TOTAL STATION

SOKKIA Total Station Parts


1. 2. 3. 4. 5. 6. Tripod Stand Base Plate Three Leveling Screws Two Arms (Left & Right) Vertical Circle Foxing Screws Station Centering Foxing Left & Right Foxing Up 7. Two Bubble Tubes 8. Telescope 9. Eye Piece 10. Object Glass Or Objective 11. Optical Sight Finder Or Collimator 12.Eye Piece for Centering 13.Data out Cable Pin Fixed 14.Marks Of Instruments Height 15.Compass Taker 16.Battery 17.Battery Pocket 18.Foxing Screws Locks Horizontal calculation of Instruments Vertical Calculation of Telescope 19.Instrument Handle 20.Display Screen Or Liquid Crystal Display 21.Key Board Numerical / Alphabets Letters 22.Four Arrow Keys Up , Down , Left , Right, 23.Enter Key 24.Four Function Keys F1 , F2 , F3 , F4, 25.Escape Key 26.Bs Key Mean (Back Sight) 27. SFT Key Mean (Shift) 28.FUNC Key Mean ( Function)

Technical Terms and Abbreviation


ZA= Line of Sight / Collimation Axis Telescope Axis= Line from the Recital to the Center of the Object. SA= Standing Axis Vertical Rotation Axis of the Telescope KA= Tilting Axis Horizontal Rotation Axis of the Telescope V= Vertical Angle VK= Vertical Circle With Coded Circular Division for Reading V-Angle Hr= Reflector high above Earth / Ground H1= Instrument Height above Ground H2= Horizontal Distance HK= Horizontal Circle With the Circular Division for Reading the Hz-Angle EO= Station Co-Ordinates (Easting) No= Station Co-Ordinates (Northing) HO= Station Height E= Easting of Target Point N= Northing of Target Point H= Height of Target Point

Operating the Instruments


Focus Symbols Fixed Keys Alphanumeric Keys Navigation Keys Function Keys Soft Key Bar

Fixed Keys
Page Menu User FNC Esc Enter Trigger Keys The Measurement Trigger has three Settings (ALL, DIST, OFF)

Soft Keys
ALL LIST NEXT DIST FIND OK REC EDM ENTER IR/RL ENH PREWIE

Applications
Surveying Stake Out Tie Distance Area & Volume Free Station Reference Line / Arc Remote Height Construction

Down Loading
Press F4 for Configuration Open Temp Press Angle Distance Feet Units (Enter)

Esc

COMMUNICATION (Enter) Bound Rate Data Bit Priority Stop Bit F3 Job Selection = 9600 =9 = Even = 1 Bit Menu

Esc Job

Esc

All Files Open

Select Your Files Open

Esc

COMMUNICATION Out Put (Enter) All Files Open Select Youre Files (Enter)

ProLink Software Use for Total Station Open Prolink and Go to Options Units Go to File Send / Receive File Open Download / Upload

Settings