Smartplant 3D Materials Handling: Taylor D. Cole Vice President, Intergraph Global Metals & Mining Industry
Smartplant 3D Materials Handling: Taylor D. Cole Vice President, Intergraph Global Metals & Mining Industry
Taylor D. Cole Vice President, Intergraph Global Metals & Mining Industry
Global Copper 2X
26 19 33 38
2007
2012
2017
2022
2007
2012
2017
2022
Global Aluminum 2X
54 35 44
66
2007
2012
2017
2022
2007
2015
Source: Rio Tinto May and July 2008. Million MT per annum demand forecast.
Supply
2008
Enablers:
Technology: Workflow: Leverage: Intergraph SmartPlant Enterprise Front-end Loaded and Rule Based Synergies with Other Industries
Benefits:
Accuracy: Optimise: Safety: Knowledge: Total Installed Schedule and Cost Layout, Pre-assembly, Design Stds Reviews: Hazop, Constructability, O&M Asset Lifecycle and Re-use
DigitalPlantProjectCost/ BreakevenCurve
Profit
Faster Startup
Traditional Startup
Reduced CapitalSpend
Faster Profitability
Time
Cost
over 80% of a projects total cost are committed within the first 20% of the total projects design time
4
PDS
Newer technology Faster design time improvement over Microstation
SmartPlant 3D
Latest technological advance Data base engineering Significant improvement over PDS in design time Improved integration between disciplines
Proof of Concept Project Background / Purpose / Status Problem industry demand and resource supply needs a step change solution Document centric (2D) project delivery compared to Process Industries Proof of Concept initiates the step change
Industry requirements specified Solution concepts established and tested Initiated solution configuration and development Concept proved - confidence to continue Pilot project for project readiness objective
Risk
Work-share Tracking Forecasting Integration
Cost
Optimisation Re-use Wastage Rework
Safety
Reviews Pre-assembly Simulation Education
n e r ur
Sc
o i r a en r o ey
& e l i f Pro
ta a D
ee h S
g n i aw r D n o i t a c i f i c
s t r a P &
t a C
e u g o l a
e p S
C n o i t u l o
v n o
t n e m e e s g n -u a e r r R A d n te a u e h u C g o l o a i t r a a C n e o t c S n t g i n s e e rr D u i C D 3 n o i t u l So
g n i aw r D
Risk
Work-share Tracking Forecasting Integration
Cost
Optimisation Re-use Wastage Rework
Safety
Reviews Pre-assembly Simulation Education
Operate
Build
Design
SmartPlant Foundation Operate Application Integration Engineering Data Handover Engineering Information Management Commission Build
Measurable Value
Expedited Commissioning & Startup (2-3% of TIC) - through expedited commissioning & start-up
resulting from as-built data validation, transformation & loading into operating systems
Minimized Plant As-Built Verification (1-2% of TIC annually) - through auditable plant asset
information management of change
Increased Turnaround Intervals (20% annually) Through application of reliability in design and
asset performance management principals
Pilot Project
Australia Q4 2008
BETA Version
Q1 / Q2 2009
Commercial Version
SmartPlant 3D v9 Release
Questions?
Taylor D. Cole Vice President, Intergraph Global Metals and Mining taylor.cole@intergraph.com