Specs (Under SOR): 1. Temporary access to PS during construction 2. PS wall hacking investigation, design, BCA, AC, PE etc.

. BoQ (Under BQ Misc & Prov.): 1. Structural Investigation of PS wall 2. Engagement of C&S PE for the design, BCA submission etc. 3. AC Checker engagement (put provisional sum of 10K)