provision of precast concrete piling diameter 500 mm the precast concrete piling shall we purchase from manufacturer of piling

production including transportation to the site (work location). Size and length of the piles are appropriate with the plan picture. Classification quality is suitable as required in technique specification. Loading of precast concrete piles dia. 500mm and dia. 600mm Stages of measurement implementation on the field as follows: Gauge of teodolit-1 and teodolit-2 are build on planned BM posts (moving to the left and right from AS BM), by positioning of horizontal binocular (90). Reading angle of vertical teodolit-1 and teodolit-2 is set to 2,50 m elevation through calculation of the vertical angle setting. Reading angle of horizontal teodolit-1 with a reference of centerline bridge direction is set as b = 03 59 42 directing to tangent line of piles edge. Reading angle of horizontal teodolit-2 with a reference of centerline bridge direction is set as b = 273 59 42, directing to tangent line of piles edge. The tangent setting of piles edge. The setting of angle a and b for each pile posts (1-36) are designed in the form of table in accordance with the plan points. Direct ladder crane holding piles on a pontoon boat to the target of binocular teodolit-1 and teodolit-2. Then make the piles edge in touch (as in illustration picture) by a surveyors command. If the left and right edge is in touch precisely, then the piles are in correct position and ready to load. The method is used for straight piles. For sloping piles with an angle comparison 1:5, the ladder crane is set to form an angle 1:5 by using a mal equipped with waterpass. The piles are directed to a target of binocular teodolit-1 and teodolit-2 and make them in touch to the left and right edge till precise. When it is exact already, the piles are lowered in accordance with slant and ready to load. Principally, from 2 settings of horizontal angle only, its enough already for position determination correctly, whilst the third, fourth horizontal angle etc function only as control/checking, whether the two horizontal angles we make are right or wrong. In implementing the piles spots determination, need for communication tools, to coordinate between measurement team (surveyor) and piling team, crane operator as well. Determination of BM spots used for standing gauge reference are adapted with site condition in order to enable measurement and target are not obstructed.

You might also like