No.
Uraian Pekerjaan
I Pendahuluan
1 Pembersihan Lahan
2 Bowplak
Satuan
m2
m
Volume
Harga Satuan
(Rp)
170.00 10,000
170.00 15,000
Jumlah Harga
(Rp)
Total Harga
(Rp)
1,700,000
2,550,000
4,250,000
II
1
2
Galian / Urugan
Galian Tanah Pondasi m3
Urugan Tanah
m3
3.60
76.50
150,000
90,000
540,000
6,885,000
7,425,000
III Pondasi
1 Tongkat 70 cm
bh 33.00 45,000
1,485,000
2 Sepatu tongkat + pen ls 1.00 900,000
900,000
3 Pasangan batu padas m3 25.20 450,000
11,340,000
13,725,000
IV Beton
1 Tongkat 12/12
m3 0.33 2,500,000
831,600
2 Slof 12/12
m3 1.62 2,500,000
4,050,000
3 Kolom 8/12
m3 0.91 2,500,000
2,268,000
4 Balak 8/12
m3 0.88 2,500,000
2,208,000
5 Kuda-kuda 8/12
m3 0.23 2,500,000
576,000
6 Kanopi
m3 0.15 2,500,000
375,000
7 Dak
m3 1.20 2,500,000
3,000,000
8 Rabatan lantai
m3 3.15 700,000
2,205,000
15,513,600
V Dinding / Plesteran
1 Pasangan bata merah m2 258.00 65,000
16,770,000
2 Plesteran
m2 516.00 35,000
18,060,000
3 Acian
m2 516.00 8,000
4,128,000
38,958,000
VI Kap / Atap
1 Kuda-kuda meranti 5/10 m 0.75 3,200,000
2,400,000
2 Kaso Meranti 5/7 m 0.45 3,200,000
1,433,600
3 Reng meranti 3/5 m 0.70 3,200,000
2,236,800
4 Sakura roof
m2 87.00 75,000
6,525,000
5
6
7
Wall flasing
m 26.00 55,000
1,430,000
Nok Sakura roof
m 9.50 55,000
522,500
Listplank Meranti m 27.00 45,000
1,215,000
15,762,900
VII Plapon
1 Kerangka meranti 5/5 m 142.00 20,500
2,911,000
2 Nusaboarb 4mm
m2 71.00 45,000
3,195,000
3 List plapon
m2 5.88 65,000
382,200
6,488,200
VII Kusen, pintu dan jendela
1 Kusen
m 82.30 65,000
5,349,500
2 Jendela
bh 6.00 425,000
2,550,000
3 Pintu double plywood bh 3.00 650,000
1,950,000
4 Pintu luar 9mm
bh 2.00 750,000
1,500,000
5 Pintu Utama
bh 1.00 800,000
800,000
6 Pintu WC
bh 1.00 700,000
700,000
12,849,500
IX Keramik
1 Lantai 30/30
m2 64.00 150,000
9,600,000
2 Dinding WC 20/25,20/20 m2 14.00 150,000
2,100,000
3 Kitchen set 30/30 m2 6.00 2,000,000
12,000,000
23,700,000
X Plumbing
1 Gali Sepitang
m3 1.60 450,000
720,000
2 Gorong2 + pasang bh 3.00 300,000
900,000
3 Tutup sepitang lgkp ls 1.00 725,000
725,000
4 Closed duduk lengkap ls 1.00 2,550,000
2,550,000
5 Bak Mandi
ls 1.00 850,000
850,000
6 Floor drain 2" lgkp bh 2.00 270,000
540,000
7 Kran air bersih 0,5" bh 4.00 170,000
680,000
6,965,000
XI Pengecatan
1 Dinding luar
m2 220.00 12,500
2,750,000
2 Dinding dalam
m2 190.00 9,500
1,805,000
3 Listplang
m2 9.80 25,000
245,000
4 Plapon
m2 94.00 9,500
893,000
5 Kusen
m2 18.54 30,000
556,116
6 Jendela
m2 3.02 30,000
90,600
7 Pintu
m2 21.20 30,000
636,000
6,975,716
XII Listrik
1 Stop kontak biasa lgkp ttk 7.00 250,000
1,750,000
2 Stop kontak TV
ttk 1.00 250,000
250,000
3 Titik lampu lgkp ttk 10.00 250,000
2,500,000
4 Bok MCB 2 grop lgkp bh 1.00 400,000
400,000
5 Arde standart
bh 1.00 350,000
350,000
5,250,000
XIII Halaman, taman, hiasan
1 Taman rumput gajah mini m2 20.00 80,000
1,600,000
2 Pohon palm standart bh 1.00 250,000
250,000
3 Gorong2 parit
m 4.00 250,000
1,000,000
4 Cor jembatan
m2 4.00 200,000
800,000
5 Car port
ls 18.00 65,000
1,170,000
6 Ornamen
m2 5.00 250,000
1,250,000
6,070,000
XIV Lain-lain
1
2
3
4
5
6
173,170,416
17,317,042
190,487,458
3,023,610