ed work orders for UUMU Turn Around Time Date Release 1 662.00 05/06/2009 2 601.00 07/06/2009 3 475.

00 11/09/2009 4 463.00 11/21/2009 5 448.00 12/06/2009 6 377.00 02/15/2010 7 337.00 03/27/2010 8 326.00 04/07/2010 9 291.00 05/12/2010 10 284.00 05/19/2010 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 244.00 243.00 242.00 221.00 204.00 203.00 193.00 193.00 193.00 190.00 190.00 179.00 179.00 159.00 159.00 154.00 144.00 141.00 134.00 134.00 132.00 132.00 132.00 131.00 130.00 130.00

Order 10576428 10586892 10615844 10618493 10619523 10632059 10647107 10650416 10657992 10660310

Main WorkCtr Reference Field 2nd DU5 JOB COMPLETED DU5 JOB COMPLETED DU5 DU5 DU5 DU5 F/H REPLACEMENT PROG DU5 DU5 DU5 JOB COMPLETED DU5 F/H REPLACEMENT PROG JOB COMPLETED F/H REPLACEMENT PROG JOB IN PROGRESS JOB COMPLETED2.17.11 JOB COMPLETED2.12.11 JOB ON PROGRESS

Functional loc. DHT-FP-FE5-OYARD-HD1 DWO-SB-LC6-DHARN-BLDGS 3091 258-SB-LC0-DHLC0-2290 DHF-ESP-7002 X74-CA-SJ0-10908-FAC01DHA DHF-SUB-LABS DHP-UGO-FRHD DHM-554 DHT-FP-FC3-OYARD DHP-UGO DHF-DMC-DINE-0101F DHF-DHH-2291 DHF-DRC DHF-DRC DHF-DRC DHT-FP-FC3-OYARD DHH-DMC

Short text Rep./Rpl. two Fire Hydrant@Fire Trng check/repair Fire Hydrants@B#3091 RPL 6" Fire Hydrant@Dh.SA Gasoline Stn. Replace Fire Hydrant 1111 @East P# 7002 Rpr 6" RW line/Rpl 6" Fire Hydra@B#3000 DHA BLDG 3199 & MASTORAH OFFICE Replace defective (3) Fire Hydrants # 22 check and repair fire hydrant # 309 Mod. V/B inside & outside (Fire Trng. Ce NEAR H-6229 TERRA COURT-F/H REPLACEMENT RelocateF/H from inside@Al-Munirah D.Hal R&D-Replacement of 6" G/V Rpl old fire hydrants with new at LOT26 AR-RABIYAH LOT # 1-Rep. of I-beam and co Ar-rabiyah Lot # 75-Fire Hydrant replace Modify valve boxes inside and outside. AL-MUNIRAH NEAR BLDG# 129 (V/B#0683)-Exc

06/28/2010 10633496 DU5 06/29/2010 10668970 DU5 06/30/2010 10627779 DU5 07/21/2010 08/07/2010 08/08/2010 08/18/2010 10674404 10677073 10678588 10676636 DU5 DU5 DU5 DU5

Saudi oger unit supervisor Remarks Completed;Waiting for GSO to be charged Completed;Waiting for GSO to be charged Completed;Waiting for GSO to be charged Completed;Waiting for GSO to be charged Completed;Waiting for GSO to be charged Completed;Waiting for GSO to be charged Completed;Waiting for GSO to be charged Completed;Waiting for GSO to be charged Completed ;for proponent signature Completed;Waiting for GSO to be charged clarify if the F/H included in Phase II or III replacement program by Rezayat COMPLETED 2/19/11 for proponent signature Completed;Waiting for GSO to be charged 20% CMPLTD 12/05/10 ( ETC: PM WK # 10 . ) WAITING FOR ROAD CLOSURE Completed;Waiting for GSO to be charged Completed ;for proponent signature
32%COMPLETED 2/28/11 Still in progress

93% CMPLETD 03-01-11 Still in progress PM WK ( 8 ) 08/18/2010 10678720 DU5 08/18/2010 10679336 DU5 08/21/2010 10680994 DU5 08/21/2010 10681005 DU5 09/01/2010 10683507 DU5 09/01/2010 10683509 DU5 09/21/2010 10686059 DU5 09/21/2010 10686060 DU5 09/26/2010 10/06/2010 10/09/2010 10/16/2010 10/16/2010 10687163 10683510 10689814 10691610 10691612 DU5 DU5 DU5 DU5 DU5 DHH-DMC Run New 2-IC # 14 to VB-1158 DHP-ROP-DOBP-WAWEL-WW809 install flow meter for ww#809 DHP-UGO DHP-UGO DHP-UGO DHP-UGO DHP-UGO DHP-UGO DHP-UGO DHP-UGO DHF-CRA-0729 DHP-UGO DHP-UGO DHP-UGO Rpl G/V 6"inside V/B # 401@Kings Rd#1615 Rpl gate valve 6" & 4"@ K- 109. Install 1 unit new 16# ElectFM@Zone I Modify V/B#1731@ Oasis Ave Install electomagnetic FM@VB 0644 Install electomagnetic FM@VB 0520 Install electomagnetic FM@VB 0658, B-111 construct Type1 VB @West Park Bldg#2201 Investigate And Repair Water Pipe Leaks Rpl4" F/M insideV/B#0300@old community Rpl4" F/M insideV/B#0683@Al Munirah #129 Run electric cable for FM@ Mujama Bldg 50% COMPTD. 03-02-11 WAITING FOR MATERIALS PM WK ( 8 ) GSOC/SAUDI OGER / JOB COMPLETED ) Completed ;for proponent signature FOR SCHEDULING PM WK (10 ) Electromagnetic Flow Meter is ordered.ETA: 03/15/2011. GSOC Copmleted 10% COMPTD 12/27/10 Still in progress PM WK ( 8 ) for scheduling PM WK ( 8 ) Waiting for materials.ETC: 03/15/2011 BY ARAMCO Completed 02-27-2011;for proponent signature Electromagnetic Flow Meter is ordered.ETA: 03/15/2011. ARAMCO Electromagnetic Flow Meter is ordered.ETA: 03/15/2011. ARAMCO 55% COMPTD. 2/19/11 WAITING FOR MATERIALS PM WK ( 8 ) Completed ;for proponent signature 10%Completed 03-02-11 / Stillin progress ETC: PM WK # 10. GSOC/SAUDI OGER / FOR JOB SCHEDULING PM WK ( 8 )

JOB ON PROGRESS FOR JOB SCHEDULING EMFM FROM ARAMCO JOB ON PROGRESS WAITING FOR MATERIAL WAITING FOR MATERIAL JOB ON PROGRESS JOB COMPLETED JOB FOR SCHEDULING JOB FOR SCHEDULING IN PROGRESS FOR JOB SCHEDULING JOB ON PROGRESS PROPONENT SIGNATURE COMPLETED 2.18.11 JOB IN PROGRESS EMFM FROM ARAMCO

10/18/2010 10689294 DU5 10/18/2010 10/18/2010 10/19/2010 10/20/2010 10689295 10691613 10685678 10689296 DU5 DU5 DU5 DU5

DHP-UGO Run electric cable for FM@ West Park DHP-ACP-ACP5-B5ABC-CHILLER 5B Replace/Repair water Leak on 5B outlet c DHP-RWP-ZON1-WAWEL-WELL862replace 12"corrosion RW line of WW#862 DHP-UGO Run electric cable for FM@Substation#40 DHP-UGO Install16"electomagnetic FM V/B#0567@DHC

10/20/2010 10692992 DU5

37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81 82

105.00 92.00 75.00 68.00 67.00 63.00 55.00 54.00 50.00 50.00 49.00 49.00 49.00 47.00 47.00 34.00 25.00 25.00 25.00 20.00 18.00 18.00 18.00 14.00 13.00 12.00 11.00 8.00 8.00 8.00 8.00 5.00 5.00 5.00 5.00 5.00 4.00 4.00 4.00 4.00 4.00 4.00 0.00 0.00 0.00 0.00

11/14/2010 11/27/2010 12/14/2010 12/21/2010

10698996 10700740 10705476 10707060

DU5 DU5 DU5 DU5

ALASCO WUR/TUR ALASCO WUR/TUR IN PROGRESS

DHF-DHC-RECR-4157F provide 35ton crane & extend foundations DHP-ACP-ACP1 Replace 3"U/G steel Raw W. line at AC#1. DHP-STP-0494-INFLA-SAMPLEROOM Exca/rep.6"U/G broken PVC Irr.line@NWTP DHP-LST-RSP4-WTWEL Ins.pres.gauge for all three bypass pump DHF-DHC-RECR-4157F Provide 35ton crane & extend foundations

12/22/2010 10707439 DU5 12/26/2010 01/03/2011 01/04/2011 01/08/2011 01/08/2011 01/09/2011 01/09/2011 01/09/2011 01/11/2011 01/11/2011 01/24/2011 02/02/2011 02/02/2011 02/02/2011 02/07/2011 02/09/2011 02/09/2011 02/09/2011 02/13/2011 02/14/2011 02/15/2011 02/16/2011 02/19/2011 02/19/2011 02/19/2011 02/19/2011 02/22/2011 02/22/2011 02/22/2011 02/22/2011 02/22/2011 02/23/2011 02/23/2011 02/23/2011 02/23/2011 02/23/2011 02/23/2011 10708158 10708156 10710099 10711150 10711257 10711328 10711329 10711337 10712005 10712462 10713008 10717791 10717792 10717793 10718592 10718158 10718633 10718635 10719983 10720202 10719358 10720650 10717925 10720239 10721238 10721241 10722222 10722258 10722482 10722511 10722532 10722494 10722991 10723151 10723156 10723161 10723165 10710857 10720024 10721237 10723149 DU5 DU5 DU5 DU5 DU5 DU5 DU5 DU5 DU5 DU5 DU5 DU5 DU5 DU5 DU5 DU5 DU5 DU5 DU5 DU5 DU5 DU5 DU5 DU5 DU5 DU5 DU5 DU5 DU5 DU5 DU5 DU5 DU5 DU5 DU5 DU5 DU5 DU5 DU5 DU5 DU5 ALASCO WUR/TUR ALASCO WUR/TUR JOB FOR INSPECTION REPAIR COMPLETED JOB COMPLETED FABT'N. JOB FOR SCHED JOB COMPLETED 44%COMPLETED 2/13/11 PIPING WORKS JOB COMPLETED JOB COMPLETED JOB COMPLETED JOB COMPLETED JOB COMPLETED2/7/11 JOB COMPLETED2.13.11 JOB COMPLETED FOR SCHEDULING JOB COMPLETED JOB COMPLETED FOR SCHEDULING 25%COMPLETED 2/19/11 REPAIR COMPLETED FOR SCHEDULING COMPLETED 2.17.11 IN PROGRESS FOR SCHEDULING IN PROGRESS IN PROGRESS FOR SCHEDULING IN PROGRESS IN PROGRESS IN PROGRESS FOR SCHEDULING FOR SCHEDULING FOR SCHEDULING FOR SCHEDULING REPAIR COMPLETED FOR SCHEDULING FOR SCHEDULING JOB COMPLETED

DHP-LST-RSP2 Check/repair pump B'' base@RSPS#2 DHF-DAR-N038 remove the sip tick tank at the exhibit DHM-554 Construct temporary walkway out of bldg DHF-LIP-3108 Repairing Underground Leak/LIP DHP-STP-0494-DISPA-WWSSFIELDBRep/repl leaking raiser pipe Zone#5 C7 DHP-STP-0494 Fabricate/Install ladder inside valvebox DHM-554 Excavate /replace defective 2" & 3" gate DHP-STP-0494-DISPA-WWSSFIELDBReplace the broken sprinkler@Zone#3B7 DHP-UGO expose U/G leaking8" T/W@AL-HASA#207G DHF-CRA-175N Expose And Repair The Leak Of 6" Dia. Un DHP-UGO Valve Box Modification@Near House # 4269 DHP-BCH Repaint the Steel Plate base of B/P & Mo DHP-BCH-BST1-PUMST Replace Corroded/ Loose thread stuffing DHP-BCH-BST2-SHYRM Replace busted F-lamps and ballast at Sw DHP-ACP-ACP5-CTWRS-CELL5A Repair underground Cooling towers 2" mak DHF-CAS-1780 Repair the U/G water leak near B-1780,DH DHP-ACP-ACP7-CTWRS Repair water leak @ACP #7 DHP-UGO Lower manhole cover@ Bldg # 1451 DHF-CAS-1965 Check/Replace Raw Water Gate Valves DHP-ACP-ACP1-BL1CD expose and repair U/G@ACP1 DHF-CAS-1758 Installation for garden valve@Bldg #1758 DHM-B61 Repaint the valve box@Bldg # 61 & 60 DHF-ESP Raw Water Leak / East Park@Gate # 21 DHF-DHC-RECR-4151B replace damaged 8"gate valve@4151 DHP-ACP-ACP7-ACBLG repair U/G water leak @ ACP # 7 DHM-554 Fabricate steel plate covers out of bldg DHP-UGO Repair 8# R/W clay valve insideVB # 0833 DHP-UGO Replacement 4" & 6" G/V @ Near Gate # 5 DHF-DHN-1451 Modify damage manhole near bldg. 1451 DHP-UGO Replace F/H 739 @ Jawan Court House#588 DHP-UGO Repair water leak R/W@Security gate # 2 DHM-054 fabricate frame for valve box out of B54 DHP-UGO Repair water leak R/W@ Ibis ave.# 622, DHP-STP-0494-IRCRM Rep/repl.leaking raiser pipe @NWTP DHM-050 Replaced damaged steel valves box covers DHM-552 Replaced damaged steel valves box covers DHM-B60 Replaced damaged steel valves box co DHH-DOC-1814 Repair R/W leak under sidewalk@B-1814 DHF-DRC Repair/repaint rusty RW main valve LOT42 DHP-DWP-TANK-420TA EXC / REPU/G WATER LEAK R.O PLANT DHF-OAR-2930 Repr/Replace leaking ball valve 2 " RWL

ALASCO ;GSOC/WUR/TUR .Job is completed just waiting for Contractor to receive his payment. In progress by ELASCO; GSOC Completed 02-28-2011 ;for proponent signature for backfilling ETC Feb. 27, 2011 ALASCO WUR/TUR .Job is completed just waiting for Contractor to receive his payment. ALASCO; GSOC /WUR/TUR .Job is completed just waiting for Contractor to receive his payment. ALASCO WUR/TUR; job is in progress by GSOC. FOR INSPECTION Completed ;for proponent signature Completed 03-01-2011 ;for proponent signature JOB FOR SCHED ( PM Week No. 10) JOB FOR SCHED ( PM Week No. 8) Completed ;for proponent signature Completed ;for proponent signature (RPO) completed Completed ;for proponent signature JOB COMPLETED BY DOHA JOB COMPLETED BY DOHA JOB COMPLETED BY DOHA Completed ;for proponent signature Completed ;for proponent signature Completed ;for proponent signature for scheduling PM WK ( 12 ) same job item no. 83 Completed ;for proponent signature Completed ;for proponent signature FOR SCHEDULING Completed 02-26-11;for proponent signature for asphalting FOR SCHEDULING Completed ;for proponent signature Completed ;for proponent signature 40%COMPLETED03-2-11 57 % COMPLET 2.27.11 26%COMPLETED 3/02/11 20%COMPLETED 3/01/11 Completed ;for proponent signature completed 90 % COMPLET 2.26.11 FOR SCHEDULING FOR SCHEDULING FOR SCHEDULING FOR SCHEDULING Completed ;for proponent signature RPO FOR SCHEDULING FOR SCHEDULING Completed ;for proponent signature

83 84 85 86 87 88

0.00 0.00 0.00 0.00 0.00 0.00

10723153 10723167 10723174 10723963 10724567 10724569

DU5 DU5 DU5 DU5 DU5 DU5

FOR SCHEDULING FOR SCHEDULING FOR SCHEDULING JOB COMPLETED JOB COMPLETED REPAIR COMPLETED

DHH-DDC DHM-B60 DHF-CRA-175N DHP-UGO DHF-NTP-3302 DHF-DHN-9110

Remove existing safety guard & provide Fabricate steel plate covers out of bldg Replace corroded 4" raw water and 2" swe REPAIR BROKEN OF VALVE BOX@H-619 Repair Minor leak inside Valve Box # 19 Repr. U.G. water leak near gate # 24 DHN

FOR SCHEDULING FOR SCHEDULING FOR SCHEDULING Completed ;for proponent signature Completed ;for proponent signature FOR ASPHALTING

1 2 3 4

232.00 74.00 0.00 0.00

07/10/2010 10671874 DWS 12/15/2010 10705586 DWS 10645069 DWS_LA 10647536 DWS_LA

DHP-LST-RSP4-WTWEL DHP-STP-0494-DRYBD DHP-UGO-SWLN DHP-UGO

Provide Vacuum tanker for RSPS#4 Clean Sludge from D.Beds(1624)@NWTP pumping out and cleaning the septic tank pumping out and cleaning the sludge oil

NOT BELONG TO UUMU NOT BELONG TO UUMU NOT BELONG TO UUMU NOT BELONG TO UUMU

Turn Around Time Date Order Release Main WorkCtr Reference Field 2nd 376.00 02/16/2010 50038990 DU5

Functional loc. DHP-UGO-FRHD

Short text Rpl(26) corroded F/ Hs @CS Facilities

GSOC / JOB COMPLETED - Waiting for GSOC

SUMMARY IN PROGRESS # 39 MATERIALS FROM ARAMCO # 4 FOR ALSCO # 5 FOR GSOC # 14 PROPONENT SIGNATURE # 27 NOT BELONG TO UUMU # 4 TOTAL WORK ORDERS # 93

Opened Notifications -- UUMU ##### Notification Main WorkCtr Notif.date Functional loc. 1 118 10598044 DU5 11/01/2010 DHF-CAS-D280 2 113 10603384 DU5 11/06/2010 DHF-WSP-2201 3 112 10603716 4 105 10605003 6 84 10608426 7 84 10608547 9 60 10614132 10 53 10616014 11 49 10616601 12 47 10617379 13 28 10622605 14 15 10625325 15 4 10628592 16 4 10628687 DU5 DU5 DU5 DU5 DU5 DU5 DU5 DU5 DU5 DU5 DU5 DU5 11/07/2010 11/14/2010 12/05/2010 12/05/2010 12/29/2010 01/05/2011 01/09/2011 01/11/2011 01/30/2011 02/12/2011 02/23/2011 02/23/2011

Description REPLACE ALL DEFECTIVE EMER EYEWASHES Replace Corroded Metal Sheet Covers-2201

DHF-CRA-0729 carry-out repair of damaged valve box DHH-DMC Rectify Utility Box in-front of Bldg.131 DHH-DEX-KHOB-JUMA2-ROPLANT WATER LEAK ON AIR TANK OF RAW WAT REPAIR DHF-DAR-N038 install new water suply for the irrigati DHF-CRA-0730 Repair or replace corroded fire hydrant DHH-DOC-ELMC-05128 Rplace/repair 4 inch main pipe line 178-FP-FE5-SHOPS REPLACE ALL FIRE HYDRANTS AT DSD B-550 DHM-554 Fabricate platform for A/C in bldg 554, DHP-UGO re-route 1" D/W lateral line for hse#831 DHP-STP-0494-DISPA-PERCLAFLD /install flaunge all valve box Provide DHF-CAS-1990 CHECK,REPLACE DEFECTIVE MANHOLE COVER DHH-DDC Paint all manholes, fire hydrants, valv

User statusSaudi oger unit supervisor Remarks APPR WAITING FOR REJECTED BY PROPONENT APPR FOR INSPECTION We need provide Specific clarification details with locations. APPR APPR FOR INSPECTION CRTD WAITING FOR REJECTED BY PROPONENT APPR FOR GSOC APPR FOR INSEPCTION APPR FOR GSOC APPR FOR INSEPCTION APPR ABWF WAITING FOR REJECTED BY PROPONENT APPR ABWF COMPLETED / UNDER RPO JOB APPR WAITING ARAMCO FOR APPROVAL APPR FOR INSEPCTION APPR FOR INSEPCTION

SUMMARY FOR INSEPCTION # 7 FOR GSOC # 2 UNDER RPO # 1 WAITING ARAMCO FOR APPROVAL # 1 WAITING FOR REJECTED BY PROPONENT # 3 TOTAL NOTIFICATIONS # 14