Micro Compaction Summary
Micro Compaction Summary
Vibroflot
Process 1. Penetration water jetting 2. Reach desired penetration depth 3. Charging & compaction of backfilling materials 4. Completion of penetration and diameter cannot be clearly seen.
Vibrorod
1. 2. 3. 4.
Setting & Location Desired depth of penetration Extraction, supply materials & repenetration, Complete
as = Area replacement ratio As = Amount of charging material per unit length of sand pile S = Spacing of pile As = Cross sectional area of sand pile eo = initial void ratio of surrounding soil e1 = final void ratio after densification
1. 2. 3. 4.
Setting & Location Desired depth of penetration Extraction, supply materials through casing & re-penetration Complete
Square pattern = 1 + = 2 = (1 + ) = ( )