HELLO HOW R U? Cascading of sites For the cascading of two sites we need to follow these steps. 1.

Connect the E1 cable at port 1 on the top of bts for the master sites intigration. 2.As master site is on air use another E1 cable to connect the port 2 of the bts. 3.Loop back the first e1 of port 2 and check the status of upper CMB synch and clk status,if is green then its ok VSWR alarm Voltage standing wave ratio 3.0>VSWR>1.5 VSWR1 alarm VSWR>3.0 VSWR2 alarm sitemaster to test the value of the VSWR Reason.1-CDU problem Reason.2-AEM problem Reason.3-cable connection problem continue 4.The first E1 of port 2 connets to the transmission medium for the slave site. 5.connect the e1 at slave site at port 1. 6.check the id port dip set and that should be according to OAM timeslot 30 or 31.the mastes bts use 16 OAM time slot. dip config16-000 30-010 31-001 These we set on S1 of id port and dip switch no is 0,1,2. Indoor alarm color code 1. white blue-- 1 2. Blac blue-- -0 3. white orange-0 4. black orange-0 5. green white--0 6. black green---0 7. white brown-0 8. black brown--0 9. blue red-0----0 10.red orange---0 THANK YOU!

You might also like