You are on page 1of 2

SR. NO.

1
2
3
4

DESCRIPTION

LENGTH WT (Kg)

ISA 50x50x6
ISMC 125
32 PIPE

17 M
28 M
52 M
7.2 M2
CHEKERED GRATING
TOTAL WEIGHT(Kg)
TOTAL WEIGHT (MT)

ERECTION COST/MT (Rs.)


MATERIAL COST/MT (Rs.)
TOTAL COST/MT (Rs.)
TOTAL COST

20,000
50,000
70,000

76.5
4.5
356 12.71429
328.3 6.313462
60 8.333333
820.8
0.8208

16416
41040
57,456

Bill of material (BOM) for Major approach platforms


S.No. Description

Date: 20/03/13

UOM

Quantity

Weight ( Kg)

ISMB 150

27

402.3

ISMC 150

28

459.2

ISMC 100

3.5

32.2

ISA 90x90x6

23

188.6

ISA 50x50x6

35

157.5

ISA 25x25x6

16

28.8

32 NB pipe for handrailing

130

820.3

Grating

22

187

Chaquer plate

M2

55

10

Toe guard ( height 110 mm)

45

112.5

Total Structure Weight (Kg) required for one Boiler

2443.4

Total Structure Weight (Kg) required for All Boilers

19547.2

Total Weight ( in MT)

19.55

Erection Cost ( Rs.)

Rs. 20000/MT

390944

Material Cost ( Rs.)

Rs.50000/MT

977360

Total Structural Cost ( Rs.) required for All Boilers

1368304

You might also like