The comparison of the methods of reinforced concrete


structures
LI ping ,WANG Jia-Lin
School of Civil Engineering & Architecture, ChongQing Jiaotong University, ChongQing 400074, China

Abstract The embedded element and the non-nodal FEM were introduced to used to simulate
the reinforced concrete structures in the paper. The concepts and features of two methods of
building models ate discussed. The advantages and disadvantages of the methods were expounded
through the three examples. Some useful conclusions were drawn by the comparison of two
methods.
Key words: finite element method; building model; reinforced structure; non-nodal connection;
ABAQU

[1]

[2 -6]

[2]

[6][3]

2009-06-
(1980-) CAE
E-mailhefeiliping@yahoo.com.cn 023-62650595

ABAQUS
embedded element [7]
[8]MPC

ABAQUS

2
ABAQUS

ABAQUS

ABAQUS

1.
Fig.1 Elements lie embedded in host elements

ABAQUS

3 AB ; 1
a-h ; 2 e-l 3
12
A 1
A abcdefgh
B 2
B acdefg h

ABAQUS

ABAQUS
ABAQUSInstance
Create
constraintEmbedded region


RCF

ABAQUS ABAQUS
2


ABAQUS embedded element

1.0036

1.0052

1.0026

Embedded

1.00124
1.0012

1.

0.94

0.78

1.04

1.17%
1.17%

0.38158
0.37951
0.37937
0.38025
0.3801

0.09

0.46

0.49

0.26%
0.30%

-5.2868

0.11

-5.2824

0.02

-5.2838

0.05

-5.2803
-5.2801

0.017%
0.02%

[6]
3m0.4m0.2m,
33Gpa25000N/m3
700Mpa 210Gpa
Ay140mm22

2
3

1000-1000
Ec=3109, 0.3 Es=21011
0.3 0.01 ABAQUS
56*21
ABAQUS
41264 RCF
4 ABAQUS
16863 128

Fig.2 Prestressed concrete beam with rectangular section

ABAQUS embeddedRCF

[6]
606
520
100
=110-5

T =

E 333.3

345.04oC,700.002MPa
ABAQUSembedded

1
Tab.1 The calculation results of the middle

3
Fig.3 The beam embedded in the planar

ABAQUS
RCF 4
ABAQUS

4
4 ABAQUS
12
64
RCF
4

section

/mm
1.0131
1.0036

0.94

/Mpa
0.38125
0.38158

0.09

/
Mpa
-5.2812
-5.2868

0.11

T =

4.
Fig.4 The figure of the end of the plate

5[9]20m
0.9m0.2m 0.02m

0.35m1125KN
11.25KN/m
2.0104MPa 0.2
2.0104MPa

o
E 17904.9 C

17964.8 oC 1125.001KN

1127.7KN

2
[9]

RCF
6

2 (:MPa)
Tab.2 The results of the middle section (MPa)

[4]
-12.5
0.0

-12.4825
-0.0426

6 RCF
5

Fig.6 Stresses in concrete beam

Fig.5 Curve unbonded pre-stressed beam

804
8 100

x

1e-5

ABAQUS
embedded

embedded

RCF

[1] ,,.[M].

2005.

Engineering.2007.32(4)178-179

JIANG jian-jing, LU Xin-zheng, YE Lie-ping, Finite element

[6] ,,.

analysis of concrete structures [M]. Beijing: Tsinghua

[J]..200417(1)

University Press, 2005.(in Chinese)

ZHAO Man, WANG Xin-min, GAO Jing. FEM Numerical

[2] ,,.ANSYS

Analysis of prestressed conctere structure[J].Journal of

..2006.32(21). 363-364

shijiazhuang ralway nstitute.2004.17(1).84-88

YU Xiao-guang,KONG Fan-wei MU Zhuo-hui.Realize and

[7] Abaqus Analysis Users Manual, Constraints,Chapter

test comparing of prestressing force steel in ANSYS

29.Constraints .Section29.4Embedded elements

software.SHANXI ARCHITECTURE.2006.32(21).363-364

[8] .[D].

[3] ,,.

.2008

Ansys..2008.22(6)784-785

WANG Jia-lin. Theory of Non-nodal finite element methods

FU Yong-Qiang.ZHANG Xiao-Shui.HU Cheng.Prestressed

and its realization in software[D]. Ph.D theisis. Chongqing:

concrete structure imposed by the Ansys simulation of .

Chongqing University, 2008.(in Chinese)

prestressed.CONGCHENGSHIJI.2008. 22(6)784-785

[9] .[M].

[4] ,.

. 2000

[J].. 2008.30(1)30-33

LI Guo-ping. The design principles of pre-stressed concrete

XIONG Hui-xia, ZHANG Lei. Nonlinear finite element

structures[M].

modeling

2000:149-152 (in Chinese)

analysis

of

external

prestressed

concrete

Beijing:

China

communications

beam[J].Wuhan Inst,Tech.2008.30(1). 30-33


[5] .ANSYS
..2007,32(4).177-183
Li Lu,QIAN Jiazhang,LI Dun.Numerical simulation of
prestressed reinforcing steel bar based on ANSYS[J].Highway

Press,

You might also like