You are on page 1of 169
Page 1 of 1 Jade Dundas - 3rd and Pearl Casino Revisions From: Jade Dundas To: —_KeithRadig; Padgett, Tom & Shery, bob@rescotcocom: johnfitchS4@yah.. Date: 4/22/2013 1123 AM ‘Subject: 3rd and Pearl Casino Revisions Eckert, Paul Mayor/Courc ‘The purpose of ths emails to provide staf perspective on the award ofthe 3rd and Pea! St. project on this atemoons agenda. Staff is recommending award based upon the nee to complete ths workin coordination ‘with other projects. The DOT connection to Wesley Way isthe key coordination and must be completed in ths Construction season. This project was bid as a unit pice contact andi if that most changes can be mede within th proposed bid items The most pressing element associated with the revision isthe schedule. Inthe event thatthe projects awarded ‘the project design wil be modified which is anticipated to take about 6 weeks. In this scenario the stat date ould be shit about a month to mid June. Ifthe projects rejected the design modifications wil stil take up to six weeks a then the forma bd process will ned tobe conducted which could take another 7-8 weeks. The later scenario could push the start date ofthe project to mid August. Although the project stating at ths ater date may be able tobe bult barring delay, itis antipate the cost due toa lat bid may be higher than the ‘origina ia Please let me know ifyou have ary questions Thanks, Jade filesC:/Users/dleigh’AppData/Local/Temp/XPGrpWise/S1751DCSWCICCWCICC POS... 5/22/2013 Page 1 of 1 Jade Dundas - 3rd Street Reconstruction, Sioux City From: “Thomas Low To: "MeElmeel, Steven [DOT]" , Gi. Date: 5/7/2013 4:51 PM Subject: 3rd Street Reconstruction, Sioux City cc Bryan Wells BC: Jade Dundas Attachments: Preliminary DOT Plan Sheets.pa ae ‘Attached are preliminary plan sheets forthe prof, median tum lane and jointing changes onthe IDOT 3° Street plans for your review and comment, ‘We have proposed to move the end of the median from STA 3006+50 to 3007440 and change the taper to §:1 tallow for more storage Inthe left tur lane (250ft compared to original 100). Moving lt back to STA 3007-40 puts the end of the median Ina superlevation tvanstion, Ihave shown inthe atached preliminary sheets asa Faised median taper to keep storm water from the eastbound lanes from crossing over into the westbound lane (Gee sheet Lo). Thanks Tom tow DGR Engineering 65115 whserng Geek Ore Sur yh s1105, ove: ai 84 endear war ENGINEERING ‘My emall address has changed to tom low@dgr.com, please update your records. filez/IC:/Usersdleigh/AppData/Local/Temp/XPGrpWise/S189311SWCICCWCICC POS... 5/22/2013 HS] a he LS We oe a __XINO NOLLVNYOANI YOd (LOALOYd LOG LATULS Cue “LS YaALVM ¥ LS due - 1 ma AGULS YALA, | Page 1 of 1 Jade Dundas - 3rd Street Storm Sewer Status 1rd Rock Casino “Herbst, Dean [DOT]" "Bryan Wells” , "Thomas Low" , 511272013 9:36 AM 3rd Sireet Storm Sewer Status - Hard Rock Casi "Bishop, Darwin [DOT]" , "McElmeel, Steven{D. Jade Dundas ‘Attachments: IMN-29-7(43)149--OE-97 Sheet M3.pdf "understood that the storm sewer intakes, ines needed, and flowines along 3" Street was not going to change ‘based on the meeting held inthe lowa DOT District Office on May 2" The form grade of four (8) intakes atthe \Water Street intersection would need tobe changed and fryan Wells provided those new form grades which hhave been forwarded on tothe contactor for incorporation into the project. twas also discussed that the storm sewer ine which runs along the alle wil no longer be needed due tothe Casino configuration eliminating the alle and drainage need, |ask for confirmation ofthe following questions related to impacts to IMN-29-7(43}149--0E-97 4 Storm sewer line P-2 and P-7 shown in the attached Sheet M.2 is tobe installed a per plan orhas the need, size, or fowline information changed? 2. Line P.812201 along the alley shouldbe eliminated? The Casino plans will address storm sewer drainage and existing intake XSTS01, existing Intake XSTSO2, existing Intake XSTSO3, exiting Pipe XSTPOL, exiting Pipe RSTPO2, ana esting Pipe X31 3. There was discussion that intake 812202 and Line P-812202 may be relocated to accommodate the sino layout. When wil this information be avaliable? 4 Are there any other changes to the storm sewer showin inthe attached Sheet M.3not noted inthis email? Ifthe information isnot avaliable, then please let me know an anticipated date which the information would be provide. Thanks Prone 21238367 Cc one S1S157-70722 ol: Dean erst ionsaoe files/C:/Users/dleigh/AppData/Local/Temp/XPGrp Wise/S18F6281WCICCWCICC_POS... 5/22/2013 Page 1 of 1 Jade Dundas - Casino Revision Email ———— From: Jade Dundas To: Eckert, Paul Date: 4/22/2013 1053 AM Subject: Casino Revision Ema Mayor/Counc ‘The purpose ofthis emails to provide staf prospective on the award ofthe 3rd and Pear St, project on ths ‘afternoon’ agenda, Staff's recommending award based upon the need to complete ths workin coordination With othe projets The DOT connection to Wesley Way is the key coordination and must be completed in this Construction season. This project was bic as aunt pice contract andi fl that most changes can be made within the proposed 157 bid items, The most pressing element associated withthe revisions the schedule. Inthe event thatthe projects awarded ‘the project design willbe mocified whichis anticipated to take about 6 weeks. In thi scenario the stat date ‘would be sift about a month to mid June. Ifthe projects rejected the design modifications wil stil tak up to ‘sixweeks a then the formal bd process will need tobe conducted which could take another 7-8 weeks. The latter scenario could push the start date ofthe project to mid August. though the project starting at this time ‘may be abe to be built baring delay, itis antcipeted the cost due to alte bid may the higher thn the orginal bi Pease lt me know ifyou have any questions, Thanks, Jade filex/C:/Users/dleigh/AppData/Local/Temp/XPGrp Wise/S17516BCWCICCWCICC POS... 5/22/2013 ([S22R07) Jade Dundas GOT Hard Rock Coordination sade Dundas Hanson, Eric; Hanson, Rodney: Jade Dundas; Wes, Bryan 5722013 8.00 AM- 10:00 AM ‘Subject! DOT Hard Rock Coordination Place: DOT Dietrick ‘This is @ meeting to coorcinale the tree projects. Please lt me know if you havea confit with tis time ‘oF date, HOR wil aso be representing the DOT a the meeting, Page 1 of 1 Jade Dundas - Draft Development Agreement - Hard Rock From: Jonas Payne To: “jdundas@sioux-city.org” Date: 3/14/2013 8:51 AM Subject: Draft Development Agreement - Hard Rock sade, ‘We have completed a draft ofthe development agreement, and lke to touch base with you before | shoot it ‘re you avaliable sometime this afternoon fora very quick discussion? ‘Thanks, Jonas Payne 702-882-6711 filez/C:/Users/dleigh/AppData/Local/Temp/XPGrp Wise/S1418F98WCICCWCICC POS... 5/22/2013 Page 1 of 1 Jade Dundas - Fiber Hard Rock Casino - Sioux City Site —$—<—$—$—$— $< <$—$ <<< ————_aa—___. From: Gienn Sedivy To: Jade Dundes; Paul Eckert; Robert Padmore Date: 4/25/2013 8:36 AM Subject: Fer Har Rock Casino - Sioux Gy Se ‘Attachments: 5-121530-SITE-UTIL pdf ‘We shoul look at trying to Lease them derk fiber hack tothe MLK as we have fiber @ ber ring at 3d and Peart ‘and plenty of fiber at the MLK that feeds the 6th oor Orpheum were they can get to al of the Service Providers Glenn Sedivy, Communications Director P.O. Box 447 Sioux Cty, TA. $1302 712) 273-6959 fox (212) 279-6157 gsedivy@siour-city org >>> Eri Hanson 4/24/2013 5:11 PM >>> al, {Good afternoon, ths emails an update tothe New Sioux City Hard Rock Casino site, Attached isa site reliminary site plan ofthe area, the ste boundaries are Wesley Parkway on the West, Street onthe North, Douelass Street onthe East and 3"@Street on the south. The cite wil sen havea south parking lt that located south of 3 street We ask that you respond to let us know f you 60 or don’t have utilities inthe are. if you do have facies Within the project we would also ike to see a map ora exhibit you have forthe area, The main Contacts for this projec are: ‘Jonas Payne ~ Sioux ity Entertainment - Project Lead Justin Vogel ~JE0 Consuiting Group, Inc. ~ Civil Project Manager ‘Scott Conley =J£0 Consulting Group, Inc.~ Site Design-Lead Engineer '¥ you have any comments let us know or you can reply to the team that shown inthe CC tine ofthis emall ‘Thanks, Ere ERIC HANSON, PE | Project Manager 4JEO CONSULTING GROUP INC 1909 Dakota Avenue | South Sioux Cty, Nebraska 68776-2737 14:402-498.7018 | c: 695.695.0621 | f: 402.498.1702 ‘thanson@ieo.com ‘ww je0.com filex/C:/Users/dleigh/AppData/Local/Temp/XPGrp Wise/5178EBICWCICCWCICC_POS... 5/22/2013

You might also like