‘The purpose of ths emails to provide staf perspective on the award ofthe 3rd and Pea! St. project on this
atemoons agenda. Staff is recommending award based upon the nee to complete ths workin coordination
‘with other projects. The DOT connection to Wesley Way isthe key coordination and must be completed in ths
Construction season. This project was bid as a unit pice contact andi if that most changes can be mede
within th proposed bid items
The most pressing element associated with the revision isthe schedule. Inthe event thatthe projects awarded
‘the project design wil be modified which is anticipated to take about 6 weeks. In this scenario the stat date
ould be shit about a month to mid June. Ifthe projects rejected the design modifications wil stil take up to
six weeks a then the forma bd process will ned tobe conducted which could take another 7-8 weeks. The
later scenario could push the start date ofthe project to mid August. Although the project stating at ths ater
date may be able tobe bult barring delay, itis antipate the cost due toa lat bid may be higher than the
‘origina ia
Please let me know ifyou have ary questions
Thanks,
Jade
filesC:/Users/dleigh’AppData/Local/Temp/XPGrpWise/S1751DCSWCICCWCICC POS... 5/22/2013Page 1 of 1
Jade Dundas - 3rd Street Reconstruction, Sioux City
From: “Thomas Low
To: "MeElmeel, Steven [DOT]" ,
Gi.
Date: 5/7/2013 4:51 PM
Subject: 3rd Street Reconstruction, Sioux City
cc Bryan Wells
BC: Jade Dundas
Attachments: Preliminary DOT Plan Sheets.pa
ae
‘Attached are preliminary plan sheets forthe prof, median tum lane and jointing changes onthe IDOT 3° Street
plans for your review and comment,
‘We have proposed to move the end of the median from STA 3006+50 to 3007440 and change the taper to §:1
tallow for more storage Inthe left tur lane (250ft compared to original 100). Moving lt back to STA 3007-40
puts the end of the median Ina superlevation tvanstion, Ihave shown inthe atached preliminary sheets asa
Faised median taper to keep storm water from the eastbound lanes from crossing over into the westbound lane
(Gee sheet Lo).
Thanks
Tom tow
DGR Engineering
65115 whserng Geek Ore
Sur yh s1105,
ove: ai 84
endear
war
ENGINEERING
‘My emall address has changed to tom low@dgr.com, please update your records.
filez/IC:/Usersdleigh/AppData/Local/Temp/XPGrpWise/S189311SWCICCWCICC POS... 5/22/2013HS] a he LS We oe a
__XINO NOLLVNYOANI YOd (LOALOYd LOG LATULS Cue“LS YaALVM ¥ LS due - 1
ma
AGULS YALA,
|Page 1 of 1
Jade Dundas - 3rd Street Storm Sewer Status
1rd Rock Casino
“Herbst, Dean [DOT]"
"Bryan Wells” , "Thomas Low" ,
511272013 9:36 AM
3rd Sireet Storm Sewer Status - Hard Rock Casi
"Bishop, Darwin [DOT]" , "McElmeel, Steven{D.
Jade Dundas
‘Attachments: IMN-29-7(43)149--OE-97 Sheet M3.pdf
"understood that the storm sewer intakes, ines needed, and flowines along 3" Street was not going to change
‘based on the meeting held inthe lowa DOT District Office on May 2" The form grade of four (8) intakes atthe
\Water Street intersection would need tobe changed and fryan Wells provided those new form grades which
hhave been forwarded on tothe contactor for incorporation into the project.
twas also discussed that the storm sewer ine which runs along the alle wil no longer be needed due tothe
Casino configuration eliminating the alle and drainage need,
|ask for confirmation ofthe following questions related to impacts to IMN-29-7(43}149--0E-97
4 Storm sewer line P-2 and P-7 shown in the attached Sheet M.2 is tobe installed a per plan orhas the
need, size, or fowline information changed?
2. Line P.812201 along the alley shouldbe eliminated? The Casino plans will address storm sewer
drainage and existing intake XSTS01, existing Intake XSTSO2, existing Intake XSTSO3, exiting Pipe
XSTPOL, exiting Pipe RSTPO2, ana esting Pipe X31
3. There was discussion that intake 812202 and Line P-812202 may be relocated to accommodate the
sino layout. When wil this information be avaliable?
4 Are there any other changes to the storm sewer showin inthe attached Sheet M.3not noted inthis
email?
Ifthe information isnot avaliable, then please let me know an anticipated date which the information would be
provide.
Thanks
Prone 21238367
Cc one S1S157-70722
ol: Dean erst ionsaoe
files/C:/Users/dleigh/AppData/Local/Temp/XPGrp Wise/S18F6281WCICCWCICC_POS... 5/22/2013Page 1 of 1
Jade Dundas - Casino Revision Email
————
From: Jade Dundas
To: Eckert, Paul
Date: 4/22/2013 1053 AM
Subject: Casino Revision Ema
Mayor/Counc
‘The purpose ofthis emails to provide staf prospective on the award ofthe 3rd and Pear St, project on ths
‘afternoon’ agenda, Staff's recommending award based upon the need to complete ths workin coordination
With othe projets The DOT connection to Wesley Way is the key coordination and must be completed in this
Construction season. This project was bic as aunt pice contract andi fl that most changes can be made
within the proposed 157 bid items,
The most pressing element associated withthe revisions the schedule. Inthe event thatthe projects awarded
‘the project design willbe mocified whichis anticipated to take about 6 weeks. In thi scenario the stat date
‘would be sift about a month to mid June. Ifthe projects rejected the design modifications wil stil tak up to
‘sixweeks a then the formal bd process will need tobe conducted which could take another 7-8 weeks. The
latter scenario could push the start date ofthe project to mid August. though the project starting at this time
‘may be abe to be built baring delay, itis antcipeted the cost due to alte bid may the higher thn the orginal
bi
Pease lt me know ifyou have any questions,
Thanks,
Jade
filex/C:/Users/dleigh/AppData/Local/Temp/XPGrp Wise/S17516BCWCICCWCICC POS... 5/22/2013([S22R07) Jade Dundas GOT Hard Rock Coordination
sade Dundas
Hanson, Eric; Hanson, Rodney: Jade Dundas; Wes, Bryan
5722013
8.00 AM- 10:00 AM
‘Subject! DOT Hard Rock Coordination
Place: DOT Dietrick
‘This is @ meeting to coorcinale the tree projects. Please lt me know if you havea confit with tis time
‘oF date, HOR wil aso be representing the DOT a the meeting,Page 1 of 1
Jade Dundas - Draft Development Agreement - Hard Rock
From: Jonas Payne
To: “jdundas@sioux-city.org”
Date: 3/14/2013 8:51 AM
Subject: Draft Development Agreement - Hard Rock
sade,
‘We have completed a draft ofthe development agreement, and lke to touch base with you before | shoot it
‘re you avaliable sometime this afternoon fora very quick discussion?
‘Thanks,
Jonas Payne
702-882-6711
filez/C:/Users/dleigh/AppData/Local/Temp/XPGrp Wise/S1418F98WCICCWCICC POS... 5/22/2013Page 1 of 1
Jade Dundas - Fiber Hard Rock Casino - Sioux City Site
—$—<—$—$—$— $< <$—$ <<< ————_aa—___.
From: Gienn Sedivy
To: Jade Dundes; Paul Eckert; Robert Padmore
Date: 4/25/2013 8:36 AM
Subject: Fer Har Rock Casino - Sioux Gy Se
‘Attachments: 5-121530-SITE-UTIL pdf
‘We shoul look at trying to Lease them derk fiber hack tothe MLK as we have fiber @ ber ring at 3d and Peart
‘and plenty of fiber at the MLK that feeds the 6th oor Orpheum were they can get to al of the Service
Providers
Glenn Sedivy, Communications Director
P.O. Box 447
Sioux Cty, TA. $1302
712) 273-6959
fox (212) 279-6157
gsedivy@siour-city org
>>> Eri Hanson 4/24/2013 5:11 PM >>>
al,
{Good afternoon, ths emails an update tothe New Sioux City Hard Rock Casino site, Attached isa site
reliminary site plan ofthe area, the ste boundaries are Wesley Parkway on the West, Street onthe North,
Douelass Street onthe East and 3"@Street on the south. The cite wil sen havea south parking lt that
located south of 3 street
We ask that you respond to let us know f you 60 or don’t have utilities inthe are. if you do have facies
Within the project we would also ike to see a map ora exhibit you have forthe area, The main Contacts for
this projec are:
‘Jonas Payne ~ Sioux ity Entertainment - Project Lead
Justin Vogel ~JE0 Consuiting Group, Inc. ~ Civil Project Manager
‘Scott Conley =J£0 Consulting Group, Inc.~ Site Design-Lead Engineer
'¥ you have any comments let us know or you can reply to the team that shown inthe CC tine ofthis emall
‘Thanks,
Ere
ERIC HANSON, PE | Project Manager
4JEO CONSULTING GROUP INC
1909 Dakota Avenue | South Sioux Cty, Nebraska 68776-2737
14:402-498.7018 | c: 695.695.0621 | f: 402.498.1702
‘thanson@ieo.com
‘ww je0.com
filex/C:/Users/dleigh/AppData/Local/Temp/XPGrp Wise/5178EBICWCICCWCICC_POS... 5/22/2013