Switchyard Phase II status as on 17/10/12

Manpower: 23

Particular (Equipment)
Lighting Mast Tower T2 Tower T2P Tower T2PB Tower T2PH Tower T2A

Total Excavation
6 16 06 02 06 03 3 9 2 1 2 2

PCC
3 9 2 1 2 2

Raft
3 9 2 1 2 1

First lift
3 6 2 1 1 1

Second lift 1 4 1 1 0 0

Control Room
Particular (Equipment)
Columns

Total Excavation
25 10

PCC
8

Raft
8

First lift
0

Second lift 0

Excavation and Raft of Control room under Progress.

Thanks and Regards, Anand Sinha Engineer (Electrical)