Earthing in Power Station
Earthing in Power Station
adequate Earthing in a substation is an important safety measure. Earthing means connecting the electrical equipment to the general mass of earth of low resistance. Objective is to provide under and around the substation a surface of uniform potential -- At near zero or absolute earth potential
2
Objective:
The touch and step potential shall be within limits under all conditions including fault condition Grounding resistance shall be lower. Effective earthing system shall aim at providing protection to life and property against dangerous potentials under fault conditions
3
Rule 92
Every substation /generating station exposed to lightning shall adopt efficient means for diverting the electrical surges due to lightning to earth Earth lead of any lightning arrestor shall not pass through any iron or steel pipe. It shall be taken directly, as far as possible, to a separate earth electrode and/or junction of the earth mat. Bends Shall be avoided where ever practicable Earth screen if provided for lightning protection shall be connected to main earth grid.
4
It shall be capable of passing maximum earth fault current The passage of fault current does not result in any thermal or mechanical damage to the insulation of connected plant / equipment Every exposed conductor part and extraneous conductive part may be connected to the earth. There is no danger to the personnel Ensure equi-potential bonding within the power system No dangerous potential gradients (step or touch or transfer potentials) shall occur under normal or abnormal operating conditions To minimize electromagnetic interference between power and control/ communication system
5
Earthing System
Points to be earthed in a substation
The neutral point of each separate system should have an independent earth, in turn interconnected with the station grounding mat. Equipment frame work and other non-current parts (two connections) All extraneous metallic frame works not associated with equipment ( two connections) Lightning arrestors should have independent earths, in turn connected to the station grounding grid.
6
Earthing System
Points to be earthed-contd
Over head lightning screen shall also be connected to main ground mat. Operating handles of Isolators with a auxiliary earth mat underneath, if necessary. Peripheral fencing Buildings inside the switch yard. Transformer Neutrals shall be connected directly to the earth electrode by two independent MS strips
7
Grounding:- connection of current carrying parts to ground. Ex :Generator or transformer neutral. This is for equipment safety. In a resistance grounded system it limits the core damage in stator of rotating machines. In solidly grounded system substantial ground fault current flows enabling fault detection and faster clearance.
connection of non current carrying parts to ground. Ex : Metallic enclosure. This is for human safety. Earthing system plays no role under balanced power system conditions. Under ground fault conditions, enables ground fault current to return back to source without endangering human safety.
9
Current flows through a series of hemi-spherical shells of earth of continuously increasing cross sections. Almost 95% of final resistance is contributed by soil within 5mts of the electrode. If current is discharged from a grid towards another grid at B100 km away, only soil with in 5 to10 mts of the electrode contributes maximum resistance. Earth beyond, offers very minimum resistance. This is the concept of treating the soil around 11 electrode of an earth pit.
Earth with its huge mass offers equipotential everywhere A very large charge is required to change earth potential everywhere Disturbance due to current injection at a point is felt, only locally.
12
Parameters for the calculation of Maximum permissible step and touch potential
Fault duration :- Fault clearing time of back up protection is adopted Modern protection systems provides for fast acting back up protection Considerable saving can be made by optimizing the size of the conductor of earthing grid by considering lesser fault duration. These will change the earth potential raise due to which Step and Touch potentials arise.
14
safe current a person can tolerate and still release grip of an energised object, using muscles affected by the current The magnitude of let go current adopted in calculating maximum permissible step and touch potentials (As per IEEE 80 1976) for man 9 milli amps for woman 6milli amps
15
Developed by Dalziel and approved by AIEE80-1963 Magnitude of power frequency alternating current (mA) that a human body of average weight( 50kgs to 70 kgs) can with stand without ventricular fibrillation, I =0.116 for a body of 50kgs wt. t I =0.157 for a body of 70kgs wt. t Av. Value of human body resistance (dry) 8 to 9 K-ohms Adopted value for designing Earthing system 16 1Kohms
Non fibrillating current adopted for earth grid design in India. Magnitude of power frequency alternating current that a human body of average weight( 50kgs to 70 kgs) can with stand without ventricular fibrillation, I =0.165 t I = rms current through human body in amps t =durtation of shock in seconds Assumption /considerations in deriving the above equation --The duration of shock is from 8 milli-seconds to 3 seconds
17
During a line to earth or double line earth fault current through earthing system causes a) Heating of earthing conductor b) Potential gradients in the soil For earthing design single line to ground fault is considered as Most of the faults are of this type Current through earth in case of single line to earth fault is higher that in the later case.
18
Substation Earthing
Fault duration and magnitude-contd.
For determining maximum permissible step and touch potentials Fault duration corresponding to maximum fault clearing time of back up protection relays are considered Normally in modern sub station clearance time of primary protection is 0.2 sec, ie., 200 milli sec and clearance time for back up protection is 0.5 sec, ie., 500 milli sec A fault duration time of 0.5 sec (500 mill sec) is 19 adopted for design
Substation Earthing
Fault duration and magnitude-contd. Earthing conductor once placed under earth may not be inspected normally. Prudent to make it capable of carrying maximum possible current for maximum time. If felt necessary and if it is economical, fault duration of 1 sec can be adopted for design.
20
Substation Earthing
Soil resistivity
To design most economically and technically sound earthing system accurate data of soil resistivity and its variation with in substation soil is essential. Resistivity of soil in many substations has been found varying -at times between 1 and 10,000 ohm meters. Variation in soil Resistivity with depth is more predominant as compared to variation in horizontal distances.
21
Substation Earthing
Soil resistivity
Large variations in stratification of earth layers will result in large variations in earth resistivity. Highly refined techniques for the determination of resistivity of homogeneous soil( non uniform soil) is available. As resistivity of soil varies widely based on moisture content earth resistivity readings to be obtained in summer or dry season. Weiner's 4 electrode method is generally adopted for testing.
22
Earth resistivity tests shall be carried out at least in 8 directions If results obtained indicate wide variation, test shall be conducted in more number directions. Four electrodes are driven into earth along a straight line at equal intervals. Current is passed through two outer electrodes and earth. Voltage difference is measured between two inner electrodes.
23
Substation Earthing
Soil resistivity
Current
flowing through the earth produces are electric field proportional to current density and resistivity of soil. Voltage measured is proportional to the ratio of voltage to the current i.e R = 4sR - __s__ 1+ 2s___ s+e s+4e
24
Substation Earthing
Soil resistivity
Where = Resistivity of soil in ohm-meter s= Distance between two successive electrodes in meter R= Ratio of voltage to current or electrode resistances in ohm e= depth of burial of electrodes in meters In case depth of burial of the electrodes in the ground (e) is negligible compared to electrodes spacing. This formula is the adjusted =2sR
(This formula is normally adopted in AP Transco Ltd.)
25
Earthing System
Permissible resistance of earthing system
Primary requirements : Impendence to ground (resistance of earthing system) Small substations 2 Ohms EHV substations up to 220 kV 1 Ohm Power stations and 400 kV substations 0.5 Ohms Distribution transformer - 5 Ohms. In order to avoid abnormal shift of the neutral potential, earth resistance of the station earthing system shall be normally less than or equal to 1ohm.
28
Step potential - Difference in surface potentials experienced by a man bridging a distance of 1 mt with his feet, with out contracting any other grounded object. Touch potential- potential difference between the earth potential raise and the surface potential at the point where a person is standing touching an earthed structure. Tolerable touch potential of human body is less than tolerable step potential.
29
In any switch yard, chances of exposure to Touch potential is higher than that to step potential. Resistance offered by the feet of a person against Touch potential is much less compared to that against Step potential. Hence Touch potential is more critical for design while Step potential is usually academic.
30
Step potential is independent of the diameter ( crosssection) of the earthing conductor. For 400% increase in diameter, reduction in Touch potential is only 35%. Thus cross- section has minor influence on Touch and Step potentials. Length of earthing conductor has significant effect on Touch and Step potentials.
31
32
34
35
Earthing materials
-
Determination of size of conductor for earth mat. Based on thermal stability determined by an approximate formula of IEEE - 80-1986 A = I/ ( TCAP x10 4) I n (Ko + Tm)
tc x ir r (Ko + Ta)
Where In case of steel A = I x 12.3 tc mm for welded joints = I x 15.13 tc mm for bolted joints In case tc = Duration of current =1sec A = 12.3 x I mm for welded joints = 15.3 x I mm for bolted joints
36
Earthing materials
Ratio of max width to thickness =7.5 Thickness for flat shall not be less than = 3mm (As adopted 5to 6mm) Minimum dia for steel rod = 5mm Standard sizes of conductor as, As per IS 1730 1989 (I)10 x 6mm (II)20x6mm (II)30 x 6mm (IV)40 x 6mm (IV)50 x 6mm (VI)60 x 6mm (VI)50 x 8mm (VIII)65 x 8mm (IX)75 x 12mm (X)100 x 16mm - For 33kV Substations 75x8mm and 50x6mm
37
Earthing materials
Up to 220 kV substation Earth mat a) Peripheral or main earth mat : 100x 16m MS flat b) Internal earth mat : 50x8m MS flat placed at 5 m apart c) Branch connections : cross section not less than 64.5 sq.m d) Raisers : 50x8m MS flat For 400 kV substation Earth mat a) Peripheral or main earth mat :40mm dia MS rod of 3mt. length b) Internal earth mat 50x8mm MS flat placed at 5m apart c) Raisers : 50x8m MS flat Where necessary, 40mm rods will be driven in to earth vertically along the periphery of the earth mat.
38
Pipe earthing
a)
1.
2. 3.
Joints are to be kept down to the minimum number All joints and connections in earth grid are to be brazed, riveted, sweated, bolted or welded. For rust protection welds shall be treated with Barium chromate.
39
Earthing
2. 3.
4.
5.
Welded surfaces to be painted with red lead and aluminium paint and then with bitumen. Joints to be broken periodically shall be bolted and joint faces tinned. All exposed steel earthing conductors should be protected with bituminous paint All joints in steel earthing system shall be welded except joints to be removed for testing shall be bolted.
40
a. b. c. d.
e.
f.
42
B.
Design permits extension of earth mat up to fencing Calculated touch potential within safe limit Extending the earth mat up to perimeter fencing and connecting the fencing at frequent intervals to earth mat Spreading crushed metal 1.5mt beyond fencing
43
Design permits extension of earth mat up to fencing Calculated touch potential beyond the fence above the permissible limit for touch potential Termination of earth mat within 1.5 mt of fencing Fence electrically isolated and independently earthed by running an earthed conductor underneath the fence connecting it to the fence at frequent intervals
44
In GIS multi-components like buses, switch gear associated equipment are present in an earthed metallic housing They are subjected to same magnitude of fault current and require low impendence earthing Compared to a conventional substation, as GIS requires only 25% of land area design of earth mat is comparatively difficult. Metallic enclosures of GIS have induced currents, specially during internal earth faults.
45
Inductive voltage drop occurring with GIS assembly shall be taken into account for the design of earth mat Touch voltage criteria = (FA)2+(EG)2 < ET (max) Where FA = Actually calculated touch voltage EG = Max value of metal to metal voltage difference
between structures on and between GIS enclosures or GIS enclosures and supporting
ET (max) = maximum permissible touch voltage Metallic enclosures of GIS may be continuous or not In either case provision of earth bond frequently is essential to minimize hazards of touch potential In addition, earthing of GIS structures and service platforms at frequent intervals are to be done.
46
47
Thank you