVEL 5 - MEZZANINE2 T/STEEL EL: +665.7

SPIRE LEVEL 5 - MEZZANINE2 T/STEEL EL: +665.7

SPIRE LEVEL 5 - MEZZANINE2 T/STEEL EL: +665.7

SPIRE LEVEL 5 - MEZZANINE2 T/STEEL EL: +665.7

SPIRE LEVEL 5 - MEZZANINE1 T/STEEL EL: +659.3

SPIRE LEVEL 5 - MEZZANINE1 T/STEEL EL: +659.3

SPIRE LEVEL 5 - MEZZANINE1 T/STEEL EL: +659.3

SPIRE LEVEL 5 - MEZZANINE1 T/STEEL EL: +659.3

SPIRE LEVEL 5 T/STEEL EL: +656.1

SPIRE LEVEL 5 T/STEEL EL: +656.1

SPIRE LEVEL 5 T/STEEL EL: +656.1

SPIRE LEVEL 5 T/STEEL EL: +656.1

SPIRE LEVEL 4 - MEZZANINE T/STEEL EL: +652.9

SPIRE LEVEL 4 - MEZZANINE T/STEEL EL: +652.9

23

TOP OF SPIRE T/STEEL EL: +704.9

SPIRE LEVEL 4 - MEZZANINE T/STEEL EL: +652.9

SPIRE LEVEL 4 - MEZZANINE T/STEEL EL: +652.9

TOP OF SPIRE T/STEEL EL: +704.9

22

SPIRE LEVEL 4 T/STEEL EL: +646.4

SPIRE LEVEL 4 T/STEEL EL: +646.4

SPIRE LEVEL 4 T/STEEL EL: +646.4

SPIRE LEVEL 4 T/STEEL EL: +646.4

21
SPIRE LEVEL 3 - MEZZANINE T/STEEL EL: +640.0 SPIRE LEVEL 3 - MEZZANINE T/STEEL EL: +640.0 SPIRE LEVEL 3 - MEZZANINE T/STEEL EL: +640.0 SPIRE LEVEL 3 - MEZZANINE T/STEEL EL: +640.0

20

19

SPIRE LEVEL 3 T/STEEL EL: +633.6

SPIRE LEVEL 3 T/STEEL EL: +633.6

SPIRE LEVEL 3 T/STEEL EL: +633.6

SPIRE LEVEL 3 T/STEEL EL: +633.6

18
SPIRE LEVEL 2 - MEZZANINE2 T/STEEL EL: +627.2 SPIRE LEVEL 2 - MEZZANINE2 T/STEEL EL: +627.2

17

SPIRE LEVEL 8 BASE T/STEEL EL: +691.3

SPIRE LEVEL 2 - MEZZANINE2 T/STEEL EL: +627.2

SPIRE LEVEL 2 - MEZZANINE2 T/STEEL EL: +627.2

SPIRE LEVEL 8 BASE T/STEEL EL: +691.3

16
SPIRE LEVEL 2 - MEZZANINE1 T/STEEL EL: +620.8 SPIRE LEVEL 2 - MEZZANINE1 T/STEEL EL: +620.8 SPIRE LEVEL 2 - MEZZANINE1 T/STEEL EL: +620.8 SPIRE LEVEL 2 - MEZZANINE1 T/STEEL EL: +620.8

15

SPIRE LEVEL 2 T/STEEL EL: +617.6

SPIRE LEVEL 2 T/STEEL EL: +617.6

SPIRE LEVEL 2 T/STEEL EL: +617.6

SPIRE LEVEL 2 T/STEEL EL: +617.6

14

SPIRE LEVEL 1 - MEZZANINE T/STEEL EL: +614.4

SPIRE LEVEL 1 - MEZZANINE T/STEEL EL: +614.4

SPIRE LEVEL 1 - MEZZANINE T/STEEL EL: +614.4

SPIRE LEVEL 1 - MEZZANINE T/STEEL EL: +614.4

13
LEVEL 162 / SPIRE LEVEL 1 T/SLAB EL: +608.0 LEVEL 162 / SPIRE LEVEL 1 T/SLAB EL: +608.0

SPIRE LEVEL 7 BASE T/STEEL EL: +681.7

LEVEL 162 / SPIRE LEVEL 1 T/SLAB EL: +608.0

LEVEL 162 / SPIRE LEVEL 1 T/SLAB EL: +608.0

SPIRE LEVEL 7 BASE T/STEEL EL: +681.7

12

Step 1 : Main T/C Dismantling 1) Main T/C Descending to L161

11
LEVEL 161 T/SLAB EL: +601.9 LEVEL 161 T/SLAB EL: +601.9 LEVEL 161 T/SLAB EL: +601.9 LEVEL 161 T/SLAB EL: +601.9

10

10

LEVEL 160
8

LEVEL 160
8

LEVEL 160

LEVEL 160

LEVEL 159
7 6

LEVEL 159
7 6

SPIRE LEVEL 6 BASE T/STEEL EL: +668.9

LEVEL 159

LEVEL 159

SPIRE LEVEL 6 BASE T/STEEL EL: +668.9

LEVEL 158

LEVEL 158

SPIRE LEVEL 5 - MEZZANINE2 T/STEEL EL: +665.7


5

LEVEL 158

LEVEL 158

SPIRE LEVEL 5 - MEZZANINE2 T/STEEL EL: +665.7

LEVEL 157

LEVEL 157

LEVEL 157
SPIRE LEVEL 5 - MEZZANINE1 T/STEEL EL: +659.3

LEVEL 157
SPIRE LEVEL 5 - MEZZANINE1 T/STEEL EL: +659.3

LEVEL 156

LEVEL 156

LEVEL 156

LEVEL 156

SPIRE LEVEL 5 T/STEEL EL: +656.1

SPIRE LEVEL 5 T/STEEL EL: +656.1

2) Main T/C Dismantled to L99 by Favco 242R

LEVEL 155 LEVEL 154 LEVEL 153 LEVEL 152 LEVEL 151

LEVEL 155 LEVEL 154


23

LEVEL 155
SPIRE LEVEL 4 - MEZZANINE T/STEEL EL: +652.9

LEVEL 155 LEVEL 154 LEVEL 153 LEVEL 152 LEVEL 151 LEVEL 150 LEVEL 149 LEVEL 148 LEVEL 147
SPIRE LEVEL 3 T/STEEL EL: +633.6 SPIRE LEVEL 3 - MEZZANINE T/STEEL EL: +640.0 SPIRE LEVEL 4 T/STEEL EL: +646.4 SPIRE LEVEL 4 - MEZZANINE T/STEEL EL: +652.9

LEVEL 154 LEVEL 153

LEVEL 153 LEVEL 152 LEVEL 151 LEVEL 150 LEVEL 149 LEVEL 148 LEVEL 147
19 21 22

SPIRE LEVEL 4 T/STEEL EL: +646.4

LEVEL 152 LEVEL 151 LEVEL 150

THE BURJ TOWER

3) Dismantled Components moved to Ground by Ogawa OT4520

LEVEL 150 LEVEL 149 LEVEL 148 LEVEL 147

SPIRE LEVEL 3 - MEZZANINE T/STEEL EL: +640.0

20

LEVEL 149 LEVEL 148

SPIRE LEVEL 3 T/STEEL EL: +633.6

LEVEL 147

18

LEVEL 145

LEVEL 145
17

LEVEL 145
SPIRE LEVEL 2 - MEZZANINE2 T/STEEL EL: +627.2

LEVEL 143 LEVEL 142 LEVEL 141 LEVEL 140

LEVEL 143
16

LEVEL 143
SPIRE LEVEL 2 - MEZZANINE1 T/STEEL EL: +620.8

LEVEL 142 LEVEL 141 LEVEL 140


W 15

LEVEL 142 LEVEL 141 LEVEL 140

SPIRE LEVEL 2 T/STEEL EL: +617.6

Favco 242R L161


LEVEL 160 LEVEL 159

LEVEL 145
SPIRE LEVEL 2 - MEZZANINE2 T/STEEL EL: +627.2

LEVEL 143 LEVEL 142 LEVEL 141 LEVEL 140


W
SPIRE LEVEL 2 - MEZZANINE1 T/STEEL EL: +620.8

SPIRE LEVEL 2 T/STEEL EL: +617.6

14

SPIRE LEVEL 1 - MEZZANINE T/STEEL EL: +614.4

SPIRE LEVEL 1 - MEZZANINE T/STEEL EL: +614.4

13
LEVEL 162 / SPIRE LEVEL 1 T/SLAB EL: +608.0 LEVEL 162 / SPIRE LEVEL 1 T/SLAB EL: +608.0

12

LEVEL 135

LEVEL 135
11
LEVEL 161 T/SLAB EL: +601.9

LEVEL 135

LEVEL 135
LEVEL 161 T/SLAB EL: +601.9

10

10

LEVEL 130

LEVEL 160

LEVEL 130

LEVEL 130

LEVEL 130

LEVEL 159
7

LEVEL 125

LEVEL 125

LEVEL 125
6

LEVEL 125

LEVEL 158
LEVEL 120 LEVEL 120

LEVEL 158
LEVEL 120

LEVEL 157

LEVEL 157

Main T/C
LEVEL 120 LEVEL 115

LEVEL 115

LEVEL 156

LEVEL 115

LEVEL 115

LEVEL 156

LEVEL 110

LEVEL 155 LEVEL 154 LEVEL 153

LEVEL 110

LEVEL 110

LEVEL 155 LEVEL 154 LEVEL 153

LEVEL 110

LEVEL 105

LEVEL 152
S5 S4 S3 S2 S1

LEVEL 105

LEVEL 105

LEVEL 152
S5 S4 S3 S2 S1

LEVEL 105

S6

4500

4500

4500

4500

4500

LEVEL 151 LEVEL 150 LEVEL 149 LEVEL 148

S6

S5

S4

S3

S2

S1

S6

4500

4500

4500

4500

4500

4500

4500

4500

4500

4500

LEVEL 151 LEVEL 150 LEVEL 149 LEVEL 148

S6

S5

S4

S3

S2

S1

4500

4500

4500

4500

4500

LEVEL 100 LEVEL 99

LEVEL 100 LEVEL 99

LEVEL 100 LEVEL 99

LEVEL 100 LEVEL 99

Cranage & Hoisting


TOP OF SPIRE T/STEEL EL: +704.9 TOP OF SPIRE T/STEEL EL: +704.9 TOP OF SPIRE T/STEEL EL: +704.9 TOP OF SPIRE T/STEEL EL: +704.9 SPIRE LEVEL 8 BASE T/STEEL EL: +691.3 SPIRE LEVEL 8 BASE T/STEEL EL: +691.3 SPIRE LEVEL 8 BASE T/STEEL EL: +691.3 SPIRE LEVEL 8 BASE T/STEEL EL: +691.3

SPIRE LEVEL 7 BASE T/STEEL EL: +681.7

SPIRE LEVEL 7 BASE T/STEEL EL: +681.7

SPIRE LEVEL 7 BASE T/STEEL EL: +681.7

SPIRE LEVEL 7 BASE T/STEEL EL: +681.7

SPIRE LEVEL 6 BASE T/STEEL EL: +668.9

SPIRE LEVEL 6 BASE T/STEEL EL: +668.9

SPIRE LEVEL 6 BASE T/STEEL EL: +668.9

SPIRE LEVEL 6 BASE T/STEEL EL: +668.9

SPIRE LEVEL 5 - MEZZANINE2 T/STEEL EL: +665.7

SPIRE LEVEL 5 - MEZZANINE2 T/STEEL EL: +665.7

SPIRE LEVEL 5 - MEZZANINE2 T/STEEL EL: +665.7

SPIRE LEVEL 5 - MEZZANINE2 T/STEEL EL: +665.7

SPIRE LEVEL 5 - MEZZANINE1 T/STEEL EL: +659.3

SPIRE LEVEL 5 - MEZZANINE1 T/STEEL EL: +659.3

SPIRE LEVEL 5 - MEZZANINE1 T/STEEL EL: +659.3

SPIRE LEVEL 5 - MEZZANINE1 T/STEEL EL: +659.3

SPIRE LEVEL 5 T/STEEL EL: +656.1

SPIRE LEVEL 4 - MEZZANINE T/STEEL EL: +652.9

23

TOP OF SPIRE T/STEEL EL: +704.9

22

SPIRE LEVEL 4 T/STEEL EL: +646.4

1st Station
SPIRE LEVEL 4 - MEZZANINE T/STEEL EL: +652.9 SPIRE LEVEL 4 T/STEEL EL: +646.4 SPIRE LEVEL 3 - MEZZANINE T/STEEL EL: +640.0 SPIRE LEVEL 3 T/STEEL EL: +633.6 SPIRE LEVEL 2 - MEZZANINE2 T/STEEL EL: +627.2 SPIRE LEVEL 2 - MEZZANINE1 T/STEEL EL: +620.8

SPIRE LEVEL 5 T/STEEL EL: +656.1

SPIRE LEVEL 5 T/STEEL EL: +656.1

SPIRE LEVEL 5 T/STEEL EL: +656.1

SPIRE LEVEL 4 - MEZZANINE T/STEEL EL: +652.9

TOP OF SPIRE T/STEEL EL: +704.9

SPIRE LEVEL 4 - MEZZANINE T/STEEL EL: +652.9

TOP OF SPIRE T/STEEL EL: +704.9

SPIRE LEVEL 4 T/STEEL EL: +646.4

SPIRE LEVEL 4 T/STEEL EL: +646.4

21
SPIRE LEVEL 3 - MEZZANINE T/STEEL EL: +640.0 SPIRE LEVEL 3 - MEZZANINE T/STEEL EL: +640.0 SPIRE LEVEL 3 - MEZZANINE T/STEEL EL: +640.0

20

19

SPIRE LEVEL 3 T/STEEL EL: +633.6

SPIRE LEVEL 3 T/STEEL EL: +633.6

SPIRE LEVEL 3 T/STEEL EL: +633.6

18
SPIRE LEVEL 2 - MEZZANINE2 T/STEEL EL: +627.2

17

SPIRE LEVEL 8 BASE T/STEEL EL: +691.3

SPIRE LEVEL 2 - MEZZANINE2 T/STEEL EL: +627.2

SPIRE LEVEL 8 BASE T/STEEL EL: +691.3

SPIRE LEVEL 2 - MEZZANINE2 T/STEEL EL: +627.2

SPIRE LEVEL 8 BASE T/STEEL EL: +691.3

16
SPIRE LEVEL 2 - MEZZANINE1 T/STEEL EL: +620.8 SPIRE LEVEL 2 - MEZZANINE1 T/STEEL EL: +620.8 SPIRE LEVEL 2 - MEZZANINE1 T/STEEL EL: +620.8

15

SPIRE LEVEL 2 T/STEEL EL: +617.6

SPIRE LEVEL 2 T/STEEL EL: +617.6

SPIRE LEVEL 2 T/STEEL EL: +617.6

SPIRE LEVEL 2 T/STEEL EL: +617.6

14

SPIRE LEVEL 1 - MEZZANINE T/STEEL EL: +614.4

SPIRE LEVEL 1 - MEZZANINE T/STEEL EL: +614.4

SPIRE LEVEL 1 - MEZZANINE T/STEEL EL: +614.4

SPIRE LEVEL 1 - MEZZANINE T/STEEL EL: +614.4

13
LEVEL 162 / SPIRE LEVEL 1 T/SLAB EL: +608.0

SPIRE LEVEL 7 BASE T/STEEL EL: +681.7

LEVEL 162 / SPIRE LEVEL 1 T/SLAB EL: +608.0

LEVEL 162 / SPIRE LEVEL 1 T/SLAB EL: +608.0

SPIRE LEVEL 7 BASE T/STEEL EL: +681.7

LEVEL 162 / SPIRE LEVEL 1 T/SLAB EL: +608.0

SPIRE LEVEL 7 BASE T/STEEL EL: +681.7

12

Step 2 : Favco 242R Dismantling

11
LEVEL 161 T/SLAB EL: +601.9 LEVEL 161 T/SLAB EL: +601.9 LEVEL 161 T/SLAB EL: +601.9 LEVEL 161 T/SLAB EL: +601.9

10

10

LEVEL 160
8

LEVEL 160
8

LEVEL 160

LEVEL 160

LEVEL 159
7 6

LEVEL 159 LEVEL 6 BASE SPIRE


T/STEEL EL: +668.9 SPIRE LEVEL 158 LEVEL 5 - MEZZANINE2 T/STEEL EL: +665.7

LEVEL 159
7 6

SPIRE LEVEL 6 BASE T/STEEL EL: +668.9

LEVEL 159

SPIRE LEVEL 6 BASE T/STEEL EL: +668.9

1) Favco SDD 3/10 Installed on L161


LEVEL 157 LEVEL 156 LEVEL 155 LEVEL 154 LEVEL 153 LEVEL 152 LEVEL 151 LEVEL 150 LEVEL 149 LEVEL 148 LEVEL 147

LEVEL 158

LEVEL 158

SPIRE LEVEL 5 - MEZZANINE2 T/STEEL EL: +665.7

LEVEL 158

SPIRE LEVEL 5 - MEZZANINE2 T/STEEL EL: +665.7

LEVEL 157
SPIRE LEVEL 5 - MEZZANINE1 T/STEEL EL: +659.3

LEVEL 157

LEVEL 157
SPIRE LEVEL 5 - MEZZANINE1 T/STEEL EL: +659.3 SPIRE LEVEL 5 - MEZZANINE1 T/STEEL EL: +659.3

LEVEL 156

LEVEL 156

LEVEL 156

SPIRE LEVEL 5 T/STEEL EL: +656.1

SPIRE LEVEL 5 T/STEEL EL: +656.1

SPIRE LEVEL 5 T/STEEL EL: +656.1

2) Favco 242R Dismantled to L99 by Favco SDD3/10


LEVEL 154 LEVEL 153 LEVEL 152 LEVEL 151
21
SPIRE LEVEL 4 - MEZZANINE T/STEEL EL: +652.9

LEVEL 155

LEVEL 155 LEVEL 154 LEVEL 153 LEVEL 152 LEVEL 151 LEVEL 150 LEVEL 149 LEVEL 148 LEVEL 147

LEVEL 155
SPIRE LEVEL 4 - MEZZANINE T/STEEL EL: +652.9

LEVEL 154 LEVEL 153

SPIRE LEVEL 4 - MEZZANINE T/STEEL EL: +652.9

23

22

SPIRE LEVEL 4 T/STEEL EL: +646.4

SPIRE LEVEL 4 T/STEEL EL: +646.4

LEVEL 152 LEVEL 151 LEVEL 150

SPIRE LEVEL 4 T/STEEL EL: +646.4

3) Dismantled Components moved to Ground


20 19

LEVEL 150 LEVEL 149 LEVEL 148 LEVEL 147


SPIRE LEVEL 3 T/STEEL EL: +633.6 SPIRE LEVEL 3 - MEZZANINE T/STEEL EL: +640.0

SPIRE LEVEL 3 - MEZZANINE T/STEEL EL: +640.0

LEVEL 149 LEVEL 148

SPIRE LEVEL 3 - MEZZANINE T/STEEL EL: +640.0

SPIRE LEVEL 3 T/STEEL EL: +633.6

LEVEL 147

SPIRE LEVEL 3 T/STEEL EL: +633.6

THE BURJ TOWER

by Ogawa OT4520.

18

LEVEL 145
17

LEVEL 145
SPIRE LEVEL 2 - MEZZANINE2 T/STEEL EL: +627.2

LEVEL 145

LEVEL 145
SPIRE LEVEL 2 - MEZZANINE2 T/STEEL EL: +627.2 SPIRE LEVEL 2 - MEZZANINE2 T/STEEL EL: +627.2

LEVEL 143
16

LEVEL 143 LEVEL 142


W 15
SPIRE LEVEL 2 - MEZZANINE1 T/STEEL EL: +620.8

LEVEL 143 LEVEL 142 LEVEL 141 LEVEL 140


W

LEVEL 143
SPIRE LEVEL 2 - MEZZANINE1 T/STEEL EL: +620.8

LEVEL 142 LEVEL 141 LEVEL 140

LEVEL 142 LEVEL 141 LEVEL 140

SPIRE LEVEL 2 - MEZZANINE1 T/STEEL EL: +620.8

LEVEL 141 EL: +617.6 T/STEEL


SPIRE 1 - MEZZANINE LEVEL 140 LEVEL +614.4 T/STEEL EL:

SPIRE LEVEL 2

SPIRE LEVEL 2 T/STEEL EL: +617.6

14

SPIRE LEVEL 1 - MEZZANINE T/STEEL EL: +614.4

Favco 242R L161

SPIRE LEVEL 2 T/STEEL EL: +617.6

SPIRE LEVEL 1 - MEZZANINE T/STEEL EL: +614.4

13
LEVEL 162 / SPIRE LEVEL 1 T/SLAB EL: +608.0 LEVEL 162 / SPIRE LEVEL 1 T/SLAB EL: +608.0 LEVEL 162 / SPIRE LEVEL 1 T/SLAB EL: +608.0

12

LEVEL 135
11

LEVEL 135
LEVEL 161 T/SLAB EL: +601.9

LEVEL 135

LEVEL 135
LEVEL 161 T/SLAB EL: +601.9

LEVEL 161 T/SLAB EL: +601.9

10

10

LEVEL LEVEL 160 130

LEVEL 130

LEVEL 160

LEVEL 130

LEVEL 130

LEVEL 160

LEVEL 159
7

LEVEL 159
7

LEVEL 159
LEVEL 125 LEVEL 125
6

LEVEL 125

LEVEL 125
6

LEVEL 158
LEVEL 120

LEVEL 158
LEVEL 120 LEVEL 120

LEVEL 158
LEVEL 120

Favco SDD3/10

LEVEL 157

LEVEL 157

LEVEL 157

LEVEL 156 115 LEVEL LEVEL 155 LEVEL 154 LEVEL 153 LEVEL 152 LEVEL 151 LEVEL 150 99 LEVEL LEVEL 149 LEVEL 148
LEVEL 105

LEVEL 115

LEVEL 156

LEVEL 115

LEVEL 115

LEVEL 156

LEVEL 110

LEVEL 110

LEVEL 155 LEVEL 154

LEVEL 110

LEVEL 110

LEVEL 155 LEVEL 154 LEVEL 153

2nd Station
LEVEL 153 LEVEL 152
S5 S4 S3 S2 S1

LEVEL 105

LEVEL 105

LEVEL 105

LEVEL 152
S5 S4 S3 S2 S1

S6

S5

S4

S3

S2

S1

S6

4500

4500

4500

4500

4500

4500

4500

4500

4500

4500

LEVEL 151 LEVEL 150 LEVEL 149 LEVEL 148

S6

S5

S4

S3

S2

S1

S6

4500

4500

4500

4500

4500

4500

4500

4500

4500

4500

LEVEL 151 LEVEL 150 LEVEL 149 LEVEL 148

LEVEL 100

LEVEL 100 LEVEL 99

LEVEL 100 LEVEL 99

LEVEL 100 LEVEL 99

LEVEL 149 LEVEL 148 LEVEL 147

LEVEL 149 LEVEL 148 LEVEL 147

LEVEL 149 LEVEL 148 LEVEL 147

LEVEL 149 LEVEL 148

LEVEL 145

LEVEL 145

LEVEL 145

Cranage & Hoisting


LEVEL 147 LEVEL 145 LEVEL 143 LEVEL 142 LEVEL 141
SPIRE LEVEL 8 BASE T/STEEL EL: +691.3 TOP OF SPIRE T/STEEL EL: +704.9

LEVEL 143 LEVEL 142 LEVEL 141 LEVEL 140

LEVEL 143 LEVEL 142


TOP OF SPIRE T/STEEL EL: +704.9

LEVEL 143 LEVEL 142 LEVEL 141


SPIRE LEVEL 8 BASE T/STEEL EL: +691.3

TOP OF SPIRE T/STEEL EL: +704.9

TOP OF SPIRE T/STEEL EL: +704.9

LEVEL 141 LEVEL 140


SPIRE LEVEL 7 BASE T/STEEL EL: +681.7 SPIRE LEVEL 8 BASE T/STEEL EL: +691.3

LEVEL 140

SPIRE LEVEL 8 BASE T/STEEL EL: +691.3

LEVEL 140

SPIRE LEVEL 7 BASE T/STEEL EL: +681.7

SPIRE LEVEL 7 BASE T/STEEL EL: +681.7

SPIRE LEVEL 7 BASE T/STEEL EL: +681.7

SPIRE LEVEL 6 BASE T/STEEL EL: +668.9

SPIRE LEVEL 6 BASE T/STEEL EL: +668.9

SPIRE LEVEL 6 BASE T/STEEL EL: +668.9

SPIRE LEVEL 6 BASE T/STEEL EL: +668.9

SPIRE LEVEL 5 - MEZZANINE2 T/STEEL EL: +665.7

SPIRE LEVEL 5 - MEZZANINE2 T/STEEL EL: +665.7

SPIRE LEVEL 5 - MEZZANINE2 T/STEEL EL: +665.7

SPIRE LEVEL 5 - MEZZANINE2 T/STEEL EL: +665.7

SPIRE LEVEL 5 - MEZZANINE1 T/STEEL EL: +659.3

SPIRE LEVEL 5 - MEZZANINE1 T/STEEL EL: +659.3

SPIRE LEVEL 5 - MEZZANINE1 T/STEEL EL: +659.3

SPIRE LEVEL 5 - MEZZANINE1 T/STEEL EL: +659.3

LEVEL 135
23 22

LEVEL 135
SPIRE LEVEL 4 - MEZZANINE T/STEEL EL: +652.9 SPIRE LEVEL 4 T/STEEL EL: +646.4

SPIRE LEVEL 5 T/STEEL EL: +656.1

SPIRE LEVEL 5 T/STEEL EL: +656.1

SPIRE LEVEL 4 - MEZZANINE T/STEEL EL: +652.9

LEVEL 135

SPIRE LEVEL 5 T/STEEL EL: +656.1

SPIRE LEVEL 5 T/STEEL EL: +656.1

SPIRE LEVEL 4 - MEZZANINE T/STEEL EL: +652.9

SPIRE LEVEL 4 - MEZZANINE T/STEEL EL: +652.9

LEVEL 135

SPIRE LEVEL 4 T/STEEL EL: +646.4

SPIRE LEVEL 4 T/STEEL EL: +646.4

SPIRE LEVEL 4 T/STEEL EL: +646.4

21
SPIRE LEVEL 3 - MEZZANINE T/STEEL EL: +640.0 SPIRE LEVEL 3 - MEZZANINE T/STEEL EL: +640.0 SPIRE LEVEL 3 - MEZZANINE T/STEEL EL: +640.0 SPIRE LEVEL 3 - MEZZANINE T/STEEL EL: +640.0

20

19

SPIRE LEVEL 3 T/STEEL EL: +633.6

SPIRE LEVEL 3 T/STEEL EL: +633.6

SPIRE LEVEL 3 T/STEEL EL: +633.6

SPIRE LEVEL 3 T/STEEL EL: +633.6

18
SPIRE LEVEL 2 - MEZZANINE2 T/STEEL EL: +627.2 SPIRE LEVEL 2 - MEZZANINE2 T/STEEL EL: +627.2 SPIRE LEVEL 2 - MEZZANINE2 T/STEEL EL: +627.2 SPIRE LEVEL 2 - MEZZANINE2 T/STEEL EL: +627.2

17

LEVEL 130
W

16

LEVEL 130
SPIRE LEVEL 2 - MEZZANINE1 T/STEEL EL: +620.8 SPIRE LEVEL 2 T/STEEL EL: +617.6

SPIRE LEVEL 2 - MEZZANINE1 T/STEEL EL: +620.8

LEVEL 130
W

SPIRE LEVEL 2 - MEZZANINE1 T/STEEL EL: +620.8

SPIRE LEVEL 2 - MEZZANINE1 T/STEEL EL: +620.8

LEVEL 130

15

SPIRE LEVEL 2 T/STEEL EL: +617.6

SPIRE LEVEL 2 T/STEEL EL: +617.6

SPIRE LEVEL 2 T/STEEL EL: +617.6

14

SPIRE LEVEL 1 - MEZZANINE T/STEEL EL: +614.4

SPIRE LEVEL 1 - MEZZANINE T/STEEL EL: +614.4

SPIRE LEVEL 1 - MEZZANINE T/STEEL EL: +614.4

SPIRE LEVEL 1 - MEZZANINE T/STEEL EL: +614.4

13
LEVEL 162 / SPIRE LEVEL 1 T/SLAB EL: +608.0 LEVEL 162 / SPIRE LEVEL 1 T/SLAB EL: +608.0 LEVEL 162 / SPIRE LEVEL 1 T/SLAB EL: +608.0 LEVEL 162 / SPIRE LEVEL 1 T/SLAB EL: +608.0

12

Step 3 : Ogawa OT4520 Dismantling


LEVEL 161 T/SLAB EL: +601.9

11

LEVEL 161 T/SLAB EL: +601.9

LEVEL 161 T/SLAB EL: +601.9

LEVEL 161 T/SLAB EL: +601.9

10

10

LEVEL 160

LEVEL 160

LEVEL 160
8

LEVEL 160

LEVEL 125

LEVEL 159
7 6

LEVEL 125

LEVEL 159
7 6

LEVEL 159

LEVEL 125

LEVEL 159

LEVEL 125

1) Favco SDD 3/10 Re-installed on L99


5

LEVEL 158

LEVEL 158

LEVEL 158

LEVEL 158

LEVEL 157

LEVEL 157

LEVEL 157

LEVEL 157

LEVEL 156

LEVEL 156

LEVEL 156

LEVEL 156

2) Ogawa OT4520 Dismantled to Ground by Favco SDD3/10


LEVEL 120
LEVEL 154 LEVEL 153 LEVEL 152 LEVEL 151 LEVEL 150 LEVEL 149 LEVEL 148

LEVEL 155

LEVEL 155 LEVEL 154 LEVEL 153 LEVEL 152 LEVEL 151 LEVEL 150 LEVEL 149 LEVEL 148

LEVEL 155 LEVEL 154 LEVEL 153 LEVEL 152 LEVEL 151 LEVEL 150 LEVEL 149 LEVEL 148 LEVEL 147

LEVEL 155

LEVEL 120

LEVEL 120

LEVEL 154 LEVEL 153 LEVEL 152 LEVEL 151 LEVEL 150 LEVEL 149 LEVEL 148

LEVEL 120

LEVEL 115

LEVEL 147

LEVEL 115

LEVEL 147

LEVEL 115

LEVEL 147

LEVEL 115

THE BURJ TOWER

LEVEL 145

LEVEL 145

LEVEL 145

LEVEL 145

LEVEL 143

LEVEL 143

LEVEL 143 LEVEL 142 LEVEL 141 LEVEL 140

LEVEL 143

LEVEL 110

LEVEL 142 LEVEL 141 LEVEL 140

LEVEL 110

LEVEL 142 LEVEL 141 LEVEL 140

LEVEL 110

LEVEL 142 LEVEL 141 LEVEL 140

LEVEL 110

Step 4 : Favco SDD3/10 Dismantling


LEVEL 135 LEVEL 135

LEVEL 135

LEVEL 135

Ogawa OT4520
LEVEL 105

LEVEL 105

LEVEL 105

LEVEL 105
LEVEL 130 LEVEL 130

1) Favco SDD 3/10 Dismantled Manually


S6 S5 S4 S3 S2 S1 S6 S5 S4 S3 S2 S1

LEVEL 130

LEVEL 130

S6

S5

S4

S3

S2

S1

S6

S5

S4

S3

S2

S1

4500

4500

4500

4500

4500

4500

4500

4500

4500

4500

4500

4500

4500

4500

4500

4500

4500

4500

4500

4500

LEVEL 125

LEVEL 125

LEVEL 125

LEVEL 125

LEVEL 100 LEVEL 99


LEVEL 120

LEVEL 100 LEVEL 99


LEVEL 120 LEVEL 120

LEVEL 100 LEVEL 99


LEVEL 120

LEVEL 100

L99

LEVEL 99

LEVEL 115

LEVEL 115

LEVEL 115

LEVEL 115

LEVEL 110

LEVEL 110

LEVEL 110

LEVEL 110

LEVEL 105

LEVEL 105

LEVEL 105

2nd Station
S5 S4 S3 S2 S1

Favco SDD3/10
S5 S4 S3 S2 S1

LEVEL 105

S6

S5

S4

S3

S2

S1

S6

S5

S4

S3

S2

S1

S6

S6

4500

4500

4500

4500

4500

4500

4500

4500

4500

4500

4500

4500

4500

4500

4500

4500

4500

4500

4500

4500

LEVEL 100 LEVEL 99

LEVEL 100 LEVEL 99

LEVEL 100 LEVEL 99

LEVEL 100 LEVEL 99

BW

B11

C11

BV

BU

Concrete Placement
B10 C10

85 00

85

00

850 0

85 00

85

00

B9

C9

850 0

85

00

85

00

B8

C8

85

00
B7 C7

85 85

00

850 0

00
B6 C6

85 85

00

BT

Concrete Placement Method


BS BR BQ

00

85

00

850 0

Level Ground ~ L145 L146 ~ L160M L160M ~ Spire1

Height 531 m
BN

850 0

850 0

Pouring Method Direct Pumping Re-pumping Hopper by T/C

Remarks Target Height (RC Structure) Secondary Pump on L124 (East wing 442m) From Ground Level
Pumping Area (Ground Level)

BP

624 m
BL

BM

681.7 m
BK BJ

. Concrete Pump
BH

900 0

900 0

900 0

850 0

850 0

850 0

850 0

Level

Pressure
BG

Output

Engine 470 kw 200 kw

Remarks 2 nos. of Main 1 no. of Stand by Secondary Pumping


CPB#4

Pipe Lines

THE BURJ TOWER

BE

Pump#4

220 / 260 bar


BD BC

850 0

850 0

Pump#1~#3

185 / 320 bar

BF

. Concrete Placing Boom


BB BA

850 0

850 0

850 0

850 0

71 / 36 m3/hr 110 m3/hr

850 0

- 32m boom for Center Core - 3nos. of 28m boom for Wing Core . Pipe Lines

CPB#1

CPB#3

CPB#2

- D150mm, THK 11mm - 5 Lines (1 for back up)

Concrete Placement
Pipe Line Schedule
Line#1. (L160) for Center Core Pinnacle Top of Finial : Spire

Line#5. (L160) for Back up

L160Mezzanine : Steel Structure L154 : RC Structure

Pump#4. (Secondary Pump on L124)

Line#3. (L124) for East Wing Line#4. (L112) for West Wing

Line#2. (L139) for South Wing

THE BURJ TOWER

Pumping Area Pump#1~#3

Concrete Placement
WN2 WN1 W WS1 WS2

Re-pumping

WS2

WS1

WN1

WN2

4500

4500

4500

4500

W4

4500

Spire1 (682m)

LEVEL 160 LEVEL 159 LEVEL 158

Line#5 : Back up (~L154) LEVEL 160


LEVEL 159

4500

W3

W2

Line#1 (~L154)
S1 LEVEL 158 S2 S3

4500

W1 E1

Concrete Hopper : L160 ~ Spire1 (58m) LEVEL 157


WN2 WN1 W WS1 WS2

0 450

LEVEL 157 LEVEL 156 LEVEL 155 CPB#2 LEVEL 154 LEVEL 153

0 450

450 0

E2

450 0

E3

LEVEL 156 LEVEL 155

THE BURJ TOWER

Direct pumping Target Height : Ground ~ L145 (531m)

: L142 ~ L160M (182m)


150 LEVEL 159 LEVEL 149 LEVEL 158 LEVEL 148

SE2

LEVEL 150 159 LEVEL 149 LEVEL 158 LEVEL 148

Line#2 (~L139)

L124 (442m)

LEVEL 157 LEVEL 147 LEVEL 156 LEVEL 155 LEVEL 154 LEVEL 153

LEVEL 157 LEVEL 147 LEVEL 156


LEVEL 145 LEVEL 155

: Vertical Line Position

Secondary Pump

LEVEL 154
LEVEL 143 LEVEL 153

450 0

LEVEL 160 Secondary Pumping LEVEL 151

SE1

LEVEL 160 LEVEL 151

L124 Secondary Pumping Location

ES2

450 0

LEVEL 152

LEVEL 152
0 450

ES1

450 0

LEVEL 153 SW1

450 0
EN1

L160 Mezzanine (624m) SW2 LEVEL 154

CPB#1

0 450 0 450 0 450

Survey & Monitoring


Low Level Tower Control Classical Control Method

XYZ

XYZ

THE BURJ TOWER

XYZ

XYZ

Survey & Monitoring High Level Tower Control GPS RTK


XYZ XYZ XYZ

XYZ

ANTENNA

ANTENNA

ANTENNA

THE BURJ TOWER

REFERENCE STATION

Survey & Monitoring


Monitoring Program
. Main Control Room
Level 146 Level 138

- Location ; B2 Level
- Plan for Integrating Raft and Survey Monitoring . Strain Gauge & Extensometer - Total number ; 211EA (except Raft) - Location : Outrigger Floor Level
Level 76 Level 72

Level 112 Level 108

Level 92

THE BURJ TOWER

: Middle Floor Level between Outrigger Floors : Level 5, 16, 19, 26, 39, 43, 58, 72, 76, 92, 108, 112, 138, 146 (14 Floors)

Level 58

. Wind Speed/Direction, Temperature, Humidity - Location ; Level 5, 43, 76, 112, 146 (Tower Outside)

Level 43 Level 39 Level 26 Level 19 Level 16 Level 5

. Communication Control Module (CCM) - LAN/Network Interface

Spire Erection

THE BURJ TOWER

Spire Erection
Spire Erection Method

Support Beam & Lifting Equipment Installation

Lifting Block Installation & Assembling

Spire Assembly Lifting & Connection Block Erection

THE BURJ TOWER

Temporary Spire Bottom Block Engaging

Completion of Lifting

Dismantling of Temporary Spire Bottom Block

Spire Erection

THE BURJ TOWER

THE BURJ TOWER

THE BURJ TOWER

Thank you !

THE BURJ TOWER

THE BURJ TOWER

Photographs

THE BURJ TOWER

22/01/2005

THE BURJ TOWER

Photographs

THE BURJ TOWER

Photographs

THE BURJ TOWER

Photographs

THE BURJ TOWER

Photographs

THE BURJ TOWER

Thank you !