You are on page 1of 2

IA Production Portfolio: timeline and checklist version 2 (rev. 10 Feb.

2013)
Group # Name Production name

Role Director Writer Cinematographer Sound Designer, Recordist, Mixer Editor

Student

Due dates in bold Date Thu. Nov. 8 2012 Fri. Nov. 9 Wed. Dec. 12 Tue. Jan. 8 2013 Tue. Jan. 15 Fri. Jan. 18 Thu. Jan. 24 Tue. Feb. 5 Fri. Feb. 8 Tue. Feb. 11 Items Due Mark band and exemplars discussion/reection Reading of exemplar commentaries Brainstorming session and formation of groups/ roles Script drafts due Consultation on scripts and revision time Five brainstorming journals with graphical evidence due Planning and work period Planning and work period Planning and work period All primary shooting should be nished Assemblages created Done

IA Production Portfolio: timeline and checklist version 2 (rev. 10 Feb. 2013)


Date Thu. Feb. 14 Items Due Show rough cuts in class (version one) (T3s participate) re-shoots and pick-ups begin planning and editing trailer additional editing (if possible) Tue. Feb. 26 rst draft of commentary (on paper) (based on journals with graphical evidence: your own drawings and production stills) Hand in storyboard/comic/etc. for trailer Show rough cuts in class (version two) (T3s participate) Film rationale draft Thu. Feb. 28 Trailer rough cut (version one) due for screening (T3s participate) Trailer rationale draft Wed. Mar. 6 nal cut nal rationale for lm second draft of commentary (on paper) Mon. Mar. 11 nal trailer nal rationale for trailer Wed. Mar. 13 Fri. Mar. 15 full commentary nished Full package put together incl. cover sheets and DVDs (burning session)* Done

BREAK: Fri. Feb. 15Sun. Feb. 24

*(Every lm should be preceded by a production slate (a black screen with white lettering) stating the candidates session number, the school and school code, the title of the lm and the candidates designated role. Schools must check that all DVDs can be played on standard equipment (DVDs should be non-regional) and not through a PC only.

You might also like