C-SCAN Corrosion Mapping Survey was carried out by using Phased Array Ultrasonic equipment at selected location of 71-3250-ADS 48 pipe line. LINE DESCRIPTION:
LINE NO. 71-3250-ADS 48 LINE FROM 71-V-102A/B LINE TO 71-ME-102 SERVICE Hydro carbon Operating Temp. 900C Operating Pressure ATMOS NWT (mm) 12.7 C.A. (mm) 6 C.W.T (mm) 5.11

DETAILS OF SCAN LOCATIONS: 1) Total 04 locations of 71-3250-ADS 48 were scanned. Total longitudinal running length is 30.0 meters at 4 Oclock to 8 Oclock circumferentially. 2) 03nos circumferential weld scanned was carried out by using Phased Array Ultrasonic equipment at this pipeline.

OBSERVATION: No Internal corrosion was observed at scanning area.


LOCATION NO. INSPECTION DATE C-SCAN REPORT NO Min Thick found mm 12.2 12.0 12.0 12.2 W/T LOSS (%) 3.93 5.51 5.51 3.93 REMARKS

01 04/02/2013 AD/HAB/13/022 02 05/02/2013 AD/HAB/13/023 03 06/02/2013 AD/HAB/13/024 04 06/02/2013 AD/HAB/13/025 PLEASE SEE C-SCAN DAILY REPORT FOR DETAILS. DISCUSSION: CONCLUSION:

No Internal corrosion No Internal corrosion No Internal corrosion No Internal corrosion

No significant corrosion is evident in the pipe internal surface. Thickness reduction to the extent of 3.93 to 5.51% is maximum. Based on the above findings, it may be concluded that no immediate action is needed. Corrosion rates may be established based on previous data and hence a remaining life criteria can be formulated in accordance with API 570/ 579-1. Technician signature: Client signature: Date: Date: