Professional Documents
Culture Documents
Approval Process Complaints and Appeals
Approval Process Complaints and Appeals
Shish Haider Chowdhury Finance Controller (Army), Log Area Dhaka Cantonment BPI, 6 March 2012
Approval Process
If AA is HOPE/PD/PM/AO then: EC ER ER with recommendation HOPE/PD/PM/AO [Decides & Returns]
PE
Approval Process
If AA is Ministry then: EC ER Purchase Proposal along with ER with recommendation HOPE Secretary [Add Comments] Ministry Decides & Forwards PE
Approval Process
If RA is CCGP then: EC ER Purchase Proposal along with ER and recommendations HOPE Secretary Minister [Add Comments] Secretary [Summary]Minister CCGP [Decides] PE
Approval Process
If AA is Secretary then: EC ER ER with recommendation Secretary [Decides & Returns] PE
Further Notable
Procuring Entities shall, for Procurement above the threshold specified in Schedule i.e. G&W TK 10m and above and for Services TK. 5 m and above, shall submit to the CPTU procurement related reports on quarterly basis indicating the time; Procuring Entities, Evaluation Committees and Approving Authorities shall, for performing activities, from the time of Tender opening to the issuance of the Notification of Award following time-limits specified in Part of Schedule III. (7) All the Procuring Entities shall, in the case of procurement processing and approval, use the check lists in Schedule IV.
To Remember
ER be finanlised and NOA issued before the expiry of the Tender/Proposal validity; ER be sent to the AA strictly by adhering to the Rule 36; AA approves after review or raises objections within the time limit allowed; Objections if any be sent to the Chairperson of the EC who meets them within 5 days (WD) from the date of receipt following the same route; AA while instructs the re-process that leads to the cancellation of Tenders/Proposals; PE then may proceed for re-tender as per Rule 33.
Key Elements
Test of transparency; Credibility; Public Confidence; Trust.
Any person who claims to have suffered loss or damages due to breach of a responsibility assigned with PE, may lodge a complain
Right to Complain
Grounds: Pre-qualification documents not ready or available; Failure to respond promptly to request for clarifications; Failure by TEC to evaluate qualifications in accordance with criteria set out in prequalification document; Perceived unfair denial of pre-qualification; Possible corrupt or collusive practice.
Right to Complain
Advertisement procedures not adhered to; Tender documents not ready; Failure to respond promptly to request for clarifications; Framing technical specifications around small number of suppliers/manufacturers of particular products; Failure to hold pre-tender meeting meeting in accordance with advertisement.
Right to Complain
Failure to open tender in accordance with advertisement; Opening any tender received prior to the set deadline; Failure to open all tenders on time; Failure to evaluate tenders in compliance with stabilised criteria; Attempts by PE to negotiate with successful tenderers;
Right to Complain
Corrupt or collusive practice; Unfair or erroneous award of contract; Breaking confidentiality at the time of clarifications (in case of TSTM)
No right to complaint
The choice of procurement methods for goods, works and services; A refusal to short-list an applicant; The decision to reject applications for prequalification, tenders, quotations or proposals; A decision of award made by CCGP
Level of complaints
Administrative Level Review Level.
Administrative Level
PE (PD/PM/PO/AO) issuing TD/RFP; HOPE; Secretary.
Review Panel
Only when a person has exhausted all his or her options of complaints at the administrative level.
Administrative Level: PE
A person submits complaints in writing within 7 CD of awareness of the circumstances to PE issuing TD/RFP; PE has 5 WD to consider the complaint and state the reasons for this rejection or take any corrective actions; If not satisfied, the complainant addresses the same complaint to HOPE within subsequent three WD after elapse of 5 WD from the date of lodging the complaint to PE.
If not satisfied, the complainant addresses the same complaint to the Secretary of the Ministry within subsequent 7 WD after elapse of 5 WD from the date of lodging the complaint to HOPE.
If the complainant is not satisfied with the decision of the Secretary, he or she may appeal for the complaint to the review panel within 7 WD of the receipt of such decision from the Secretary.
Modes of complain to RP
Addressed to chairperson RP duly sealed and confidential through DG, CPTU; Cover letter to DG, CPTU shall mention the type of complaint; Appeal shall include the registration fee and SD of specified amount in favour of DG, CPTU; Opened only by the Chairperson,RP
Fees and SD
Below 10 m RF TK. 10,000 and SD TK. 50,000 From 10 m to 50 m RF TK. 15,000 & SD TK. 1,00,000; From 50 m to 100m RF TK. 20,000 and SD TK. 2,00,000; Above 100m RF TK. 25,000 and SD TK. 5,00,000 For complaints on issues prior to Tender opening, RF TK. 10,000 & SD TK. 50,000
Appointment
By CPTU (members and Chair) with TOR with approval of the M/O planning; RP may request the CPTU for co-opt 2 m2wmbers from the list of specialist on a case by case basis.
Processing of complaint
Up on receipt of the SD and RF CPTU selects the RP on a rotational basis within 5 WD; No complaint will be entertained without RF and SD.