You are on page 1of 5

Project: Kuantan Resin Plant, Malaysia

Client: Solutia Inc.


Subject: SUMMARY OF PILECAP DESIGN LOADS

Project No.
1652
Revision
A
Prepared by Whassan Date
Checked by
PC
Date
Approved by Jlim
Date

30/12/2011
28/12/2011
30/12/2011

A. Summary of Design Loads For PILECAPS


Following is the summary of the maximum load used for the design of Pilecaps. The Maximum
Allowable Pile Capacity for each size among all the bore holes is used for the Design.
All units in kN m
200 (mm)
N (kN)

1 pile Group
2 pile Group
3 pile Group
4 pile Group
5 pile Group
6 pile Group
7 pile Group
8 pile Group
9 pile Group

400
800
1200
1600
2000
2400
2800
3200
3600

300 (mm)

M (kN-m/m)

46
250
320
214
320
600
235
540
500

N (kN)

680
1360
2040
2720
3400
4080
4760
5440
6120

350 (mm)

M (kN-m/m)

75
574
623
455
571
1071
510
908
962

N (kN)

1110
2220
3330
4440
5550
6660
7770
8880
9990

M (kN-m/m)

124
1077
1047
814
990
1850
996
1537
1655

Project: Kuantan Resin Plant, Malaysia


Client: Solutia Inc.
Subject: SUMMARY OF PILECAP DESIGN LOADS

Project No.
1652
Revision
A
Prepared by Whassan Date
Checked by
PC
Date
Approved by Jlim
Date

B. Sumamry of Allowable Load For Each Pile Group


Following are the maximum Allowable Loads on each pile Group
1 . These loads together with self wt. of pilecap will utilize 100% of Allowable Pile Capacity
2 . All units in kN m

Pile size
1 pile Group
2 pile Group
3 pile Group
4 pile Group
5 pile Group
6 pile Group
7 pile Group
8 pile Group
9 pile Group
Pile size
1 pile Group
2 pile Group
3 pile Group
4 pile Group
5 pile Group
6 pile Group
7 pile Group
8 pile Group
9 pile Group
Pile size
1 pile Group
2 pile Group
3 pile Group
4 pile Group
5 pile Group
6 pile Group
7 pile Group
8 pile Group
9 pile Group
Pile size
1 pile Group
2 pile Group
3 pile Group
4 pile Group
5 pile Group
6 pile Group
7 pile Group
8 pile Group
9 pile Group

200 (mm)
N (kN)
M (kN-m)
260.00
40.00
420.00
40.00
375.00
100.00
580.00
100.00
1130.00
100.00
1220.00
100.00
1540.00
100.00
1800.00
100.00
2030.00
100.00

BH1
300 (mm)
N (kN)
M (kN-m)
520.00
50.00
970.00
50.00
1300.00
100.00
1700.00
100.00
2350.00
100.00
2750.00
100.00
3250.00
100.00
3850.00
100.00
4400.00
100.00

350 (mm)
N (kN)
690.00
1290.00
1775.00
2400.00
3200.00
3800.00
4375.00
5075.00
5700.00

M (kN-m)
50.00
50.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00

200 (mm)
N (kN)
M (kN-m)
250.00
40.00
390.00
40.00
345.00
100.00
525.00
100.00
1065.00
100.00
1150.00
100.00
1450.00
100.00
1690.00
100.00
1920.00
100.00

BH3
300 (mm)
N (kN)
M (kN-m)
500.00
50.00
925.00
50.00
1230.00
100.00
1650.00
100.00
2300.00
100.00
2675.00
100.00
3110.00
100.00
3675.00
100.00
4190.00
100.00

350 (mm)
N (kN)
625.00
1150.00
1590.00
2150.00
2850.00
3450.00
3900.00
4575.00
5100.00

M (kN-m)
50.00
50.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00

200 (mm)
N (kN)
M (kN-m)
335.00
40.00
550.00
40.00
575.00
100.00
840.00
100.00
1450.00
100.00
1600.00
100.00
2000.00
100.00
2325.00
100.00
2625.00
100.00

BH7
300 (mm)
N (kN)
M (kN-m)
615.00
50.00
1150.00
50.00
1575.00
100.00
2100.00
100.00
2875.00
100.00
3350.00
100.00
3900.00
100.00
4560.00
100.00
5200.00
100.00

350 (mm)
N (kN)
790.00
1500.00
2075.00
2800.00
3700.00
4400.00
5090.00
5900.00
6625.00

M (kN-m)
50.00
50.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00

200 (mm)
N (kN)
M (kN-m)
365.00
40.00
620.00
40.00
675.00
100.00
960.00
100.00
1600.00
100.00
1800.00
100.00
2200.00
100.00
2575.00
100.00
2890.00
100.00

BH8
300 (mm)
N (kN)
M (kN-m)
665.00
50.00
1250.00
50.00
1725.00
100.00
2300.00
100.00
3100.00
100.00
3650.00
100.00
4250.00
100.00
4950.00
100.00
5600.00
100.00

350 (mm)
N (kN)
850.00
1600.00
2250.00
3050.00
4000.00
4800.00
5500.00
6350.00
7150.00

M (kN-m)
50.00
50.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00

30/12/2011
28/12/2011
30/12/2011

Project: Kuantan Resin Plant, Malaysia


Client: Solutia Inc.
Subject: SUMMARY OF PILECAP DESIGN LOADS

Pile size
1 pile Group
2 pile Group
3 pile Group
4 pile Group
5 pile Group
6 pile Group
7 pile Group
8 pile Group
9 pile Group
Pile size
1 pile Group
2 pile Group
3 pile Group
4 pile Group
5 pile Group
6 pile Group
7 pile Group
8 pile Group
9 pile Group
Pile size
1 pile Group
2 pile Group
3 pile Group
4 pile Group
5 pile Group
6 pile Group
7 pile Group
8 pile Group
9 pile Group
Pile size
1 pile Group
2 pile Group
3 pile Group
4 pile Group
5 pile Group
6 pile Group
7 pile Group
8 pile Group
9 pile Group
Pile size
N (kN)
1 pile Group
2 pile Group
3 pile Group
4 pile Group
5 pile Group
6 pile Group
7 pile Group
8 pile Group
9 pile Group

Project No.
1652
Revision
A
Prepared by Whassan Date
Checked by
PC
Date
Approved by Jlim
Date

30/12/2011
28/12/2011
30/12/2011

200 (mm)
N (kN)
M (kN-m)
290.00
40.00
465.00
40.00
440.00
100.00
665.00
100.00
1225.00
100.00
1360.00
100.00
1690.00
100.00
1975.00
100.00
2225.00
100.00

BH9
300 (mm)
N (kN)
M (kN-m)
550.00
50.00
1025.00
50.00
1375.00
100.00
1850.00
100.00
2550.00
100.00
2950.00
100.00
3450.00
100.00
4050.00
100.00
4600.00
100.00

350 (mm)
N (kN)
730.00
1375.00
1900.00
2600.00
3400.00
4100.00
4700.00
5450.00
6100.00

M (kN-m)
50.00
50.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00

200 (mm)
N (kN)
M (kN-m)
190.00
40.00
265.00
40.00
155.00
100.00
270.00
100.00
750.00
100.00
775.00
100.00
1025.00
100.00
1200.00
100.00
1375.00
100.00

BH10
300 (mm)
N (kN)
M (kN-m)
410.00
50.00
735.00
50.00
950.00
100.00
1275.00
100.00
1835.00
100.00
2100.00
100.00
2450.00
100.00
2925.00
100.00
3350.00
100.00

350 (mm)
N (kN)
650.00
1200.00
1650.00
2250.00
2975.00
3550.00
4090.00
4750.00
5360.00

M (kN-m)
50.00
50.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00

200 (mm)
N (kN)
M (kN-m)
245.00
40.00
375.00
40.00
315.00
100.00
490.00
100.00
1010.00
100.00
1090.00
100.00
1390.00
100.00
1625.00
100.00
1825.00
100.00

BH11
300 (mm)
N (kN)
M (kN-m)
485.00
50.00
890.00
50.00
1190.00
100.00
1575.00
100.00
2200.00
100.00
2550.00
100.00
2950.00
100.00
3500.00
100.00
4000.00
100.00

350 (mm)
N (kN)
640.00
1190.00
1625.00
2225.00
2950.00
3525.00
4025.00
4675.00
5250.00

M (kN-m)
50.00
50.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00

200 (mm)
N (kN)
M (kN-m)
185.00
40.00
260.00
40.00
140.00
100.00
250.00
100.00
725.00
100.00
725.00
100.00
975.00
100.00
1150.00
100.00
1310.00
100.00

BH12
300 (mm)
N (kN)
M (kN-m)
400.00
50.00
725.00
50.00
925.00
100.00
1225.00
100.00
1775.00
100.00
2050.00
100.00
2400.00
100.00
2850.00
100.00
3275.00
100.00

350 (mm)
N (kN)
530.00
975.00
1300.00
1775.00
2400.00
2850.00
3250.00
3800.00
4250.00

M (kN-m)
50.00
50.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00

200 (mm)
M (kN-m)
185.00
250.00
135.00
250.00
720.00
725.00
970.00
1150.00
1300.00

BH13
300 (mm)
M (kN-m)
400.00
725.00
925.00
1225.00
1775.00
2040.00
2375.00
2800.00
3225.00

350 (mm)
M (kN-m)
620.00
1150.00
1590.00
2150.00
2875.00
3450.00
3925.00
4575.00
5125.00

50.00
50.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00

N (kN)
40.00
40.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00

N (kN)
50.00
50.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00

Project: Kuantan Resin Plant, Malaysia


Client: Solutia Inc.
Subject: SUMMARY OF PILECAP DESIGN LOADS

Pile size
1 pile Group
2 pile Group
3 pile Group
4 pile Group
5 pile Group
6 pile Group
7 pile Group
8 pile Group
9 pile Group

Pile size
1 pile Group
2 pile Group
3 pile Group
4 pile Group
5 pile Group
6 pile Group
7 pile Group
8 pile Group
9 pile Group
Pile size
1 pile Group
2 pile Group
3 pile Group
4 pile Group
5 pile Group
6 pile Group
7 pile Group
8 pile Group
9 pile Group
Pile size
1 pile Group
2 pile Group
3 pile Group
4 pile Group
5 pile Group
6 pile Group
7 pile Group
8 pile Group
9 pile Group
Pile size
1 pile Group
2 pile Group
3 pile Group
4 pile Group
5 pile Group
6 pile Group
7 pile Group
8 pile Group
9 pile Group

Project No.
1652
Revision
A
Prepared by Whassan Date
Checked by
PC
Date
Approved by Jlim
Date

200 (mm)
N (kN)
M (kN-m)
375.00
40.00
640.00
40.00
700.00
100.00
1025.00
100.00
1675.00
100.00
1890.00
100.00
2300.00
100.00
2675.00
100.00
3000.00
100.00

BH14
300 (mm)
N (kN)
M (kN-m)
650.00
50.00
1225.00
50.00
1700.00
100.00
2250.00
100.00
3050.00
100.00
3575.00
100.00
4175.00
100.00
4900.00
100.00
5500.00
100.00

350 (mm)
N (kN)
1090.00
2075.00
2975.00
4000.00
5200.00
6200.00
7175.00
8250.00
9300.00

M (kN-m)
50.00
50.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00

200 (mm)
N (kN)
M (kN-m)
225.00
40.00
330.00
40.00
250.00
100.00
410.00
100.00
920.00
100.00
965.00
100.00
1250.00
100.00
1450.00
100.00
1650.00
100.00

BH16
300 (mm)
N (kN)
M (kN-m)
460.00
50.00
825.00
50.00
1100.00
100.00
1475.00
100.00
2075.00
100.00
2400.00
100.00
2800.00
100.00
3300.00
100.00
3775.00
100.00

350 (mm)
N (kN)
600.00
1100.00
1500.00
2050.00
2750.00
3300.00
3750.00
4375.00
4925.00

M (kN-m)
50.00
50.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00

200 (mm)
N (kN)
M (kN-m)
340.00
40.00
570.00
40.00
600.00
100.00
875.00
100.00
1500.00
100.00
1650.00
100.00
2050.00
100.00
2375.00
100.00
2700.00
100.00

BH17
300 (mm)
N (kN)
M (kN-m)
630.00
50.00
1175.00
50.00
1625.00
100.00
2175.00
100.00
2925.00
100.00
3400.00
100.00
3975.00
100.00
4650.00
100.00
5300.00
100.00

350 (mm)
N (kN)
740.00
1400.00
1925.00
2600.00
3450.00
4100.00
4700.00
5450.00
6100.00

M (kN-m)
50.00
50.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00

200 (mm)
N (kN)
M (kN-m)
315.00
40.00
515.00
40.00
525.00
100.00
775.00
100.00
1380.00
100.00
1525.00
100.00
1900.00
100.00
2200.00
100.00
2500.00
100.00

BH18
300 (mm)
N (kN)
M (kN-m)
590.00
50.00
1100.00
50.00
1500.00
100.00
2025.00
100.00
2750.00
100.00
3200.00
100.00
3725.00
100.00
4400.00
100.00
5000.00
100.00

350 (mm)
N (kN)
880.00
1675.00
2350.00
3175.00
4125.00
4990.00
5725.00
6550.00
7450.00

M (kN-m)
50.00
50.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00

200 (mm)
N (kN)
M (kN-m)
230.00
40.00
350.00
40.00
280.00
100.00
440.00
100.00
950.00
100.00
1010.00
100.00
1300.00
100.00
1525.00
100.00
1725.00
100.00

BH21
300 (mm)
N (kN)
M (kN-m)
470.00
50.00
850.00
50.00
1125.00
100.00
1525.00
100.00
2130.00
100.00
2450.00
100.00
2850.00
100.00
3365.00
100.00
3875.00
100.00

350 (mm)
N (kN)
975.00
1875.00
2650.00
3600.00
4600.00
5600.00
6400.00
7425.00
8310.00

M (kN-m)
50.00
50.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00

30/12/2011
28/12/2011
30/12/2011

Project: Kuantan Resin Plant, Malaysia


Client: Solutia Inc.
Subject: SUMMARY OF PILECAP DESIGN LOADS

Pile size
1 pile Group
2 pile Group
3 pile Group
4 pile Group
5 pile Group
6 pile Group
7 pile Group
8 pile Group
9 pile Group

200 (mm)
N (kN)
M (kN-m)
230.00
40.00
350.00
40.00
280.00
100.00
440.00
100.00
950.00
100.00
1010.00
100.00
1300.00
100.00
1525.00
100.00
1725.00
100.00

Project No.
1652
Revision
A
Prepared by Whassan Date
Checked by
PC
Date
Approved by Jlim
Date
BH20A
300 (mm)
N (kN)
M (kN-m)
470.00
50.00
850.00
50.00
1125.00
100.00
1525.00
100.00
2130.00
100.00
2450.00
100.00
2850.00
100.00
3365.00
100.00
3875.00
100.00

350 (mm)
N (kN)
665.00
1250.00
1710.00
2325.00
3090.00
3700.00
4200.00
4900.00
5500.00

M (kN-m)
50.00
50.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00

30/12/2011
28/12/2011
30/12/2011

You might also like