You are on page 1of 8

1.

PRODUCTION QTY. (fulfillment @ 100%)


2.
EFFICIENCY (up to 90%).
3.
YIELD (Metric for effy).
4.
OEE (Metric for Effy).
5.
Man power.

100.0%
90.0%
80.0%
70.0%
60.0%

50.0%
40.0%
30.0%
20.0%
10.0%
0.0%
14

15

19

20

21

22

26

27

28

MATERIAL

255

METHOD

485
745

MACHINE
MEN

2760
Changemodel
5s activities.

SMED
Video
Standard
5s
285min >
120min

880
Full E1 boxes

QUALITY,
99.51%

DIE
ENVIROMENTA
L
AVAILABI
LITY, 62.5%

PERFORM
ANCE,
89.5%

100.0%
90.0%

80.0%
70.0%
60.0%
50.0%
40.0%
30.0%
20.0%
10.0%
0.0%
14

15

19

20

21

22

23

24

25

26

27

28

.
145

Feeders

1905

10

METHOD

MACHINE

240
1285

MATERIAL

MEN
DIE
ENVIROMENTAL

>New pin distribution


>Change aluminum chss
to line D

QUALITY,
98.68%

AVAILABI
LITY, 79.3%

PERFORM
ANCE,
62.6%

120.0%

100.0%

80.0%

60.0%

40.0%

20.0%

0.0%
14

15

19

20

21

22

26

27

28

DOWNTIME 4 M's + 2

MATERIAL
METHOD

1010

290
0
0

2320

745

MACHINE
MEN
DIE

ENVIROMENT
AL

QUALITY,
99.75%

AVAILABI
LITY,
66.3%

PERFORM
ANCE,
96.1%

WEEK
NUM
13
20
24
25
27
27
29
30

Hired
Date
23-Mar
12-May
9-Jun
16-Jun
29-Jun
1-Jul
12-Jul
19-Jul

shift
L1
M-F
L1
L1
L2
L1
L2
L1

Working
Days
35
30
13
3
6
2
1
3

You might also like