You are on page 1of 153
Page 1 of 2 Jade Dundas - FW: earl St. and 3rd St. - Private Utility meeting minutes from 8-29-12 Bryan Wells "Breon, Douglas J” , "Goeden, William J* , "ryanc@coneretespecialty.com” — | romances ence co, [arene | seeatee [asrezs [MES Tony Maa Leos Uves BPH | EET sys9 | 595-992 [tein Longline og Mremnes fuss ee anl ped-2020 | z24-1810 | g93-0290 | mansser braemuga nie Famecm gwen} Sove Crrp 274-6364] 1 Jaweatherlye udy Weatherly \mitgmertean Loopy ce —|202-Veb7 |eonysey | Wo-o ter |wndameran.ca Bray srbstary| ee 25]-75 mae [nidemerioan « tom [NEMASTERS prec tenfysin tends icp Paget Page 1 of 2 Erie Hanson “Jade Dundas (jdundas@sioux-city.or 4/2672013 3:39 PM FW: Sioux City Hard Rock Casing Lift Staion Opinion of Cost 4ustin Vogel , Scott Conley , "JonasPay.. Opinion of Cost - Lift Station 426.2013 pat sade, ‘Here fs the estimate on the ift station as you requested it. This is based off the flows that have been shared by everyone. If you have any questions let me know. ‘Thanks and have a good weekend, ete ERIC HANSON, PE | Project Ma JED CONSULTING GROUP INC 11909 Dakota Avenve | South Sioux Cy, Nebraska 68776-2737 4: 402.494.7019 | 605.695.0621 | & 402.494.1702 ehanson@ieo.com ‘wwrjeo.com From: Andrew Synborst ‘Sent: Friday, Ape 26, 2013 12:29 PM To! ric Hanson (Ce: Tyler evn; Scott Conley; Justin Vogel ‘Subject: Sioux City Hard Rock Casino Lift Station Opinion of Cost "Attached please find the cost estimate that you have been looking for. Given the limited data that we had availabe to compile this, would propose constructing the lit station south of the intersection of Peal and 3° Streets along the existing 12" alignment. The lift station will onsstof an & x8” square precast wet well and an 84" precast manhole valve vault (required by IDNR}. The wet well will have a Muffin Monster sewage grinder ‘mounted tothe influent pipe installed on guide rls for removal and maintenance. Three (3) horsepower submersible pumps designed to pump 650 gpm each installed onside rals wll met the estimated peak flow conditions. For the estimate it was determined to use @ peaking factor of 25 as thsis the best avalable published information fora hotel/restaurant peaking factor. Thus, triplex lift station i required as the station ‘must adequately convey the peak flow rate with the largest pump out of service. The force mains from each of ‘the lit pumps wil be piped together ina separate manhole along with appropriate valving for maintenance, safety and IONR regulatory compliance. ‘Of note mechanically should it arse, JEO has recently installed a grinder much ik the application we are discussing for South Sioux City. As| mentioned on the phone, have te following disclaimers or tems to take Into consideration should this move forward ‘+ The cost of the control panel i excessive due to the design requirements forthe City of Sioux City; ‘© Nocconcrete removal and replacement around the site for excavation has been added, only the deck file://C:/Usersleigh’AppData/Local/Temp/XPGrp Wise/517A9FC6WCICCWCICC POS... 5/22/2013,

You might also like