You are on page 1of 1

Improve HOSR: Chec the Hopping plan.

Chec the Neighbor Plan High TR Fail: Chec and clear TR fail from oss end. Chec HW:

Chec Chec Chec Chec Path

Alarms on site. TRXs,Chec Slips. the Hopping plan. BB2F card., Chec VSWR, imbalance,Connector, Connection,Chec TMA

You might also like