You are on page 1of 3

,s|\ c|\ \ ,

Faculty Of Engineering
Department of Electronics & Electrical Communications
Electronics Course Project [Part 3 : Digital Sequential]
15 August 2010 [Abdelrhman Abotaleb]

Pr oject Explanat ion Session : 16 A ugust 15, 2010

Count er s A pplicat ions:
Pat t er n Gener at or s

Count er St at e Diagr am:
modulus-m count er [ Count er wit h m st at es]



A synchr onous Count er [ Ripple Count er ]
A dvant ages : Simple in design
Disadvant ages : Set t ling t ime in t he wor st case=n*Tpr opagat ion

Synchr onous Count er :
A dvant ages: Set t ling is f ast
Disadvant ages: Design is mor e complex.


Digit al Clock Pr oject :
1- Seconds Count er s
[ Two BCD(Decade) Count er s t o count f r om 00 t ill 59]
The f ir st count er must be BCD r ipple count er implement ed
using JK f lip f lops.
The second count er must be BCD synchr onous count er
implement ed using JK f lip f lops.

The t wo seven segment s must be common anode.
The f ir st seven segment decoder should be implement ed using
combinat ional logic gat es [ A ND,OR] A f t er simplif ying t he
decoder f unct ion t able using k-map.
The Second seven segment decoder could be a single I C 7447


2- Minut es Count er
Two BCD count er s t o count f r om 00 t ill 59
Bot h must be a single Count er I C [ 74L S90]

The t wo seven segment s must be common anode wit h t heir
BCD t o 7-segment decoder implement ed as an I C.




Di gi t al Cl ock Pr oj ect Gr adi ng Pol i cy:

Ful l Wor king Cir cuit . [ 100/ 300]
Ful l Wor king Simulat ion. [ 50/ 300]
Discussion + Pr esent at ion. [ 50/ 300]
Pr oject Repor t . [ 50/ 300]
Cr eat i ve Solut ions & Innovat i ve Ideas [ 100/ 300]

The pr oject r eport should cont ain:
1-The f ull cir cuit schemat ic
2-The f ull cir cuit design [ On t he abst r act ed level : as t he syst em
over all] and each block you designed.
3-Pr oblems you f aced in t he proj ect .
4-Simulat ion Result s.
5-Camera shot s f r om t he wor king pr oject .
6-A ny addit ions ar e welcomed.

The pr oject pr esent at ion should be pr epar ed as a power point
slide show .

Cr eat i ve solut ions and innovat i ve ideas ar e consider ed onl y
when t he pr oject har dwar e and simulat ion is wor king well.
Hint:Stopwatch[Counterscouldbewithparallelloadtoadjustthe
timeandyoucoulddesignacircuitthatgivesanalarmatapre-
determinedtime.]

You might also like