You are on page 1of 10

PROJECT MANAGEMENT

2


1.
1.1. /

1.2.
1.3.

1.4.
USER TRAINING
2.
2.1.
2.2.

2.3. Preventive Maintenance


2.4.


1.

2.

3.


4.
5.

6.

7. USER
TRAINING

(Project Manager)
-

-
-
-
-
-

-

-
(Project Engineer)


-
-
- Drawing
-
-
-
- /
-
- /
(System Engineer)


(Network Planner)


(Field Engineer)

(Project Coordinator)
.
.

Project Management Plan



1. (Project Defined)
2. (Project Management Principle)
3. (Planning and Organizing Project)
4. (Controlling Project)
5. (Project Management Discipline)
6. (Application Development Life Cycle)
7.

.

1.


2.

3.

4.

5.

6.

7.
8.
9.
10.


-

-
-

- . .

-


Facility
-
.


-
.
-
.


(Project Schedule)
-
.
Facilities


-

.
Engineering
-



-
-
-
-
-

Engineering
- Software Engineering
System Software Application Software Software
package
-
.


-
.

-


-
Application
Application
-
.



.
User Training

(Training Methodology)









-

-


-
-

-
- .

(Timing of Training)
- Course



-

- On-the-Job Training
-
-
-
-
-

-

-

.
.

-
-

-

-
1.
2.
- Performance Management

- Fault Management
- Diagnostic Trouble shooting










24 .

.

.
.

Network Management
. 2
/

-
- Error
- Traffic
- 12
-
Preventive Maintenance
. .
,


(Function in degraded
mode) (Intermittent) .


.
2

(Corrective Maintenance)


.

You might also like