Single-Phase Watthour Meter

I N S TA L L AT I O N I N F O R M AT I O N
These installation instructions are for socket-mounted single-phase watthour meter (selfcontained Forms 1 S and 2S).

Dangerous voltages are present. Personal injury, death, or equipment damage can result if safety precautions are not followed. For Form 1S and 2S Meters 1. Make sure meter to be installed matches service type (form), current class, capacity required, and service socket. 2. Check socket and verify correct wiring. See Figure 1 for self-contained meters and Figure 2 for transformer-rated meters. 3. Remove paint, if any, from socket rim at point of contact with the meter lightning ar rester ground straps to ensure proper grounding. 4. Be sure voltage disconnect or test link on back of meter is closed, if installed. 5. Line up meter blades and socket jams and rock meter into place. Make sure meter is in upright position with rotor shaft vertical and free from vibration. 6. Make sure rotor disk turns from left-to-right when viewed from front. 7. Apply all seals and record necessary information.

WARNING

Self-Contained Meters and Socket Wiring (Front View)

HOW TO READ A POINTER STYLE METER


The rotating disk in the meter drives a set of gears which turn clock-type hands on the meter register. The hands on adjacent dials revolve in opposite directions.

To determine the energy expended over a period of time, read the meter at the beginning of the period and again at the end. The difference in the readings is the consumption during the period.

7 Ross Cannon Street York, SC 29745

Phone: 803-628-0035

Fax: 803-628-7544

www.austininc.com

Note: Warranty is void if seal is broken.

All meters are calibrated and sealed before shipment. For proper installation, accuracy, and maximum life of the meters, use the following installation procedures.

Installation of a Form 2S meter used as a Form 1S, 120 volt, 2 wire meter

ESTIMATING THE LOAD


To determine the approximate load on a meter at a specific time, count the number of times the disk goes around during a measured interval. Use a stop watch if possible and an interval of at least one minute for accuracy. Note the Kh on the meter nameplate. Then, use this formula: Load (in watts) = Kh x disk revolutions x 3600 seconds/hour time in seconds Time in seconds

Example: A meter with a Kh of 7.2 makes 14 revolutions in 70 seconds. Load = 7.2 x 14 x 36005 = 184 watts = 5.184 kilowatts 70
DISCLAIMER OF WARRANTIES AND LIMITATION OF LIABILITY
THERE ARE NO UNDERSTANDINGS, AGREEMENTS, REPRESENTATIONS, OR WARRANTIES, EXPRESS OR IMPLIED, INCLUDING WARRANTIES OF MERCHANTABILITY OF FITNESS FOR A PARTICULAR PURPOSE, OTHER THAN THOSE SPECIFICALLY SET OUT BY ANY EXISTING CONTRACT BETWEEN THE SELLER AND BUYER. ANY SUCH CONTRACT STATES THE ENTIRE OBLIGATION OF SELLER. THE CONTENTS OF THIS INFORMATION SHEET SHALL NOT BECOME PART OF OR MODIFY ANY SUCH PRIOR OR EXISTING AGREEMENT. The information, recommendations, descriptions, and safety notations are based on Austin Internationals experience and judgment. THIS INFORMATION SHOULD NOT BE CONSIDERED AS ALL-INCLUSIVE OR COVERING ALL CONTINGENCIES. If further information is required, Austin International should be consulted. In no event will Austin International be responsible to the user in contract, in tort (including negligence), strict liability or otherwise for any special, indirect, incidental, or consequential damage or loss whatsoever; or claims against the user by its customers resulting from use of information, recommendations, descriptions, or safety notations. 7 Ross Cannon Street York, SC 29745

Phone: 803-628-0035

Fax: 803-628-7544

www.austininc.com

You might also like