Homework No.1

From the problem above, we can define that : P = 100 Q = 1000 no = 10 np = 600 Solution (a). Qf = PQ = 10 x 1000 = 10.000 anually (product/year) Processing Operations(nof) = Qfnpno = 10000 (600) (10) = 600.000.000 operations (c). Total processing operation time(tp) = 600x106 (ops) x = 5.000.000 hour/year Total assembly operation time(ta) = 100(models)x1000(units) x 3(hour) = 300.000 hour/year Total time = tp + ta = 5.300.000 hour/year (c). In case of factory operates one shift (2000 hr/year); 1 worker/worksatation for procesing operation : n=w= = 2500 workstations

2 worker/worksatation for assembly operation : n = w/2 =

/ 2 = 75 workstations

Required floor space = 2500 + 75 = 2575 workstations (each workcell and workstation require 18 m2); Total area of floor space = 2575 x 18 = 46.350 m2

Homework No.2

From the problem above, we can define that : P = 100 Q = 1000 no = 10 np = 600 Solution