PROJECT: ACHRAFIEH 4748 EMPLOYER: ACHRAFIEH 4748 S.A.L. OWNER REPRESENTATIVE: CIVI ARCH S.A.L.

PROJECT MANAGER/ENGINEER: ASAM S.A.L. CONSULTANT: ERGA MANAGEMENT CONTRACTOR: A.R. HOURIE ENTREPRISES S.A.L.

Ref. No.:

RFIDate : 04/10/2012

R00

REQUEST FOR INSPECTION


We request your attendance to inspect the following works : 1. TYPE : 3. LOCATION : 1st floor slab east tower 4. INSPECTION :
Structural Structural Architectural Mechanical Electrical

2. INSPECTION TIME :9:30AM Axe Ae,le 1e,9e


First

DATE : Level 18:70m


Second

05/10/2012 B.O.Q Drawing No.


SD E-MD 505-1 R00
Third

5. PURPOSE OF THE INSPECTION :


Setting out
Exc. / Backfill

Architectural Setting out Block Stone Plaster Paint Tiling Ceiling Window/Door others

Mechanical Setting out Civil Works Piping Supports Insulation Pressure Test Equipment Others

Electrical Setting out Civil Works Cables Light Fittings


Equipment

Formwork Reinforcement Concreting Waterproofing Joints others

Others

Particular Details:

Installation of mechanical sleeves in 1st floor slab east tower as per shop drawing SDE-MD -502 -1 R00

Subcontractor's representative: Sabeco Contractor's representative: 6. INSPECTION REPORT :


Surveyor Civil Eng. Architect Elect. Eng.
Mech. Eng.

Signature: Signature: Received by : Date: SIGNATURE:

M. Barazi

Other

Date/Time of Inspection : 7. CONSULTANT'S COMMENTS :

The works are :

Approved

Approved as Noted

Rejected

Signature : Date : 8. PROJECT MANAGER'S / ENGINEER'S COMMENTS :

Signature :

Date :

Received by :

Date: