ELECTRICAL LOAD SCHEDULES
TEMPORARY CONSTRUCTION POWER
PANEL :
CKT.
NO.
1
3
4
5
6
7
8
MAIN
ACB
LP
Volts : 230 vac, 60 Hz
BRANCH BREAKER
AT AF
P
Kaic
20
50
2
10
20
50
2
10
20
50
2
10
30
50
2
10
30
50
2
10
30
50
2
10
AT
60
AF
100
P
2
T
BO
BO
BO
BO
BO
BO
Kaic
10
Ifl=
54.43
+ ( 25 %
57.43
1.00
x
=
NUMBERS OF OUTLET
L.O. C.O.
OTHERS
4-400W,SPOT LIGHT
8
2-600W, GRINDER
2HP, Water Pump
2HP, SUMP PUMP
2HP, ELECTRIC BAR CUTTER
SPACE
Total Connected Loads
Demand Factor
Total Demand Loads
12 )
57.43 amps
Phase: 1.00
Wires :
LOADS IN AMPERES
KVA BRANCH CIRCUIT FEEDERS ( THHN)
3Ph
AB
BC
CA LOADS Set
C
No W(mm2)
6.96
1.60
1
20
2
3.5
6.26
1.44
1
20
2
3.5
5.22
1.20
1
20
2
3.5
12.00
2.76
1
20
2
5.5
12.00
2.76
1
20
2
5.5
12.00
2.76
1
20
2
5.5
1.00
57.43
54.43
12.52
Set
1
MAIN CIRCUIT FEEDER
C
No W(mm2)
32
2
30
3.00
T FEEDERS ( THHN)
G(mm2)
2.0
2.0
2.0
2.0
2.0
2.0
IT FEEDER
G(mm2)
8