NOTE:MINIMUM CEMENT CONSUMPTION SHOULD BE AS PER THE CHART PROVIDED FOR THE TENDER NAMED " CIVIL WORKS

AT LONI TERMINAL" FOR ALL THE JOBS INCLUDING CIVIL BUILDING STRUCTURES, RCC DRIVE WAY, DYKEWALL, FIRE BREAK WALL ETC COMPLETE.

CEMENT CONSUMPTION FOR CONCRETE GRADES NOTE : 30 Bags / CuM SR.NO. DESCRIPTION NO. OF CEMENT BAGS 1 M10 ( 1:3:6 ) 2 M15 (1:2:4 ) 3 M20 (1:1.5:3 ) 4 M25 (1:1:2 ) 5 PCC M10 (1:3:6 ) & (1:4:8 ) 4.4 4.8 5.5 7.5 3 2.3

CEMENT CONSUMPTION FOR CEMENT MORTAR NOTE : 30 Bags / CuM SR.NO. DESCRIPTION NO. OF CEMENT BAGS 1 (1:4) 2 (1:5) 3 (1:6) 6 5 4.3

CEMENT CONSUMPTION FOR PLASTER NOTE : 30 Bags / CuM SR.NO. DESCRIPTION NO. OF CEMENT BAGS 1 20 MM THICK (1:4 ) 2 12 MM THICK (1:4) 18 10.8

CEMENT CONSUMPTION FOR BRICK WORK / CuM NOTE : 30 Bags / CuM SR.NO. DESCRIPTION NO. OF CEMENT BAGS 1 ( 1:3 ) 2 (1:4 ) 3 (1:5 ) 4 (1:6 ) 2.5 2 1.65 1.4

ACTUAL CEMENT CONTENT REQUIRED MAY VARY AS PER APPROVED MIX DESIGN BUT MINIMUM CONSUMPTION SHALL BE AS PER THE CHART.