Professional Documents
Culture Documents
C)
/1
Over current
Short circut
Earth fault
Current setting
1 In
5 In (tr)
0.2 In (ct)
Over current
Short circut
Earth fault
Current setting
1 In
5 In (tr)
0.2 In (ct)
Over current
Current setting
1 In
Time setting
0.7 sec (700 ms)
0.0
0.7 sec (700 ms)
/2
Time setting
0.3 sec (300 ms)
0.0
0.3 sec (300 ms)
Time setting
7.5 sec
/3
( )
Over current
Short circut
Earth fault
Current setting
1 In
Time setting
0.1 sec (100 ms)
0.2 In (ct)
( )
Over current
Short circut
Earth fault
Current setting
1 In
Time setting
0.5 sec (500 ms)
0.2 In (ct)
Over current
Short circut
Earth fault
Current setting
0.75 In
3 In(ct)
Time setting
0.3 sec (300 ms)
0.0
11/66 ( O.C)
66
Current setting
Over current
Short circuit
Earth fault
0.3In
0.1In
1.1 sec
Earth fault
1.1sec
0.0
1.1 sec
11
Current setting
Over current
Short circuit
Time setting
Time setting
1.0sec
0.0
1.0 sec
1.0 sec
:
Power Transformer 66/11
C.T (66)
C.T (11)
Percentage impedance
25 MVA
300/1
1500/1
10 % = 0.1
M VA
I66=
3* KV
M VA
I11=
3* KV
I (O.C) 66= [(1.5* Irated)/ c.t.R]* In= [(1.5* 218.7)/ 300]* In=1.09 In
I (O.C) 11= [(1.5* Irated)/ c.t.R]* In= [(1.5* 1312.2)/ 1500]* In=1.312 In
I (S.C) 66= [(1.6* Irated)/ (Z%*c.t.R]* In=[(1.6* 218.7)/ (0.1*300]* In = In
I (S.C) 11= [(1.3* Irated)/ (Z%*c.t.R]* In=[(1.3* 1312.2)/ (0.1*1500]* In = In
(T.L) ( O.C)
distance relay back up protection
220 2.5 sec 66 1.5sec
. 800 66 ( O.C)
. 1200 220 ( O.C)
:
--- F
---or 220kv T.L, c.t 800/5
Over current setting (primary) = (1200/ 800)* In
= 1.5 In
(Secondary value)= 1.5*5 = 7.5 A
220kv
2.5
2.2
220/66
kv
1.5
66kv
1.5
1.1
66/11
kv
1.0
0.7
0.3