Professional Documents
Culture Documents
300MW机组DEH系统说明书 (ovation)
300MW机组DEH系统说明书 (ovation)
13-3-14
1/13
300MW DEH
DEH OVATION
100MB
1 DEH
(DEH)
DCS
13-3-14
300MW DEH
2/13
1
11
CUSTOM GRAPHIC
PROGRAMS OPERATOR
STATION
1.1
1.1.1
1.1.2 DEH
300MW DEH
13-3-14
3/13
1.1.3
HOLD
GO
1.1.4
MEGAWATT LOOP IN
MEGAWATT LOOP OUT
1.1.5
THROTTLE
VALVE GOVERNER
VALVEINTERCEPT VALVE
TVGV XFER IN PROGRESS
VALVE TEST IN PROCESS
/
1.1.7
1.1.8
1.1.9
13-3-14
300MW DEH
4/13
RUNBACK
RUNBACK IN PROGRESS
103%
PROTECTION SYS
OPER
2
2.1
a CONTROL MODE
b BYPASS MODE
c CONTROL SETPOINT
e LOOP MODE
f VALVE MODE
g LIMITER
2.2
IN SERVICE
DUT SERVICE
1 OPER AUTO
OPER AUTO
OPER AUTO DEH
b
/
13-3-14
300MW DEH
5/13
c
d
e
OPER AUTO
ATC
2ATC
ATC
ATC
ATC
3REMOTE
REMOTE DEH TARGET SETPOINT
a
b
c
d
e
REMOTE TARGET
RATE
TURBINE MANUAL
OPER AUTO
13-3-14
300MW DEH
6/13
4AUTO SYNC
AUTO SYNC
a ATC
b
c
d
e
AUTO SYNC
AUTO SYNC
OPER AUTO
5MANUAL SYNC
RAISE LOWER
2.3
BYPASS
INTERFACE
IN SERVICE
DUT
SERVICE
1
BYPASS OFF
13-3-14
300MW DEH
7/13
IV
2
BYPASS ON
IV 35%--40%
1
2
3 ENTER
43
ENTER
6ENTER
13-3-14
300MW DEH
8/13
HOLD
76
8
RATE
9 RATE ENTER
RATE
10ENTER45
11GO
GO
HOLD
12 SETPOINT HOLD GO
GO
HOLD
400MW/min 800rpm/min
3450rpm, 325MW
INUVL ID ENTRY
13-3-14
300MW DEH
9/13
14
HOLD
HOLD HOLD
HOLD
ATC
ATC ATC
2.5
IN DUT
MW
SETPOIUT
HOLD
300MW DEH
13-3-14
10/13
IMP MW
MW TARGET
IMP MW
MW TARGET
/
1
TV-GV
XFER
IN
PROGRESSTV/GV
2.8
1VPLVPL
13-3-14
300MW DEH
11/13
VPL
VALVE POSITION IN
OUT IN 100%
2
HLLHLL
HIGH LOAD
ENTER
HIGH LOAD
IN OUT
IN
HLL HLL
GO
HLL 120%
13-3-14
300MW DEH
12/13
A
a DEH
b
c
d
B TPL
C TPL
20%
TPL
STATUS LMT
2.9
()
1
60%
TV1
TV1 VALVE TEST
TEST TV1
GV1 GV3
GV2GV4
GV1 GV3
2 TV1
13-3-14
300MW DEH
13/13