You are on page 1of 2

Final Sheet

3BHK Other Carpentory Work Labour Bill - 16.10.2012


Sr No

Item

1 Living Room
Pelmet Work 1
Pelmet Work 1
Dummy TV
2 Master Bed Room
Bed
Farma Making For Master Bed Fabric
Pannelling 1 skill 1 mc
Bed Back Pannelling
Bed Back Arm
Wardrobe
Side Table
Mirror Back Panelling
Mirror Back Panelling
Toilet Mirror Back
Pelmet

4 Children Bed Room


Children Wardrobe
Mirror Back Panelling
Pelmet
Toilet Mirror Back Panelling
5 Balcony Duct

Qty In Sft Rate

NOS

12.5
26.5
4

1
1
3.33

2
1
2

25
26.5
26.64

60
60
125

5.5

6.5

35.75

6000
800
2695
2520
14218.75
3000
1837.5
2450
1408.75
690

LS

3 Guest Bed Room


Bed
Farma Making For Guest Bed Back
Mirror
Wardrobe
Dummy TV
Mirror Back Panelling
Mirror Back Panelling
Mirror Back Panelling
Pelmet
Toilet Mirror Back Panelling

Total
Amount

70
90
325

1500
1590
3330

5.5
2
2.5
1.33
3
4
5.75
11.5

7
7
8.75
1.33
8.75
8.75
3.5
1

1
2
2
2
1
1
1
1

38.5
28
43.75
3.5378
26.25
35
20.125
11.5

5.5

6.33

34.815

6000

70
70
70
60

LS
2.5
3
2
2.58
3.25
11.5
5.5

8.75
2.5
8.75
8.75
8.75
1
3.5

2
1
1
1
1
1
1

43.75
7.5
17.5
22.575
28.4375
11.5
19.25

300
150
70
70
70
60
70

800
13125
1125
1225
1580.25
1990.625
690
1347.5

5.5
1.5
10.33
5.58

8.75
8.75
1
3.5

1
1
1
1

48.125
13.125
10.33
19.53

300
70
60
70

14437.5
918.75
619.8
1367.1

6.25

13.25

82.8125

6 Fixing The Ply In 3 Kitchens Carcase Back=


Ls 1.5skill 1.5 mc

3 nos

70 5796.875
1200

Extra Panelling With Laminate Work


Above Door & Passage Area Inner &
7 Outer

Changes & Rework


1 Guest Bed Room Bed
Rework Due To Changes
Bed

144

5.5

6.33

70

34.815

Total Amount

10080

6000
110343.4

You might also like