You are on page 1of 5

BB

AA

R
MECH 154 241 SF

O.9 O.2 N.1


KINDERGARTEN READING ROOM 153B 411 SF

L.9

K.1

H.1
KINDERGARTEN PLAY AREA 157 418 SF

F.1

D.1

C.1

A 13' - 8"

PHASING LEGEND (EAST WING OCCUPIED DURING PHASE II)


16 13 11 9 PHASE I - RENOVATED AREA PHASE IIB - RENOVATED AREA LINE OF (E) BUILDING PERIMETER PHASE II (temp) - TEMP ACCESS TO EAST WING DURING PHASE II PHASE IIB - NEW AREA

127 174 SF LITERARY ARTS AND RESOURCES 153 2006 SF THEATRE 126 1185 SF STAIR 3 116 CAFETERIA 117 2536 SF 251 SF 1ST GRADE CLASSROOM 1 115 749 SF

14 12 10 8 6 4 2.2 2
SCISSOR LIFT 147 42 SF STAIR 3 145 478 SF HALLWAY 146 738 SF CONFERENCE 139 CLASSROOM ? 143 745 SF CLASSROOM? 142 751 SF 196 SF GYM SUPPORT / STORAGE 148 234 SF STAGE & MUSIC ROOM 149 676 SF MULTIPURPOSE ROOM 152 6634 SF ELECTRICAL RM 155 GREEN ROOM / STORAGE 151 99 SF 117 SF WOMENS BOYS WC WC 132 131 136 SF 138 SF

6' - 0"

16 15

EGRESS PROTECTION
BOOTH

PHASE I - NEW AREA

MEN'S/ BOYS WC THEATRE STAGE 125 557 SF 118 DISHWASHING 123 200 SF KITCHEN 122 328 SF CORRIDOR LOBBY 101B 558 SF 101C 1044 SF FOOD 97 SF STORAGE JANITOR 121 176 SF 119 70 SF

1ST GRADE CLASSROOM 2 114 716 SF

7 5 3 2.1

OFFICE 111 268 SF

FLOOR 1 AREA SUMMARY BY PHASE


APPROXIMATE GSF

HEADMASTER OFFICE RECEPTION OFFICE OFFICE 138 133 141 140 293 SF 148 SF OFFICE 144 SF 144 SF 135 106 SF

READING ROOM OFFICE LOBBY 101A OFFICE 134 108 SF 1768 SF 103 278 SF 104 207 SF

READING ROOM 105 239 SF

RATED CORRIDOR

KINDERGARTEN CLASSROOM 107 811 SF

BOYS WC 108 169 SF

KINDERGARTEN CLASSROOM 109 863 SF

PHASE I 6/2012 - 8/2012 1 30


TEMP. RESTROOM

PHASE IIB 6/2013 - 8/2014


FLOOR 1 EXPANSION

UP UP

10530

10530
FLOOR 1 RENOVATION

BB

AA

O.9 O.2 N.1

L.9

A 4170 4170 5630 16160


PHASE II

PROPOSED - LEVEL 1 1/32" = 1'-0"

TEMPORARY 1-HR STAIR/ ELEVATOR ENCLOSURE

9800

PHASE I

THEATRE CONTROL 157 78 SF

STAIR 2 116 251 SF 1ST GRADE 1 115 CAFETERIA 117 2468 SF 749 SF

TOTAL AREA SUMMARY BY PHASE


APPROXIMATE GSF

THEATRE 126 1392 SF BOYS WC STORAGE 132 188 SF 129 164 SF THEATRE STAGE 125 569 SF CAFETERIA CAFETERIA DISHWASHING KITCHEN 123 200 SF 122 328 SF WOMEN'S WC KITCHEN 118 STORAGE 97 SF 121 JANITOR 176 SF 119 70 SF HALLWAY 101 2144 SF READING LARGE READING ROOM 1 OFFICE ROOM 2 HALLWAY 101 2144 SF 103 278 SF 104 207 SF 105 239 SF KINDERGARTEN 4 107 816 SF BOYS WC 108 115 SF 1ST GRADE 2 114 716 SF

BOTH PHASES

PHASE I 6/2012 - 8/2012

PHASE IIB 6/2013 - 8/2014


TOTAL SPRINKER & MINOR MECHANICAL UPGRADES

ADULT WC ELEC DATA 131 128 127 34 SF 45 SF 41 SF HALLWAY 141 COPY 139 STAIR 3 145 263 SF 2ND GRADE 7 144 745 SF 2ND GRADE 6 143 751 SF EXTENDED DAY 5 142 498 SF NURSE 137 1061 SF RECEPTION

VESTIBULE 111 ADULT WC 43 SF 112 57 SF

MEDIUM OFFICE 113 154 SF

SPRINKLER & MINOR MECHANICAL UPGRADES ONLY

20700

NO HATCH

20700
TOTAL EXPANSION

EXPANSION
KINDERGARTEN 3 109 863 SF

17130

17130
TOTAL RENOVATION

133 80 SF 48 SF 322 SF HEADMASTER MEDIUM OFFICE MEDIUM MEDIUM OFFICEOFFICE OFFICE 138 136 135 134 171 SF 111 SF 130 SF 153 SF

RENOVATION

17380

17390

34770
TOTAL PROJECT

Architects:

Project:

Owner / Client:
Town School for Boys 2750 Jackson Street San Francisco, CA 94115

Issued Date: Scale:

12/15/2011

Drawing Name:

Sheet Number:

As indicated

PHASING - LEVEL 1

PD1

Roundhouse One, 1500 Sansome Street, San Francisco, CA 94111 415 402 0888 mkthink.com

12/14/2011 2:38:36 PM

EXISTING - LEVEL 1 1/32" = 1'-0"

17380

PHASE I TOTAL

34520

PHASE II TOTAL

72600

BB

AA

X
240 283 SF

R
MECH 254 316 SF

O.9 O.2 N.1

L.9

K.1

H.1

F.1

D.1

C.1

PHASING LEGEND (EAST WING OCCUPIED DURING PHASE II)


LINE OF (E) BUILDING PERIMETER 16 PHASE II (temp) - TEMP ACCESS TO EAST WING DURING PHASE II PHASE IIB - NEW AREA

EQUIPMENT

16 15
SEMINAR

14 12 10 8 6 4 2.2 2
STAIR 1 270D 266 SF THIRD GRADE 229 617 SF 228 624 SF MUSIC ROOM 241 584 SF CHORAL / DRAMA / MUSIC ROOM 242 772 SF BOYS WC MUSIC153H ROOM 148 SF 243 MEN 217 SF 153I 56 SF CORRIDOR 200D 925 SF

SEMINAR 253 495 SF TEAM ROOM LANGUAGE ARTS 252 LEARNING RESOURCES 232 SF 1 251 LEARNING 168 SF RESOURCES 2 250 LEARNING RESOURCES 216 SF 3 244 127 SF LOBBY 200A 892 SF THIRD GRADE FOURTH GRADE 227 624 SF FOURTH GRADE 226 621 SF

255 609 SF

LAB/ WOODSHOP 261 1371 SF LAB/ MEDIA 258 1449 SF TECH TEAM AREA PHASE 2 LOBBY 101B 558 SF MECH 257 160 SF COPY/ SERVER STORAGE 258A 258E 126 SF 43 SF LAPTOP SERVICE 262C 55 SF CORRIDOR 200C 1181 SF WOMEN 262B 312 SF FLEX TECH/ MEDIA LAB 259 764 SF FLEX TECH/ COLLABORATION LAB 263 674 SF TEACHER PREP/ TEAM AREA - PHASE 1 262A 557 SF

PHASE I - NEW AREA


STAIR 3 201B 251 SF HUMANITIES 201 749 SF

13 11 9 PHASE I - RENOVATED AREA PHASE IIB - RENOVATED AREA

LITERARY ARTS FLEX 256 742 SF

HUMANITIES 202 472 SF

7 5

SEMINAR 203 446 SF

3 2.1

RATED CORRIDOR

153J 42 SF PROJECT ROOM 258D 1121 SF FACULTY LOUNGE 209 547 SF

FLOOR 2 AREA SUMMARY BY PHASE


APPROXIMATE GSF

MATH TECH 208 500 SF

MATH 207 499 SF

BOYS WC 220 202 SF

HUMANITIES TEAM ROOM 205 465 SF

MATH 204 559 SF

PHASE I 6/1/2012 - 8/30/2012 0

PHASE IIB 6/1/2013 - 8/30/2014


FLOOR 2 EXPANSION

DN UP

4750

4750
FLOOR 2 RENOVATION

BB AA Z Y X PROPOSED - LEVEL 2 1/32" = 1'-0"

O.9 O.2 N.1

L.9

A 8610 8600 17210

TEMPORARY 1-HR STAIR/ ELEVATOR ENCLOSURE

8610

PHASE I

13350

PHASE II

UPPER SCHOOL HUMANITIES 20 ART ROOM LIBRARY 224 373 SF LIBRARY 223 1930 SF CERAMIC 221 STORAGE BOYS WC 231 188 SF ADULT WC 232 HALLWAY 244 910 SF HISTORY SEMINAR 30 242 491 SF LITERATE WRITER SEMINAR 29 241 498 SF SPANISH SEMINAR 27 238 498 SF SPANISH SEMINAR 26 237 482 SF SERVER 236 38 SF TECH OFFICE 235 200 SF 32 SF BOILER 229 232 SF CLOSET CLOSET CLOSET 226 228 227 9 SF 23 SF 14 SF HALLWAY 201 TEL 1680 204 OFFICE SF 18 SF 233 69 SF UPPER SCHOOL DIRECTOR 234 170 SF FACULTY LOUNGE 203 362 SF STAIR 1 202 197 SF 225 150 SF COMP. REPAIR 218 51 SF 168 SF ART STORAGE 222 161 SF COPY 217 124 SF TECH LAB 215 512 SF BOYS WC 209 158 SF SCIENCE OFFICE 214 187 SF 219 1306 SF SPECIALTY WET LAB 213 910 SF STAIR 2 216 251 SF 212 749 SF

UPPER SCHOOL HUMANITIES 21 211 714 SF

STAIR 3 243 263 SF

SEMINAR 28 239 498 SF

4TH GRADE 25 205 661 SF

4TH GRADE 24 206 627 SF

3RD GRADE 23 207 627 SF

3RD GRADE 22 208 673 SF

Architects:

Project:

Owner / Client:
Town School for Boys 2750 Jackson Street San Francisco, CA 94115

Issued Date: Scale:

12/15/2011

Drawing Name:

Sheet Number:

As indicated

PHASING - LEVEL 2

PD2

Roundhouse One, 1500 Sansome Street, San Francisco, CA 94111 415 402 0888 mkthink.com

12/14/2011 2:38:42 PM

EXISTING - LEVEL 2 1/32" = 1'-0"

BB

AA

O.9 O.2 N.1

L.9

K.1

H.1

F.1

D.1

C.1

PHASING LEGEND (EAST WING OCCUPIED DURING PHASE II)


LINE OF (E) BUILDING PERIMETER 16
STUDIO / P.E. 354 862 SF STORAGE 355 113 SF STAIR 3 301B 253 SF MEN'S PE OFFICE VEST. RESTROOM 350 LOWER ATHLETIC FIELD 314 12816 SF 243 SF LOCKER ROOM 352 351 SF 360A 75 SF 351 106 SF WOMEN'S RESTROOM 356 43 SF ADULT SHOWER 357 37 SF

16 15 14 12 10 8 6 4 2.2 2
OFFICE 310 UPPER 170 SF SCHOOL DIRECTOR 323 LOWER LOBBY 300A 503 SF SUPPORT STAFF 309 313 SF OFFICE 322 153 SF OFFICE 321 151 SF BOYS WC 320 217 SF GYMNASIUM 360 5352 SF CLOSET 362 24 SF MECH. 361 100 SF ART ROOM 308 326 SF

PHASE II (temp) - TEMP ACCESS TO EAST WING DURING PHASE II PHASE IIB - NEW AREA

13 11

PHASE I - NEW AREA

PHASE I - RENOVATED AREA 9 7 5 3


U.S. BOYS 358 135 SF LANGUAGE TEACHER TEAM ROOM 305 Redundant Room CERAMICS 158 135 SF

PHASE IIB - RENOVATED AREA

CORRIDOR UPPER LOBBY 300B 432 SF HUMANITIES CLASSROOM 307 773 SF 370B 859 SF

RATED CORRIDOR

2.1

FLOOR 3 AREA SUMMARY BY PHASE


APPROXIMATE GSF

LANGUAGE CLASSROOM 306 105 SF

LANGUAGE CLASSROOM 303 1583 SF

PHASE I 6/1/2012 - 8/30/2012 1 0

PHASE IIB 6/1/2013 - 8/30/2014


FLOOR 3 EXPANSION

220 SF

DN UP

1200

1200
FLOOR 3 RENOVATION

BB

AA

O.9 O.2 N.1

L.9

A 4600 3160

PROPOSED - LEVEL 3 1/32" = 1'-0"

TEMPORARY 1-HR STAIR/ ELEVATOR ENCLOSURE

7760

4600

PHASE I

4360

PHASE II

GYM ADULT WC / STORAGE SHOWER 325 324 159 SF 75 SF

VESTIBULE 322 154 SF STAIR 2 316 GYM STORAGE 321 147 SF GYMNASIUM 319 5352 SF LARGE OFFICE 327 160 SF CLOSETHVAC 329 328 HALLWAY 301 LOWER SCHOOL MUSIC CLASSROOM 303 662 SF UPPER SCHOOL MUSIC CLASSROOM 307 304 572 SF 79 SF 58 SF MECH 318 100 SF STORAGE 317 24 SF 253 SF

MATH CLASSROOM 301 315 543 SF

GYM LOCKER BOYS WC 326 ATHLETIC FIELD 334 14006 SF 177 SF 323 441 SF

MATH CLASSROOM 302 314 SMALL OFFICE 313 76 SF ADULT WC 312 134 SF WC BOYS 311 MEDIUM OFFICE 89 SF 309 519 SF

STORAGE 331 31 SF MEDIUM MEDIUM OFFICE OFFICE 333 156 SF 332 144 SF

STAIR 1 302 213 SF

1440 SF 146 SF READINGLEARNING ROOM SERVICES MATH MATH CLASSROOM CLASSROOM CLASSROOM CLASSROOM 305 31 304 303 305 223 SF 306 255 SF 307 298 SF 308 441 SF

Architects:

Project:

Owner / Client:
Town School for Boys 2750 Jackson Street San Francisco, CA 94115

Issued Date: Scale:

12/15/2011

Drawing Name:

Sheet Number:

As indicated

PHASING - LEVEL 3

PD3

Roundhouse One, 1500 Sansome Street, San Francisco, CA 94111 415 402 0888 mkthink.com

12/14/2011 2:38:44 PM

EXISTING - LEVEL 3 1/32" = 1'-0"

BB

AA

O.9 O.2 N.1

L.9

K.1

H.1

F.1

D.1

C.1

PHASING LEGEND (EAST WING OCCUPIED DURING PHASE II)


16 15 14 12 10 9 8 7 6 4 2.2 2 5 3 2.1 LINE OF (E) BUILDING PERIMETER PHASE II (temp) - TEMP ACCESS TO EAST WING DURING PHASE II PHASE IIB - NEW AREA

16 13 11

PHASE I - NEW AREA

PHASE I - RENOVATED AREA

PHASE IIB - RENOVATED AREA

ROOF AREA SUMMARY BY PHASE


APPROXIMATE GSF

1
DN UP

1 PHASE I 6/1/2012 - 8/30/2012 H G F E D C B A 0 PHASE IIB 6/1/2013 - 8/30/2014


ROOF EXPANSION

BB AA Z Y X PROPOSED - LEVEL 4 1/32" = 1'-0"

O.9 O.2 N.1

L.9

TEMPORARY 1-HR STAIR/ ELEVATOR ENCLOSURE

650

650
ROOF RENOVATION

PHASE I

650

PHASE II

EXISTING - LEVEL 4
12/14/2011 2:38:47 PM

1/32" = 1'-0"
Architects: Project: Owner / Client:
Town School for Boys 2750 Jackson Street San Francisco, CA 94115

Issued Date: Scale:

12/15/2011

Drawing Name:

Sheet Number:

As indicated

PHASING - ROOF

PD4

Roundhouse One, 1500 Sansome Street, San Francisco, CA 94111 415 402 0888 mkthink.com

BB

AA

O.9 O.2 N.1

L.9

K.1

H.1

F.1

D.1

C.1

PHASING LEGEND (EAST WING OCCUPIED DURING PHASE II)


16 15 14 12 10 8 6 4 2.2
RATED CORRIDOR

LINE OF (E) BUILDING PERIMETER


STORAGE 005B 261 SF

16
STORAGE 004E

PHASE II (temp) - TEMP ACCESS TO EAST WING DURING PHASE II PHASE IIB - NEW AREA

39 SF VESTIBULE STORAGE

13 11

PHASE I - NEW AREA

WORKSHOP 005C 004D 67 SF 35 SF 005A 377 SF STORAGE 004C 41 SF STORAGE 004B 34 SF STORAGE 004A 30 SF

PHASE I - RENOVATED AREA 9 7 5 3 2.1

PHASE IIB - RENOVATED AREA

2
OFFICE 002A 267 SF OFFICE 002B 237 SF

BASEMENT AREA SUMMARY BY PHASE


APPROXIMATE GSF

ELEC 001A 38 SF

ELEC 001B 38 SF

ELEC 001C 38 SF

1
UP UP

PHASE I 6/1/2012 - 8/30/2012 0

PHASE IIB 6/1/2013 - 8/30/2014


BASEMENT EXPANSION

200

200
BASEMENT RENOVATION

BB AA Z Y X W PROPOSED - BASEMENT 1/32" = 1'-0"

O.9 O.2 N.1

L.9

A 0 0 0

PHASE I

200

PHASE II

STORAGE 001 261 SF

WORKSHOP 002 376 SF TRASH 003 52 SF

DEVELOPMENT DEVELOPMENT OFFICE OFFICE 005 267 SF 004 237 SF

EXISTING - BASEMENT
12/14/2011 2:38:33 PM

1/32" = 1'-0"
Architects: Project: Owner / Client:
Town School for Boys 2750 Jackson Street San Francisco, CA 94115

Issued Date: Scale:

12/15/2011

Drawing Name:

Sheet Number:

As indicated

PHASING - BASEMENT

PD0

Roundhouse One, 1500 Sansome Street, San Francisco, CA 94111 415 402 0888 mkthink.com

You might also like