Tunnels
Tunnels
Tunnels
Adit.....................................galeri Tunnel................................tnel Subway..............................metro Shaft...................................baca Chamber............................oda Portal.................................ana giri veya k Pilot adit.............................yan galeri, pilot galerisi Centre................................merkez, eksen Face...................................ayna Wall ~ site..........................yan, kenar, duvar Floor...................................taban Roof...................................tavan
Overbreak.............................ar sklme Excavated profile..................kaz profili Natural archling....................doal kemerlenme Load......................................yk Support.................................destek, iksa Failure...................................yenilme, kme Gentle failure........................yava yenilme Rock burst............................kaya patlamas Squeezing ground................skan zemin Swelling ground....................ien zemin Clay-filled joint.......................kil dolgulu eklem Long term stability.................uzun sreli durayllk Ground treatment..................zemin iyiletirmesi Support before excavation....kaz ncesi destekleme
Jet grouted roof cover..............jet grouting ile iyiletirilmi tavan rts Shotcrete initial lining..............pskrtme beton balang izgisi Jet grouted floor cover............jet grouting ile iyiletirilmi deme Top heading............................kalot (Crown) Invert.......................................stros (Bottom excavation) Bench......................................zengi izgisi Final concrete lining................sonuncu beton kaplama (nihai beton kaplama izgisi) SHIELD tunnelling method..............KALKAN Yntemi CUT & COVER tunnelling method....A-KAPA Yntemi TBM (Full face ~ Total Boring Machine).....TM KEST KAZI MAKNASI
DRILLING....................Sondalama
BLASTING...................Patlatma
TUNNEL DESCRIPTION
1.
2. 3. 4. 5.
6.
Made into natural material (rocks) Empty inside Carry the loads itself Both ends are open to atmosphere Generally horizontal Thick walled structure looks like cylinder
1- Kilit (anahtar) ta........................Key stone 2- Kemer...........................................Arch 3- Ayak (duvar)................................Wall 4- Taban...........................................Floor 5- zengi..........................................Bench 6- zengi izgisi (dzeyi)...............Bench line or plane 7- Kalot............................................Top heading 8- Stros............................................Invert 9- Ano..............................................Ano (unit)
1- Digging section 2- Support 3- Swelling section 4- Pressurized area 5- Flow direction of water
SURFACE EXCAVATIONS
UNDERGROUND EXCAVATIONS
In Rock In Sediment
Stability & Arching Water
Gases
Carbon dioxide (CO2) Carbon monoxide (CO) Methane (CH4) Hydrogen sulphide (H2S) Other gases
Gas bursts......................gaz patlamas Rock falls........................kaya dmesi Rock bursts....................kaya frlamas Squeezing ground..........ien kabaran zemin Temperature Subsidence
Geomorphologic maping and preparation of longitudinal & cross sections Geological maping & surveyings (aerial photographs) Geophysical surveyings Underground explorations, boreholes Ground water surveyings Laboratory tests Model studies
SURFACE EXCAVATIONS
SUBSURFACE EXCAVATIONS
1.
GEOLOGY
Soil profile or hard rock geology 2. Structure 3. Ground water (hydrogeology) 4. Stability
1.
2.
INVESTIGATIONS
1. 2. 3. 4.
5.
Mapping (Topographic, geologic, etc...) Geophysical surveying (especially seismic velocity of rocks) Trial pits & boreholes General and local stability analysis Decide to excavation method
UNDERGROUND EXCAVATIONS
Adit, shaft, incline, large chamber Tunnel Subway ~ metro Underpass Shelter Power house Ware house, store, mining ...etc
GASES (can be lethal or burst) Carbon monoxide (CO) 0.97 of air Carbon dioxide (CO2) 1.53 of air Methane (CH4) 0.55 of air
(Highly explosive with air) marsh gas
Hydrogene sulphide (H2S) 1.19 of air (Highly toxic and explosive) Sulphur dioxide (SO2)
ROCK FALL
SQUEEZING GROUND (sand, silt, shale, clay) ROCK BURST
Mineralogical composition of rocks Texture & fabric Petrographic features Structure Rock mass Strike & dip of beds in relation to face of excavation Intensity of tectonic disturbances Degreee of weathering
Loose soils Soil easy to spade (bel ile kazmak) Soil easy to dig Crumbling weak rocks (ufalamak) Rocks easy to blast Rocks difficult to blast Rocks very difficult to blast
TUNNELLING METHODS
This method involves the use of shield machine to drive the tunnels below the ground. After completion of a work shaft, the shield machine is lowered into the shaft and assembled there before excavation and construction of the tunnels using precast concrete lining segments of about 1.2 meter width. This construction method causes minimal disruption to traffic and the environment because all the work takes place below ground and the ground level environment is unaffected.
This construction method, whereby the site is fully excavated, the structure built and then covered over, uses diaphragm walls as temporary retaining walls within the site area. Step one :Construction of diaphragm walls, pin piles, and decking. Step two :Excavation within the diaphragm walls, installing struts as work progresses. Step three :Construction of permanent floor slabs and walls. Step four : Fitting out the internal structures, backfilling, and reinstating the surface structures.
Mechanical-support TBM Compressed-air TBM Slurry shield TBM Earth pressure balance machine Mixed-face shield TBM
A mechanical-support TBM has a full-face cutterhead which provides face support by constantly pushing the excavated material ahead of the cutterhead against the surrounding ground.
2- Compressed-Air TBM
A compressed-air TBM can have either a full-face cutterhead or excavating arms. Confinement is achieved by pressurizing the air in the cutter chamber.
A slurry shield TBM has a full-face cutterhead. Confinement is achieved by pressurizing boring fluid inside the cutterhead chamber.
An earth pressure balance machine has a full-face cutterhead. Confinement is achieved by pressurizing the excavated material in the cutterhead chamber.
Mix-face shield TBMs have full-face cutterheads and can work inclosed or open mode and with different confinement techniques.
Effect of soil layers: horizontal, vertical and inclined layers have different kinds of loading conditions for tunnels.
Effect of faults: the relation between the fault slope direction and the tunnel direction, width of the fault zone, type and thickness of the fill material and the hydrostatic pressures in both sides of the fault are some problems in the tunnelling.
Tunnel excavations in the slopes: the discontinuities (layers, fissures) inclined inside or outside of the slope are very important regarding the stress and strength of the tunnel.
Effect of the folds: While tunnel is excavated in an area that contains folded rocks, different stresses and conditions may occur depending on the fold type.
Classification of rocks for engineering purposes is needed in analyzing the project costs and to obtain an economic and reliable solution.
The classification of the rocks, that the tunnel will be constructed in, is first done by Terzaghi. But, it is too general and gives qualitative results.
Consist of two concrete lined tunnels each of which is 7.62 m in diameter and 26.4 km in length discharging water from the reservoir of Atatrk Dam.