Daily Report MOYA Bekasi for Water Treatment Using UF

TOTAL PRODUCTION STATUS


UF Feed Flow Daily Average Hour of Operation Total Production UF

Date: Time :

0 0:00 0

WATER QUALITY DAILY AVERAGE


Raw Water pH Turbidity Free Cl2 0.00 0.00 IPA BAJA 230 lps 0.00 0.00 UF 0.00 #DIV/0! Efficiency of Water Treatment (%)

TOTAL SALES STATUS


UF Water Meter Reading
Total Sales from

Start
5-Nov-12 (m3) UF Output Discharge

End

5-Nov-12 Untill 22-Dec-12

Total Sales

(m3)

(m3)

(m3)

10,930

(10,930)

GENERAL PARAMETER STATUS


Power consumption
Time/Date 00.00 - 24.00 Start KWH 0 End KWH 0 Consumption (KWH) 0 KWH / m3 #DIV/0!

Chemical Consumption IPA BAJA 230 LPS


Dosage (mg/l) PAC NaOCl 0.00

UF Consumption Chemical (kg)


0.00 HCl Dosage (mg/l)

Chemical

Chemical

NaOH

Soda Ash

REMARKS
UF sytem already operating

22-Dec-12 00.00 - 24.00

Unit l/sec Hour m3

Unit

NTU mg/l

Reading

22-Dec-12

(m3)

KWH / m3 #DIV/0!

UF Consumpti on Chemical (kg)

DAILY MONITORING LOGSHEET UF INSTALATION


PT.MOYA BEKASI JAYA IPA TEGAL GEDE
Tanggal : 22-Dec-12
UF A P. In P. Conc Flow Totalizer P. In (m3) P. Conc Flow Totalizer (m3) P. In P. Conc Flow Totalizer (m3) P. In P. Conc Flow Totalizer (m3) P. In P. Conc Flow Totalizer (m3) Flow Totalizer (m3) UF B UF C UF D UF E BY PASS

Feed Pump

Water Quality UF Out put TBD pH


In Put AMIAD Out let AMIAD

TOTAL

Jam

Flow
Out let UF (l/s) ISOLV

Totalizer (m3)

(%)

(Bar)

(l/s)

(Bar)

(l/s)

(Bar)

(l/s)

(Bar)

(l/s)

(Bar)

(l/s)

(l/s)

(NTU)

0:00 1:00 2:00 3:00 4:00 5:00 6:00 7:00 8:00 9:00 10:00 11:00 12:00 13:00 14:00 15:00 16:00 17:00 18:00 19:00 20:00 21:00 22:00 23:00 24.00

No 1 2 3 4 5

Jam Start Produksi

Jam Reservoir Over Flow/Stop Produksi

Lama Produksi (jam)

Remark Mengetahui : Shift I Shift II Shift III

Total production hour per day

Jumlah Produksi/jam

(m3)

15724.8

DAILY MONITORING LOG SHEET IPA BAJA 2 (Cap. 230 LPS) PT.MOYA BEKASI JAYA IPA TEGAL GEDE
Date :

IPA BAJA 2 (Capacity 230 LPS) RAW WATER Jam


TBD (NTU) pH (l/det)

Debit air baku

PAC
Konsentrasi (PPM) Inverter Dosing Pump 230 (Hz) Struk Pompa Dosing (%) Dosis (PPM) Chemical Usage (kg/hari)

WATER QUALITY
NaOCl (Natrium Hypho Chloride) Soda Ash BAK SUPERNATAN SEDIMENTASI TBD (NTU) Sludge Drainage (minute) BREAK TANK TBD (NTU) After AMIAD TBD (NTU) Struk Struk KonsenChemical KonsenChemical Pompa Dosis Pompa Dosis trasi Usage trasi Usage Dosing Dosing (PPM) (%) (PPM) (kg/hari) (PPM) (%) (PPM) (kg/hari) Hour of Operation

pH

pH

pH (Hour)

00.00 02.00 04.00 06.00 08.00 10.00 12.00 14.00 16.00 18.00 20.00 22.00 24.00 Total/Day Average

DAILY MONITORING LOG SHEET POWER UF SYSTEM


PT.MOYA BEKASI JAYA IPA TEGAL GEDE
Date : AMR UF JAM Jumlah Pemakaian/jam (KWh) Jumlah Pemakaian/jam (KVArh) AMR PLN Jumlah Pemakaian/jam (KWh) Jumlah Pemakaian/jam (KVArh)

E-Total (KWh)

Total (KVArh)

E-Total (KWh)

Total (KVArh)

00.00 01:00 02:00 03:00 04:00 05:00 06:00 07:00 08:00 09:00 10:00 11:00 12:00 13:00 14:00 15:00 16:00 17:00 18:00 19:00 20:00 21:00 22:00 23:00 24:00 Average Tot/Day

DAILY LOGSHEET RECORDING FLOW METER


PT.MOYA BEKASI JAYA IPA TEGAL GEDE
Date :
Raw Water Intake Kedasih Raw Water IPA BAJA 230 l/det Flow (l/s) Totalizer (m3) Raw Water IPA BAJA 125 l/det Flow (l/s) Totalizer (m3) Outlet IPA BAJA 125 l/det Flow (l/s) Totalizer (l) Flow (l/s) Kedasih (2) 60 LPS Totalizer (l) Outlet IPA BAJA 230 l/det Flow (l/s) Totalizer (m3) Flow (l/s) Distribusi R2 (Selatan) Totalizer (l)

Jam

Flow (l/s)

Totalizer (l)

00.00 01.00 02.00 03.00 04.00 05.00 06.00 07.00 08.00 09.00 10.00 11.00 12.00 13.00 14.00 15.00 16.00 17.00 18.00 19.00 20.00 21.00 22.00 23.00 24.00 Average Tot/Day : Shift 1 Shift 2 Shift 3

DAILY MONITORING LOG SHEET IPA BAJA 1 (Cap. 125 LPS) PT.MOYA BEKASI JAYA IPA TEGAL GEDE
Date :

IPA BAJA 1 (Capacity 125 LPS) RAW WATER Jam TBD (NTU) 00.00 02.00 04.00 06.00 08.00 10.00 12.00 14.01 16.00 18.00 20.00 22.00 24.00
Tot/Day Average

ALUM Debit Air Baku Konsentrasi (%) Struk Pompa Dosing (%) Dosis (PPM) Chemical Usage (kg/hari) Konsentrasi (%)

POLYMER Struk Pompa Dosing (%) Dosis (PPM) Chemical Usage (kg/hari)

WATER QUALITY Bak Supernatan Sedimentasi TBD (NTU) pH Sludge Drainage (detik) TBD (NTU)

Sand Filter pH Backwash (M )


3

pH (l/det)

DAILY MONITORING LOG SHEET IPA BAJA 1 (Cap. 125 LPS) PT.MOYA BEKASI JAYA IPA TEGAL GEDE

IPA BAJA 1 (Capacity 125 LPS) Hour of Operation (Hour)

DAILY MONITORING LOG SHEET POWER & DISTRIBUTION


PT.MOYA BEKASI JAYA IPA TEGAL GEDE
Date :
RESERVOAR UTARA (R-1) DISTRIBUSI Flow Meter (l/det) Totalizer (m )
3

RESERVOAR SELATAN (R-2)


CLEAN WATER QUALITY

JAM

LEVEL AIR
(m)

PRESSURE GAUGE
(BAR)

POST CHLORINASI - NaOCl Konsentrasi


(%)

DISTRIBUSI Flow Meter


(l/det)

Dosis
(ppm)

Chemical Usage
(kg/hari)

TBD
(NTU)

pH

Free Chlorine
(mg/l)

LEVEL

PRESSURE GAUGE
(BAR)

POST CHLORINASI - NaOCl Konsentrasi


(ppm)

CLEAN WATER
TBD (NTU)

Totalizer
(m )
3

Dosis
(ppm)

Chemical Usage (kg/hari)

pH

(m)

00.00 02.00 04.00 06.00 08.00 10.00 12.00 14.00 16.00 18.00 20.00 22.00 24.00 Tot/day Average

RING LOG SHEET POWER & DISTRIBUTION

MOYA BEKASI JAYA IPA TEGAL GEDE

RESERVOAR SELATAN (R-2) CLEAN WATER Free Chlorine


(mg/l)