To, The Production Manager ITC Ltd PCPB SIDCUL Haridwar Sub:Combo Packaging Activity
11.01.2012
S no
Description of Items
UOW
Qty
Rate
Pack
1.62
Authorized Signatory Please find the activity and cost annexure attached in next sheet.
Sr NO
Activity Putting Leaflet + Shade Card+ Facewash 15 ml Tube + closing of indvidual cartons(Per 24 Tubes)
Time in Min
per shift
labour reqd
5.6
10
4706
5.61
4.3
2824
11 One person for supplying material to the line & Coding whose output is not calculated
4706
21 300
Labour used for production labour used for allied activies - Row A & c
8 2
A E
Total Manpower cost Production combo pack per shift Cost per Blister 13.5 % Margin Cost per Blister ( after margin ) Plant Running cost per shift Per Blister Cost (after plant running cost) Final Blister Cost ( excluding consumables ) Cost of consumables per pack Total Cost per pack Cost of Transportation
6300 4706
1.34 0.18
1.52 350 0.07 1.59
CONSUMABLES CALCULATION Total Run length Cos of Ink & Stamp Cost per yellow coding 5 tons No. of 33333.33333 packs per pack 0.009 per pack 0.02
0.029