Contoh Pengiraan
Increament untuk menaikkan beban = 100/8 = 12.5 ton Increament untuk menurunkan beban = 100/4 = 425 ton Berat pemberat (kentledge) = 100 + 20% = 120 ton
PROCEDURES
1st Cycle up to Working Load 25% of working load for each increment Maintained minimum 2 hours at each increment Maintained 24 hours at Working Load. Reading is taken at 15 minutes interval Reading of pile settlement is taken before and after increment Unloading at 4 equal stages @ 1 hour interval.
PROCEDURES
2nd Cycle up to Twice Working Load 25% of working load for each increment Up to 2 x working load (8 increments) Maintained minimum 2 hours at each increment ATAU rate of settlement 0.05mm in 15 minutes is reached. Maintained 24 hours at 2 times Working Load. Reading is taken at 15 minutes interval Reading of pile settlement is taken before and after increment Unloading at 4 equal stages @ 1 hour interval. Wait 1 hour after zero load to record residual settlement Plot load/time graph and load settlement graph.
At design load s< 12.5mm or, At test load s < 38mm or 10% pile diameter (which is higher), or Residual settlement <6.5mm
-10 -15
-35 -40
Coaxial loading Bearing for the kentledge Spacing & rigidity of the reference beam supports Compliance with STD & Spec (layout & measurement devise)?