You are on page 1of 133

BSS Dimensioning Methods

in B10
Eugen Marza
December 2008
Agenda
1. Air Interface (Cell) Dimensioning
2. Abis Interface Dimensioning
3. BSC Dimensioning
4. Ater CS Dimensioning
5. Ater PS Dimensioning
6. GPU/GP Dimensioning
7. Gb Interface Dimensioning
8. Location Area Dimensioning
3 | Presentation Title | Month 2008 All Rights Reserved Alcatel-Lucent 2008, XXXXX
BSS Dimensioning Methods in B10
Overview

SGSN
speech
data
A-ter mux
Gb
A
CS
CS+ PS
PS
CS
A-bis
Air

TC
MT120
SMU TRCU TRCU

TRCU

MT120
SMU TRCU

TRCU

TRCU


TRX 2 M-EGCH link 1
PS
traffic
TRX 3
M-EGCH link 2
M-EGCH link n
BTS


Dynamic
Abis
allocation
GCH Extra
GCH Basic
GCH Basic
GCH Extra
GCH Bonus
TCH
TCH
TRX 1
CS
traffic

TRX n
Assessment of
basic and bonus
Abis nibbles from
TRX and BTS
configuration
Calculate the needed
extra Abis TS for real
traffic on Abis Itf and
the number of needed
Abis links
Assessment of
CS and PS traffic
over AterMux
Calculate the total
number of Ater
channels and the
required number of
AterMux links
Evaluate the
required number
of Gb 64K TS
per GPU
Check the traffic
capacity limits based
on BSC configuration
Calculate the needed
radio TS for SDCCH,
TCH and PDCH,
then nb of TRXs
Evaluate the
required number
of GPU/GP
boards per BSC
Assessment of
traffic values for
SDCCH, TCH and
PDCH channels
Check the load
and conectivity on
DSP and GPU
boards of MFS

MxBSC
CCP
board
CCP
board
SSW
board
TP
board
LIU
board
LIU
board

MxMFS
GP board
DSP DSP DSP DSP
GP board
DSP DSP DSP DSP
4 | Presentation Title | Month 2008 All Rights Reserved Alcatel-Lucent 2008, XXXXX
Air Interface (Cell)
Dimensioning
1
5 | Presentation Title | Month 2008 All Rights Reserved Alcatel-Lucent 2008, XXXXX
BSS Dimensioning Methods in B10
Air Interface (Cell) Dimensioning
Target
Find the needed number of RTCH and TRX for one Cell
Input (counters values):
CS Traffic
PS Traffic
SDCCH Traffic
CS Congestion
PS Congestion
SDCCH Congestion
Customer requirements for blocking probability
Output:
Nb of SDCCH channels
Nb of TCH
Nb of TRX
Real blocking
6 | Presentation Title | Month 2008 All Rights Reserved Alcatel-Lucent 2008, XXXXX
BSS Dimensioning Methods in B10
Air Interface (Cell) Dimensioning
Method for SDCCH:
Erlang B
Needed counters for SDCCH:
MC400 or GSDTRT (SDCCH_occy_total)
MC04 or GSDNACGN (SDCCH_assign_cong)
MC148 or GSDNACAN (SDCCH_assign_allocated)
Erlang B
Required
SDCCH Traffic
GoS:
% SDCCH blocking
Nb of required
SDCCH sub-channels
/ timeslots
INPUT OUTPUT METHOD
7 | Presentation Title | Month 2008 All Rights Reserved Alcatel-Lucent 2008, XXXXX
BSS Dimensioning Methods in B10
Air Interface (Cell) Dimensioning
Method for SDCCH:
3600
400 MC
traffic _ SDCCH _ Measured =
%
MC MC
MC
cong _ SDCCH % 100
148 04
04

+
=
%) , cong _ SDCCH (% Min
traffic _ SDCCH _ Measured
traffic _ SDCCH _ quired Re
30 1
=
( ) 0.5% ic; DCCH_traff Required_S angB InverseErl s subchannel SDCCH quired Re of Nb =
(
(
(

=
8
s subchannel SDCCH _ required _ Nb
TSs _ SDCCH _ required _ Nb
For BCCH not-combined cell:
For BCCH combined cell:
(
(
(


=
8
4 s subchannel SDCCH _ required _ Nb
TSs _ SDCCH _ required _ Nb
8 | Presentation Title | Month 2008 All Rights Reserved Alcatel-Lucent 2008, XXXXX
BSS Dimensioning Methods in B10
Air Interface (Cell) Dimensioning
Method for TCH and PDCH:
Kaufmann-Roberts.
Needed counters for TCH:
MC380a, MC380b, MC703, MC812.
Needed counters for PDCH:
P451a, P451b,
P38e, P39f,
P14, P27,
P62x (x=a-c),
P438c, P507,
P91x (x=a-f),
P505.
PS_DL service
CS_FR service
CS_HR service
PS_UL service
Required Traffic

getMax
Nb RTS
needed for
CS and PS
traffic
Kaufmann-
Roberts
Algorithm
9 | Presentation Title | Month 2008 All Rights Reserved Alcatel-Lucent 2008, XXXXX
BSS Dimensioning Methods in B10
Air Interface (Cell) Dimensioning
Method for TCH and PDCH:
Kaufmann-Roberts.
Needed counters for TCH:
MC380a or GTCTRFT (RTCH_full_occy_total)
MC380b or GTCTRHT (RTCH_half_occy_total)
MC703 or GTCNACAN (RTCH_assign_allocated)
MC812 or GTCNACGN (RTCH_assign_cong)
10 | Presentation Title | Month 2008 All Rights Reserved Alcatel-Lucent 2008, XXXXX
BSS Dimensioning Methods in B10
Air Interface (Cell) Dimensioning
Method for TCH
703 812 MC MC
MC812
Request _ n RTCH_Assig
Cong _ n RTCH_Assig
ng CS_Real_Co
+
= =
Real_Cong) _ CS %, min( Cong _ CS 30 =
Cong _ CS
b MC a MC
a MC
Cong _ FR
+
=
380 380
380
Cong _ CS
b MC a MC
b MC
Cong _ HR
+
=
380 380
380
) Cong _ FR (
a MC
Cong _ FR
Traffic _ Successful _ FR
Traffic _ FR _ quired Re
cell

=

=
1 3600
380
1
) Cong _ HR (
b MC
Cong _ HR
Traffic _ Successful _ HR
Traffic _ HR _ quired Re
cell

=

=
1 3600
380
1
11 | Presentation Title | Month 2008 All Rights Reserved Alcatel-Lucent 2008, XXXXX
BSS Dimensioning Methods in B10
Air Interface (Cell) Dimensioning
Method for TCH
The Required traffic for FR and HR is used together with Required traffic for
PS as input for Kaufmann-Roberts algorithm.
The blocking probability used for CS services is 2%.
Note:
Required CS Bandwidth is:
1 TS for FR
0.5 TS for HR
12 | Presentation Title | Month 2008 All Rights Reserved Alcatel-Lucent 2008, XXXXX
BSS Dimensioning Methods in B10
Air Interface (Cell) Dimensioning
Method for PDCH
Needed counters for PDCH:
P451a or GARPDCTUBUT (GPRS_PDCH_used_UL_TBF_overall_time)
P451b or GARPDCTDBUT (GPRS_PDCH_used_DL_TBF_overall_time)
P38e or GARPDCUDBUT (GPRS_PDCH_DL_traffic_time)
P38f or GARPDCUUBUT (GPRS_PDCH_UL_traffic_time)
P14 or GQRDTECGN (GPRS_DL_TBF_estab_fail_radio_cong)
P27 or GQRUTECGN (GPRS_UL_TBF_estab_fail_radio_cong)
P62a+P62b+P62c- P438c+ P507 or GTRUTERQN (GPRS_UL_TBF_request)
P91a + P91b + P91c + P91d + P91e + P91f + P505 or GTRDTERQN
(GPRS_DL_TBF_request)
13 | Presentation Title | Month 2008 All Rights Reserved Alcatel-Lucent 2008, XXXXX
BSS Dimensioning Methods in B10
Air Interface (Cell) Dimensioning
Method for PDCH
3600
451b P
traffic _ PS _ DL _ Measured =
3600
451a P
traffic _ PS _ UL _ Measured =
%
P f P e P d P c P b P a P
P
cong _ radio _ TBF _ DL % 100
505 91 91 91 91 91 91
14

+ + + + + +
=
%
P c P c P b P a P
P
cong _ radio _ TBF _ UL % 100
507 438 62 62 62
27

+ + +
=
%) , cong _ radio _ TBF (% Min
traffic _ PS _ Measured
traffic _ PS _ quired Re
30 1
=
Final value for Required PS traffic is Max between required DL and UL PS traffic.
14 | Presentation Title | Month 2008 All Rights Reserved Alcatel-Lucent 2008, XXXXX
BSS Dimensioning Methods in B10
Air Interface (Cell) Dimensioning
Method for PDCH
Based on TBF usage:
For calculation 98% quantile and 0.01s delay are used.
Note:
Required PS Bandwidth (minimum number of TS per a request on
each direction) is coming from:
Average Nb of DL TBF per PDCH = P451b/P38e
Average Nb of UL TBF per PDCH = P451a/P38f
If indicators are available, the required bandwidth is given by:
GARPDCTDPIN = GPRS_DL_TBF_Pilled_avg
GARPDCTUPIN = GPRS_UL_TBF_Pilled_avg
15 | Presentation Title | Month 2008 All Rights Reserved Alcatel-Lucent 2008, XXXXX
BSS Dimensioning Methods in B10
Air Interface (Cell) Dimensioning
Final aggregation:
Total nb of RTCH =
= 1 TS for BCCH + 1 TS for CCCH (if case) +
+ Nb of Required SDCCH TSs +
+ Nb of Required TSs for FR, HR and PS,
coming from Kaufmann-Roberts algorithm.
Total nb of TRX = Roundup [(Total nb of RTCH)/8]
16 | Presentation Title | Month 2008 All Rights Reserved Alcatel-Lucent 2008, XXXXX
BSS Dimensioning Methods in B10
Air Interface (Cell) Dimensioning
Method for PS throughput
Input (counters values):
DL PS Traffic
UL PS Traffic
Output:
DL PS Throughput
UL PS Throughput
17 | Presentation Title | Month 2008 All Rights Reserved Alcatel-Lucent 2008, XXXXX
BSS Dimensioning Methods in B10
Air Interface (Cell) Dimensioning
Method for PS throughput
Needed counters for PDCH DL throughput:
P38e or GARPDCUDBUT (GPRS_PDCH_DL_traffic_time)
P20a or GQRPDDR1N (GPRS_DL_RLC_block_PDTCH_CS1_retransmissing_ack)
P20b or GQRPDDR2N (GPRS_DL_RLC_block_PDTCH_CS2_retransmissing_ack)
P20c or GQRPDDR3N (GPRS_DL_RLC_block_PDTCH_CS3_retransmissing_ack)
P20d or GQRPDDR4N (GPRS_DL_RLC_block_PDTCH_CS4_retransmissing_ack)
P20f+P20g+P20h+P20i+P20j+P20k+P20l+P20m+P20n or GQRPDDRMN
(GPRS_DL_RLC_bytes_PDTCH_MCSx_retransmissing_ack from MCS1 to MSC9)(old P20e)
P55x (x=a-d) or GTRPDDC1N to GTRPDDC4N (GPRS_DL_useful_RLC_blocks_CS1_ack to
GPRS_DL_useful_RLC_blocks_CS4_ack)
P55x (x=e-m) or GTRPDDM1N to GTRPDDM9N (GPRS_DL_useful_RLC_blocks_MCS1_ack to
GPRS_DL_useful_RLC_blocks_MCS9_ack)
18 | Presentation Title | Month 2008 All Rights Reserved Alcatel-Lucent 2008, XXXXX
BSS Dimensioning Methods in B10
Air Interface (Cell) Dimensioning
Method for PS throughput
Needed counters for PDCH UL throughput:
P38f or GARPDCUUBUT (GPRS_PDCH_UL_traffic_time)
P21a or GQRPDUR1N (GPRS_UL_RLC_block_PDTCH_CS1_retransmissing_ack)
P21b or GQRPDUR2N (GPRS_UL_RLC_block_PDTCH_CS2_retransmissing_ack)
P21c or GQRPDUR3N (GPRS_UL_RLC_block_PDTCH_CS3_retransmissing_ack)
P21d or GQRPDUR4N (GPRS_UL_RLC_block_PDTCH_CS4_retransmissing_ack)
P21f+P21g+P21h+P21i+P21j+P21k+P21l+P21m+P21n or GQRPDURMN
(GPRS_UL_RLC_bytes_PDTCH_MCSx_retransmissing_ack from MCS1 to MSC9)(old P21e)
P57x (x=a-d) or GTRPDUC1N to GTRPDUC4N (GPRS_UL_useful_RLC_blocks_CS1_ack to
GPRS_DL_useful_RLC_blocks_CS4_ack)
P57x (x=e-m) or GTRPDUM1N to GTRPDUM9N (GPRS_UL_useful_RLC_blocks_MCS1_ack to
GPRS_DL_useful_RLC_blocks_MCS9_ack)
19 | Presentation Title | Month 2008 All Rights Reserved Alcatel-Lucent 2008, XXXXX
BSS Dimensioning Methods in B10
Air Interface (Cell) Dimensioning
Method for PS throughput
DL and UL throughput:
= =
n_Time_DL Transmisio
Data_DL
] kbps [ d
DL _ PS
= =
UL _ Time _ n Transmisio
UL _ Data
] kbps [ d
UL _ PS
e P
P Size _ Block _ RLC P Size _ Block _ RLC P
n
f x
x
m
a x
x x
d
a x
x x
38 1000
20 55 20 8

\
|
+ +
=

= = =
f P
P Size _ Block _ RLC P Size _ Block _ RLC P
n
f x
x
m
a x
x x
d
a x
x x
38 1000
21 57 21 8

\
|
+ +
=

= = =
20 | Presentation Title | Month 2008 All Rights Reserved Alcatel-Lucent 2008, XXXXX
Abis Interface
Dimensioning
2
21 | Presentation Title | Month 2008 All Rights Reserved Alcatel-Lucent 2008, XXXXX
BSS Dimensioning Methods in B10
Abis Interface Dimensioning
Target
Find the required number of ExtraAbis TS
Check RSL congestion
Methods are applied at BTS level
Based on Abis allocation priorities
MAX_PDCH_High_Load Zone From MAX_PDCH_High_Load to MAX_PDCH
Basic nibbles
of cell
Extra + Bonus
nibbles of BTS
Priority N1
Priority N2
Priority N3
22 | Presentation Title | Month 2008 All Rights Reserved Alcatel-Lucent 2008, XXXXX
BSS Dimensioning Methods in B10
Abis Interface Dimensioning
Method for ExtraAbis TS
ErlangC
Input (counters values):
PS Traffic
Extra-Bonus Traffic
Available Extra-Bonus nibbles
PS Congestion (Abis)
Customer requirements for QoS (delay and quantile)
Customer requirements for number of basic and bonus nibbles
Output:
Nb of extra Abis nibbles
Nb of ExtraAbisTS
23 | Presentation Title | Month 2008 All Rights Reserved Alcatel-Lucent 2008, XXXXX
BSS Dimensioning Methods in B10
Abis Interface Dimensioning
Extra and Bonus Nibbles Method
(Method 1)
Erlang C
Required extra
& bonus Abis
nibble Traffic
GoS:
% Quantile of x
delay sec
Nb of required
extra & bonus
Abis Nibbles
INPUT
OUTPUT
METHOD
Nb of required
extra Abis Nibbles
Nb of bonus Abis
Nibbles

24 | Presentation Title | Month 2008 All Rights Reserved Alcatel-Lucent 2008, XXXXX
BSS Dimensioning Methods in B10
Abis Interface Dimensioning
Extra and Bonus Nibbles Method
Needed counters:
P466 or GABGCHUSEBT (GPRS_transmission_GCH_use_bonus_and_extra_time),
P105i or GQRDTECBN (GPRS_DL_TBF_estab_fail_abis_cong),
P91a + P91b + P91c + P91d + P91e + P91f + P505 or GTRDTERQN
(GPRS_DL_TBF_request)
P105j or GQRUTECBN (GPRS_UL_TBF_estab_fail_abis_cong),
P62a+P62b+P62c- P438c+ P507 or GTRUTERQN (GPRS_UL_TBF_request)
Note:
The counters retrieved at cell level must be aggregated per BTS.
25 | Presentation Title | Month 2008 All Rights Reserved Alcatel-Lucent 2008, XXXXX
BSS Dimensioning Methods in B10
Abis Interface Dimensioning
Extra and Bonus Nibbles Method
3600
466 P
traffic _ Abis _ bonus & extra _ Measured =
%
P f P e P d P c P b P a P
i P
cong _ Abis _ TBF _ DL % 100
505 91 91 91 91 91 91
105

+ + + + + +
=
%
P c P c P b P a P
j P
cong _ Abis _ TBF _ UL % 100
507 438 62 62 62
105

+ + +
=
) cong _ Abis _ TBF _ UL % , cong _ Abis _ TBF _ DL (% Max cong _ Abis _ TBF % =
%) , cong _ Abis _ TBF (% Min
traffic _ Abis _ bonus & extra _ Measured
traffic _ Abis _ bonus & extra _ quired Re
30 1
=
26 | Presentation Title | Month 2008 All Rights Reserved Alcatel-Lucent 2008, XXXXX
BSS Dimensioning Methods in B10
Abis Interface Dimensioning
Extra and Bonus Nibbles Method
= nibbles bonus & extra quired Re of Nb
( ) delay quantile; fic; bonus_traf & xtra Required_e angC InverseErl =
where quantile = 99% and delay = 0.01s
27 | Presentation Title | Month 2008 All Rights Reserved Alcatel-Lucent 2008, XXXXX
BSS Dimensioning Methods in B10
Abis Interface Dimensioning
Extra and Bonus Nibbles Method
Number of required Extra Abis nibbles =
= Number of required extra & bonus Abis nibbles Nb of bonus Abis nibbles,
Note: Nb of bonus nibbles corresponds to Nb of BCCH and static SDCCH timeslots.
and
Number of required Extra Abis TS =
= Roundup[(Number of required extra Abis nibbles)/4].
Note: 1 Abis TS contains 4 Abis nibble
This method is recommended in case of BTSs with 2 or more cells.
28 | Presentation Title | Month 2008 All Rights Reserved Alcatel-Lucent 2008, XXXXX
BSS Dimensioning Methods in B10
Abis Interface Dimensioning
GCH Method
(Method 2)
Erlang C
Required Data
Traffic on Abis
GoS:
% Quantile of x
delay sec
Nb of required
Abis Nibbles
INPUT
OUTPUT
METHOD
Nb of required
extra Abis Nibbles
Nb of basic &
bonus Abis Nibbles

29 | Presentation Title | Month 2008 All Rights Reserved Alcatel-Lucent 2008, XXXXX
BSS Dimensioning Methods in B10
Abis Interface Dimensioning
GCH Method
Needed counters for Data traffic:
P100c or GAAGCHUST (GPRS_transmission_GCH_busy_time)
Needed counters for Abis congestion:
P105i or GQRDTECBN (GPRS_DL_TBF_estab_fail_abis_cong),
P91a + P91b + P91c + P91d + P91e + P91f + P505 or GTRDTERQN
(GPRS_DL_TBF_request)
P105j or GQRUTECBN (GPRS_UL_TBF_estab_fail_abis_cong),
P62a+P62b+P62c- P438c+ P507 or GTRUTERQN (GPRS_UL_TBF_request)
Note:
The counters retrieved at cell level must be aggregated per BTS.
30 | Presentation Title | Month 2008 All Rights Reserved Alcatel-Lucent 2008, XXXXX
BSS Dimensioning Methods in B10
Abis Interface Dimensioning
GCH Method
Abis congestion:
%
P f P e P d P c P b P a P
i P
cong _ Abis _ TBF _ DL % 100
505 91 91 91 91 91 91
105

+ + + + + +
=
%
P c P c P b P a P
j P
cong _ Abis _ TBF _ UL % 100
507 438 62 62 62
105

+ + +
=
) cong _ Abis _ TBF _ UL % , cong _ Abis _ TBF _ DL (% Max cong _ Abis _ TBF % =
31 | Presentation Title | Month 2008 All Rights Reserved Alcatel-Lucent 2008, XXXXX
BSS Dimensioning Methods in B10
Abis Interface Dimensioning
GCH Method
Measured traffic:
Required traffic:
Required Abis nibbles for PS:
where quantile = 99% and delay = 0.01s
3600
100c P
traffic _ GCH _ Measured =
%) , cong _ Abis _ TBF (% Min
traffic _ GCH _ Measured
traffic _ GCH _ quired Re
30 1
=
= nibbles Abis quired Re of Nb
( ) delay quantile; ; CH_traffic Required_G angC InverseErl =
32 | Presentation Title | Month 2008 All Rights Reserved Alcatel-Lucent 2008, XXXXX
BSS Dimensioning Methods in B10
Abis Interface Dimensioning
GCH Method
Number of required Extra Abis nibbles =
= Number of required Abis nibbles Nb of basic and bonus Abis nibbles,
Note: Nb of basic nibbles per cell = MAX_PDCH.
Nb of bonus nibbles corresponds to Nb of BCCH and static SDCCH timeslots.
and
Number of required Extra Abis TS =
= Roundup[(Number of required Extra Abis nibbles)/4].
Note: 1 Abis TS contains 4 Abis nibble
This method is recommended in case of BTSs with only 1 cell.
33 | Presentation Title | Month 2008 All Rights Reserved Alcatel-Lucent 2008, XXXXX
BSS Dimensioning Methods in B10
Abis Interface Dimensioning
Abis Dimensioning
Finally, at BTS level for Abis dimensioning
Total Number of Abis TS =
= 2*Total nb of TRX +
+ Nb of TS for RSL and OML (depending on MCB type)
+ Nb of required Extra Abis TS,
and
Number of required Abis Links =
= Roundup[(Total Number of Abis Ts)/31].
34 | Presentation Title | Month 2008 All Rights Reserved Alcatel-Lucent 2008, XXXXX
BSS Dimensioning Methods in B10
Abis Interface Dimensioning
Method for RSL
LAPD efficiency (in DL):
Needed counters
Conter Type: 7
Measured Object: LAPD
Conter L1.1 (NB_LAPD_INFO_FRAME_SENT)
Number of Information frames transmitted on the LapD link, excluding the
re-transmissions.
Conter L1.15 (NB_LAPD_INFO_FRAME_RESENT)
Number of Information frames re-transmitted on the LapD link.
Formula:
LAPD efficiency [%] = L1.1/( L1.1+L1.15)*100
35 | Presentation Title | Month 2008 All Rights Reserved Alcatel-Lucent 2008, XXXXX
BSS Dimensioning Methods in B10
Abis Interface Dimensioning
Method for RSL congestion
LAPD congestion detection:
Conter L1.18 (TIME_LAPD_CONG)
Conter Type: 7
Measured Object: LAPD
Time in seconds during which the LapD link is congested in transmission in
the BSC.
In case LAPD congestion is present, the MCB load must be reduced:
If the multiplexing rule is applied per BTS by changing at BTS level the signaling
load from normal to high;
If the load is already high by changing the multiplexing rule from per BTS to per
Sector with the same load options normal or high.
Note: These changes may impact the Abis TS usage.
36 | Presentation Title | Month 2008 All Rights Reserved Alcatel-Lucent 2008, XXXXX
BSC
Dimensioning
3
37 | Presentation Title | Month 2008 All Rights Reserved Alcatel-Lucent 2008, XXXXX
BSS Dimensioning Methods in B10
BSC Dimensioning
Target
Find the total CS traffic
Find the related CS signaling traffic
Decide what solution is required for signaling traffic: LSL or HSL
Check the HDLC occupancy to decide what type of TP GSM board is required:
TP GSM V1 or TP GSM STM1 (V3)
Find the required number of AterMux CS links
Find the total PS traffic
Find the required number of AterMux PS links
Find the required number of GPU/GP boards
38 | Presentation Title | Month 2008 All Rights Reserved Alcatel-Lucent 2008, XXXXX
BSS Dimensioning Methods in B10
BSC Dimensioning
Method for BSC Dimensioning
ErlangB and ErlangC
Input (counters values):
CS Traffic
SS7 Traffic
PS Traffic
AterMux PS congestion
Customer requirements for CS and SS7 blocking and QoS for PS
Output:
Nb of TCH, CS dedicated links and real blocking
Nb of SS7 connections, links and real blocking
Nb of GCH
Nb of GPU boards per BSC
Nb of PS links per BSC and PS real quantile
39 | Presentation Title | Month 2008 All Rights Reserved Alcatel-Lucent 2008, XXXXX
BSS Dimensioning Methods in B10
BSC Dimensioning
Method for CS Traffic
Needed counters for TCH:
MC380a or GTCTRFT (RTCH_full_occy_total)
MC380b or GTCTRHT (RTCH_half_occy_total)
Needed counters for SCCP:
MC01+MC02 or GSDNASUN (SDCCH_assign_success),
MC10 or GSDHOSUN (SDCCH_HO_success)
MC390 or GSDAHCAN (SDCCH_allocated),
MC400 or GSDTRT (SDCCH_occy_total),
MC380a+MC380b or GTCTRT (RTCH_occy_total)
or GQSTRSCE (SCCP_Erlang_BH)
40 | Presentation Title | Month 2008 All Rights Reserved Alcatel-Lucent 2008, XXXXX
BSS Dimensioning Methods in B10
BSC Dimensioning
Method for CS Traffic
Max CS Traffic (during BH)
The required value of TCH traffic must be below the BSC Erlang capacity
(depending on BSC configuration), else the BSC capacity must be extended if
possible by adding one CCP board.
3600
380 380 b MC a MC
traffic _ TCH _ Measured
+
=
in arg m % traffic _ TCH _ measured traffic _ TCH _ quired Re 15 + =
41 | Presentation Title | Month 2008 All Rights Reserved Alcatel-Lucent 2008, XXXXX
BSS Dimensioning Methods in B10
BSC Dimensioning
Method for CS Traffic
Max SCCP Traffic (during BH)
Measured SCCP Traffic = SCCP traffic in Erlang during Busy Hour =
= ((MC400/MC390)*(MC01+MC02+MC10) + (MC380a+MC380b))/3600
If the required number of SS7 TSs is below or equal to 16, the LSL solution
may be used.
If the required number of SS7 TSs is above 16, the HSL solution is mandatory.
in arg m % traffic _ SCCP _ measured traffic _ SCCP _ quired Re 15 + =
( ) c;0.1% CCP_traffi Required_S angB InverseErl s connection SCCP quired Re of Nb =
(
(
(

=
103
7
channels _ SCCP _ required _ No
TSs _ SS _ required _ No
42 | Presentation Title | Month 2008 All Rights Reserved Alcatel-Lucent 2008, XXXXX
BSS Dimensioning Methods in B10
BSC Dimensioning
Method for HDLC occupancy
Due to limited number of HDLC channels inside TP GSM board, it is important
to check the number of HDLC channels in use.
10 9 0 9 10 staticMux {signallingLoadBts dummy} G62A12_3 { amecID 1, moiRdn 17}
6 5 0 5 6 noMux {signallingLoadBts dummy} G62B091 { amecID 1, moiRdn 11}
4 11 0 11 12 statisticMux64 {signallingLoadBts normal} G62B122 { amecID 1, moiRdn 134}
1 4 0 4 5 statisticMux64 {signallingLoadBts dummy} G62B271 { amecID 1, moiRdn 100}
2 3 0 3 4 statisticMux64 {signallingLoadBts high} G62B083 { amecID 1, moiRdn 10}
6 0 6 6 7 statisticMux64 {signallingLoadBts high} G62B011 { amecID 1, moiRdn 1}
Total #
HDLC
Total #
TRX FR
Total #
TRX DR
Total #
TRE
Total #
LAPD
MuxRule MuxRate UserLabel
AlcatelBtsSiteManager
InstanceIdentifier
from AlcatelBtsSiteManager.csv
from AlcatelBts_Sector.csv
Apply MCB rule
43 | Presentation Title | Month 2008 All Rights Reserved Alcatel-Lucent 2008, XXXXX
BSS Dimensioning Methods in B10
BSC Dimensioning
Method for HDLC occupancy
This check is important especially when the BSC must be extended by adding
new cells.
If the total required number of HDLC channels is below 441, the TP GSM V1
board has enough capacity to be used.
If the required number of HDLC channels is above 441, the multiplexing rule
must be changed from noMux to statisticMux64.
If the resulted number of HDLC channels is still above 441, the TP GSM V1
board must be replaced by TP GSM STM1 (V3) board.
44 | Presentation Title | Month 2008 All Rights Reserved Alcatel-Lucent 2008, XXXXX
BSS Dimensioning Methods in B10
BSC Dimensioning
Method for PS Traffic
Needed counters for GCH Traffic:
P100c or GAAGCHUST (GPRS_transmission_GCH_busy_time),
P383a or GQAGALCTT (GPRS_GPU_Ater_cong_time),
P384 or GQRGPUCDT (GPRS_GPU_DSP_cong_time),
Needed counters for GSL:
P41 or GTALAPDLN (GPRS_LAPD_DL_traffic_sent_to_BSC),
P42 or GTALAPULN (GPRS_LAPD_UL_traffic_received_from_BSC).
45 | Presentation Title | Month 2008 All Rights Reserved Alcatel-Lucent 2008, XXXXX
BSS Dimensioning Methods in B10
BSC Dimensioning
Method for PS Traffic
Max GCH Traffic
Number of required GCH per BSC
3600
100c P
traffic _ GCH _ Measured =
%
a P
cong _ Ater _ GCH % 100
3600
383
= %
P
cong _ GPU _ GCH % 100
3600
384
=
) cong _ GPU _ GCH ,% cong _ Ater _ GCH (% Max cong _ GCH % =
%) ; cong _ GCH (% Min
traffic _ GCH _ Measured
traffic _ GCH _ quired Re
30 1
=
( ) delay quantile; ; CH_traffic Required_G angC InverseErl GCH quired Re of Nb =
where quantile = 99% and delay = 0.01s
46 | Presentation Title | Month 2008 All Rights Reserved Alcatel-Lucent 2008, XXXXX
BSS Dimensioning Methods in B10
BSC Dimensioning
Method for PS Traffic
Number of GPU/GP boards per BSC
GPU Capacity is of max 480 GCH.
GP Capacity is of max 1560 GCH.
N_ATER_TS_MARGIN_GPU resources must not be taken into account. So, the max
number of GCH per GPU/GP is:
480 N_ATER_TS_MARGIN_GPU*4 (for legacy MFS)
1560 N_ATER_TS_MARGIN_GPU*4 (for Mx MFS)
(
(
(

=
Capacity GCH board GPU/GP
GCH Required of Nb
board GPU/GP quired Re of Nb
47 | Presentation Title | Month 2008 All Rights Reserved Alcatel-Lucent 2008, XXXXX
BSS Dimensioning Methods in B10
BSC Dimensioning
Method for PS Traffic
Number of GSL links per BSC
28800
42 41 ) P , P ( Max
traffic _ GSL _ Measured =
in arg m % traffic _ GSL _ Measured traffic _ GSL _ quired Re 30 + =
( ) delay quantile; ; SL_traffic Required_G angC InverseErl GSL quired Re of Nb =
where quantile = 99% and delay = 0.01s
48 | Presentation Title | Month 2008 All Rights Reserved Alcatel-Lucent 2008, XXXXX
BSS Dimensioning Methods in B10
BSC Dimensioning
Method for PS Traffic
Number of GPU boards per BSC
At least 2 GSLs are recommended to be defined per GPU due to security reason.
Up to 4 GSLs can be defined per GPU.
Number of GP boards per BSC
At least 2 GSLs are recommended to be defined per GP due to security reason.
Up to 8 GSLs can be defined per GP.
(
(
(

=
8
GSL Required of Nb
board GPU/GP quired Re of Nb
(
(
(

=
4
GSL Required of Nb
board GPU/GP quired Re of Nb
49 | Presentation Title | Month 2008 All Rights Reserved Alcatel-Lucent 2008, XXXXX
BSS Dimensioning Methods in B10
BSC Dimensioning
Method for PS Traffic
Number of GPU boards per BSC
The final number of required GPU/GP boards per BSC is the maximum value
between the number of boards needed for signaling traffic (GSL) and for user
traffic (GCH).
50 | Presentation Title | Month 2008 All Rights Reserved Alcatel-Lucent 2008, XXXXX
Ater CS
Dimensioning
4
51 | Presentation Title | Month 2008 All Rights Reserved Alcatel-Lucent 2008, XXXXX
BSS Dimensioning Methods in B10
Ater CS Dimensioning
Target
Find the required number of AterMux CS links
Method: ErlangB
Input (counters values):
CS Traffic
SS7 Traffic
Customer requirements for CS and SS7 blocking and QoS for PS
Output:
Nb of SS7 connections, links and real blocking
Nb of TCH, CS dedicated links and real blocking
52 | Presentation Title | Month 2008 All Rights Reserved Alcatel-Lucent 2008, XXXXX
BSS Dimensioning Methods in B10
Ater CS Dimensioning
Method
Find the max number of Ater CS links between TCH requirements and
signaling requirements (SCCP)
Erlang B
GoS:
% TCH
blocking
Nb of
required SS7
per BSC
INPUT OUTPUT METHOD
Signalling Traffic
User Traffic
Required
SDCCH
Traffic
Required
TCH
Traffic
GoS:
% SS7
blocking
Erlang B
Nb of
required
TCH per BSC
Nb of
required
AterMUX-CS
links per
BSC
Nb of
required
AterMUX-CS
links per
BSC
Choose
Max
value
Final nb of
required
AterMUX-CS
links per
BSC
53 | Presentation Title | Month 2008 All Rights Reserved Alcatel-Lucent 2008, XXXXX
BSS Dimensioning Methods in B10
Ater CS Dimensioning
CS Traffic
Method for TCH
The number of required AterMux CS links can be obtained by dividing the number of
AterMux CS channels obtained from the dimensioning process by the AterMux CS link
capacity.
The total capacity of n AterMUX CS links is:
111TCH(link#1) + 111TCH(link#2) + 116TCH(link#3) + 116TCH(link#4) +
116TCH(link#5) + 116TCH(link#6) + 115TCH(link#7) + 115TCH (link#8) + 116TCH(link
#9) + 116TCH(link #10) + 116TCH(link #11)+ + 116TCH(link #N),
where N =< MaxNbAterMuxCS.
3600
380 380 b MC a MC
traffic _ TCH _ Measured
+
=
in arg m % traffic _ TCH _ measured traffic _ TCH _ quired Re 15 + =
( ) ;0.1% CH_traffic Required_T angB InverseErl channels TCH quired Re of Nb =
54 | Presentation Title | Month 2008 All Rights Reserved Alcatel-Lucent 2008, XXXXX
BSS Dimensioning Methods in B10
Ater CS Dimensioning
CS Signaling Traffic
Method for SCCP
Measured SCCP Traffic = SCCP traffic in Erlang during Busy Hour =
= ((MC400/MC390)*(MC01+MC02+MC10) + (MC380a+MC380b))/3600
The result is obtained for 40% load at SS7 link level.
The final number of required AterMux CS links is the maximum value between the
number of links needed for signaling traffic (SS7) and for user traffic (TCH).
in arg m % traffic _ SCCP _ measured traffic _ SCCP _ quired Re 15 + =
( ) c;0.1% CCP_traffi Required_S angB InverseErl s connection SCCP quired Re of Nb =
(
(
(

=
103
7
channels _ SCCP _ required _ No
links _ SS _ required _ No
55 | Presentation Title | Month 2008 All Rights Reserved Alcatel-Lucent 2008, XXXXX
BSS Dimensioning Methods in B10
Ater CS Dimensioning
CS Signaling Traffic
Method for SS7 based on volume of data transferred
Counters for N7 at link level (Type 9):
N3.1 (NB_N7_SIF_SIO_SENT)
Number of octets of Signalling Information (SIF) and Service Information Octets
(SIO) transmitted on the N7 SL.
N3.3 (NB_N7_MSU_SENT)
Number of Message Signalling Units (MSU) transmitted on the N7 SL.
N3.4 (NB_N7_SIF_SIO_REC)
Number of octets of Signalling Information Field (SIF) and Service Information
Octets (SIO) received on the N7 SL.
N3.5 (NB_N7_MSU_REC)
Number of Message Signalling Units (MSU) received on the N7 SL.
N3.10 (NB_N7_MSU_DISC_DUE_CONG)
Number Message Signalling Units (MSU) discarded due to a message buffer overflow
caused by an extended period of Signalling Link congestion.
56 | Presentation Title | Month 2008 All Rights Reserved Alcatel-Lucent 2008, XXXXX
BSS Dimensioning Methods in B10
Ater CS Dimensioning
CS Signaling Traffic
Method for SS7 based on volume of data transferred
Traffic evaluation in UL
Counter values must be aggregated for the link set
28800000
3 3 6 1 3
7
. N * . N
traffic _ SS _ Measured
+
=
%) ; cong _ SS (% Min
traffic _ SS _ Measured
traffic _ SS _ quired Re
30 7 1
7
7

=
%
. N . N
. N
cong _ SS % 100
10 3 3 3
10 3
7
+
=
( ) ;0.1% S7_traffic Required_S angB InverseErl TS SS7 quired Re of Nb =
57 | Presentation Title | Month 2008 All Rights Reserved Alcatel-Lucent 2008, XXXXX
BSS Dimensioning Methods in B10
Ater CS Dimensioning
CS Signaling Traffic
Method for SS7 based on volume of data transferred
Traffic evaluation in DL
Counter values must be aggregated for the link set
The final number of SS7 TSs (links) is the max value between the results for
UL and DL.
If this number is greater than 16, HSL usage is mandatory.
28800000
5 3 6 4 3
7
. N * . N
traffic _ SS _ Measured
+
=
in arg m % traffic _ SS _ Measured traffic _ SS _ quired Re 15 7 7 + =
( ) ;0.1% S7_traffic Required_S angB InverseErl TS SS7 quired Re of Nb =
58 | Presentation Title | Month 2008 All Rights Reserved Alcatel-Lucent 2008, XXXXX
BSS Dimensioning Methods in B10
Ater CS Dimensioning
CS Signaling Traffic
Method for SS7 based on volume of data transferred
N7 link efficiency based on couters (in UL):
N3.3 (NB_N7_MSU_SENT)
N3.10 (NB_N7_MSU_DISC_DUE_CONG)
Formula:
N7 efficiency [%] = N3.3/( N3.3+N3.10)*100
N7 link congestion detection:
N1.6 (NB_N7_LINK_FAIL_CONG)
Number of N7 SL failures due to congestion during an extended period of
time.
59 | Presentation Title | Month 2008 All Rights Reserved Alcatel-Lucent 2008, XXXXX
BSS Dimensioning Methods in B10
Ater CS Dimensioning
CS Signaling Traffic
Method for SS7 link load based on volume of data transferred
LSL case
%N7 Utilization in UL = (N3.1 + (6 * N3.3)) / (3600*8,000)
%N7 Utilization in DL = (N3.4 + (6 * N3.5)) / (3600*8,000)
Explanation:
MSU contains 6 bytes (fix part) + SIF&SIO (variable part).
SIF is between 2 and 34 bytes.
SIO is 1 byte.
Note:
1 hour of usage of 1 E1 Time Slot (for N7) = 1hour * 64Kbps =
= 3600s * 8000 bytes/s = 28,800 Kbytes/h
Warning:
The load on one N7 link shall not exceed 40% (recommended).
60 | Presentation Title | Month 2008 All Rights Reserved Alcatel-Lucent 2008, XXXXX
BSS Dimensioning Methods in B10
Ater CS Dimensioning
CS Signaling Traffic
Method for SS7 link load based on volume of data transferred
HSL case
In B10, if HSL is actived, N7 can have 2 different frame formats:
Normal frame format
Extended frame format
Parameter: MTP_Sequence_Number_Format
(MtpSequenceNumberFormat in ACIE AlcatelManagedElementComplex.csv)
Range / default value: (0=Normal, 1=Extended) / 0
Note:
In case of Normal frame format
MSU contains 6 bytes (fix part) + SIF&SIO (variable part).
In case of Extended frame format
MSU contains 9 bytes (fix part) + SIF&SIO (variable part).
61 | Presentation Title | Month 2008 All Rights Reserved Alcatel-Lucent 2008, XXXXX
BSS Dimensioning Methods in B10
Ater CS Dimensioning
CS Signaling Traffic
Method for SS7 link load based on volume of data transferred
HSL case with Normal frame format
%N7 Utilization in UL = (N3.1 + (6 * N3.3)) / (3600*8,000*31)
%N7 Utilization in DL = (N3.4 + (6 * N3.5)) / (3600*8,000*31)
Explanation:
32 TSs of 64Kbps are available for one HSL link.
Note:
1 hour of usage of 1 E1 Time Slot (for N7) = 1hour * 64Kbps =
= 3600s * 8000 bytes/s = 28,800 Kbytes/h
For 32 TS per HSL link we get
3600s * 8000 bytes/s * 31TS = 892,800 Kbytes/h
Warning:
The load on one N7 link shall not exceed 40% (recommended).
62 | Presentation Title | Month 2008 All Rights Reserved Alcatel-Lucent 2008, XXXXX
BSS Dimensioning Methods in B10
Ater CS Dimensioning
CS Signaling Traffic
Method for SS7 link load based on volume of data transferred
HSL case with Extended frame format
%N7 Utilization in UL = (N3.1 + (9 * N3.3)) / (3600*8,000*31)
%N7 Utilization in DL = (N3.4 + (9 * N3.5)) / (3600*8,000*31)
Explanation:
32 TSs of 64Kbps are available for one HSL link.
Note:
1 hour of usage of 1 E1 Time Slot (for N7) = 1hour * 64Kbps =
= 3600s * 8000 bytes/s = 28,800 Kbytes/h
For 32 TS per HSL link we get
3600s * 8000 bytes/s * 31TS = 892,800 Kbytes/h
Warning:
The load on one N7 link shall not exceed 40% (recommended).
63 | Presentation Title | Month 2008 All Rights Reserved Alcatel-Lucent 2008, XXXXX
Ater PS
Dimensioning
5
64 | Presentation Title | Month 2008 All Rights Reserved Alcatel-Lucent 2008, XXXXX
BSS Dimensioning Methods in B10
Ater PS Dimensioning
Target
Find the required number of AterMux PS links
Method: ErlangC
Input (counters values):
PS Traffic
Number of Available GCH
Number of Max Busy GCH
AterMux PS congestion
Customer requirements for PS QoS
Output:
Nb of GCH
Nb of GSL links per BSC and PS real quantile
Nb of PS links per BSC and PS real quantile
65 | Presentation Title | Month 2008 All Rights Reserved Alcatel-Lucent 2008, XXXXX
BSS Dimensioning Methods in B10
Ater PS Dimensioning
Method
Find the max number of Ater PS links between GCH requirements and
signaling requirements (GSL)
QoS:
quantile
delay
INPUT OUTPUT METHOD
User Traffic
Required
GCH
Traffic
Erlang C
Nb of
required
GCH per BSC
Nb of
required PS
links per
BSC
QoS:
quantile
delay
Signaling Traffic
Required
GSL
Traffic
Erlang C
Nb of
required
GSL per BSC
Nb of
required PS
links per
BSC
Choose
Max
value
Final nb of
required
AterMUX-PS
links per
BSC
66 | Presentation Title | Month 2008 All Rights Reserved Alcatel-Lucent 2008, XXXXX
BSS Dimensioning Methods in B10
Ater PS Dimensioning
Method for Ater PS
Needed counters for GCH:
P100c or GAAGCHUST (GPRS_transmission_GCH_busy_time),
P383a or GQAGALCTT (GPRS_GPU_Ater_cong_time),
P384 or GQRGPUCDT (GPRS_GPU_DSP_cong_time),
Needed counters for GSL:
P41 or GTALAPDLN (GPRS_LAPD_DL_traffic_sent_to_BSC),
P42 or GTALAPULN (GPRS_LAPD_UL_traffic_received_from_BSC).
67 | Presentation Title | Month 2008 All Rights Reserved Alcatel-Lucent 2008, XXXXX
BSS Dimensioning Methods in B10
Ater PS Dimensioning
Method for GCH
The number of required GCH
3600
100c P
traffic _ GCH _ Measured =
%
a P
cong _ Ater _ GCH % 100
3600
383
=
%
P
cong _ GPU _ GCH % 100
3600
384
=
) cong _ GPU _ GCH ,% cong _ Ater _ GCH (% Max cong _ GCH % =
%) ; cong _ GCH (% Min
traffic _ GCH _ Measured
traffic _ GCH _ quired Re
30 1
=
( ) delay quantile; ; CH_traffic Required_G angC InverseErl GCH quired Re of Nb =
where quantile = 99% and delay = 0.01s
68 | Presentation Title | Month 2008 All Rights Reserved Alcatel-Lucent 2008, XXXXX
BSS Dimensioning Methods in B10
Ater PS Dimensioning
Method for GCH
The number of required AterMux PS TSs for user traffic
The number of required AterMux PS links for user traffic
(
(
(

=
4
GCH _ required _ Nb
TSs _ AterPS _ required _ Nb
(
(
(

=
28
TSs _ AterPS _ required _ No
links _ AterPS _ required _ Nb
69 | Presentation Title | Month 2008 All Rights Reserved Alcatel-Lucent 2008, XXXXX
BSS Dimensioning Methods in B10
Ater PS Dimensioning
Method for GSL
GSL load checking
It is recommended to increase the number of GSL per GPU if GSL load is greater than
80%.
The final number of required AterMux PS links is the maximum value between
the number of links needed for signaling traffic (GSL) and for user traffic (GCH).
28800
42 41 ) P , P ( Max
traffic _ GSL _ Measured =
in arg m % traffic _ GSL _ Measured traffic _ GSL _ quired Re 30 + =
( ) delay quantile; ; SL_traffic Required_G angC InverseErl GSL quired Re of Nb =
GSL required of Nb
traffic _ GSL _ Measured
GSL _ traffic _ Measured = 1
%
) Erlangs . ( Capacity _ GSL
GSL _ traffic _ Measured
load _ GSL 100
78 0
1

=
=
70 | Presentation Title | Month 2008 All Rights Reserved Alcatel-Lucent 2008, XXXXX
GPU/GP
Dimensioning
6
71 | Presentation Title | Month 2008 All Rights Reserved Alcatel-Lucent 2008, XXXXX
BSS Dimensioning Methods in B10
GPU/GP Dimensioning
Target
Find the load and the required number of AterMux PS links per GPU/GP board
Method: ErlangC
Input (counters values):
PS Traffic
MS context average
MS context max
DSP congestion
GSL traffic
Average & Max CPU load
BSS failures rate
Output:
Max DL GCH Capacity
Max UL GCH Capacity
Max DL PDCH Capacity
Max UL PDCH Capacity
GSL load
MCS usage
72 | Presentation Title | Month 2008 All Rights Reserved Alcatel-Lucent 2008, XXXXX
BSS Dimensioning Methods in B10
GPU/GP Dimensioning
GPU/GP load
Check if GPU/GP board is not overloaded
QoS:
quantile
delay
INPUT
OUTPUT
METHOD
User Traffic
Required
GCH
Traffic
Erlang C Needed
GCH
GCH
capacity
of GPU

+
MS_context_handling (= 0/1)
+
Power_Limitation (= 0/1)
Number
of GPU
boards
73 | Presentation Title | Month 2008 All Rights Reserved Alcatel-Lucent 2008, XXXXX
BSS Dimensioning Methods in B10
GPU/GP Dimensioning
GPU/GP load
GPU/GP board limitation control
Power Limitation Memory Limitation Power Limitation Memory Limitation
Dimensioning
indicators
P76a
P77a
=> P402 (thr )
P392a
P392b
P201 (thr_1)
P202 (thr_2)
P384
QoS
indicators
(TBF establ)
P105e
P105f
UL TBF estab
BSS Failure
P203
P204
P105c
P105d
GPU limitation
PMU PTU
PPC/CPU DSP
MFS parameters:
Thr = PMU_CPU_Overload (Default=95%)
Thr_1 = DSP_Load_Thr_1 (Default=85%)
Thr_2 = DSP_Load_Thr_2 (Default=95%)
CPU Cong BSS Fail DSP Load DSP Cong
74 | Presentation Title | Month 2008 All Rights Reserved Alcatel-Lucent 2008, XXXXX
BSS Dimensioning Methods in B10
GPU/GP Dimensioning
GPU/GP load
User traffic load (GCH)
Needed counters:
P100c or GAAGCHUST (GPRS_transmission_GCH_busy_time),
P383a or GQAGALCTT (GPRS_GPU_Ater_cong_time),
P384 or GQRGPUCDT (GPRS_GPU_DSP_cong_time),
P201 or GTRGPULDLT (GPRS_DSP_CPU_load_time),
P202 or GTRGPULDOLT (GPRS_DSP_CPU_overload_time),
GQRDTELDR (GPRS_DL_TBF_estab_fail_dsp_load_rate)
or P203 / (P91a + P91b + P91c + P91d + P91e + P91f + P505)
GQRUTELDR (GPRS_UL_TBF_estab_fail_dsp_load_rate)
or P204 / (P62a + P62b + P62c - P438c + P507)
75 | Presentation Title | Month 2008 All Rights Reserved Alcatel-Lucent 2008, XXXXX
BSS Dimensioning Methods in B10
GPU/GP Dimensioning
GPU/GP load
Signaling load
Needed counters:
P392a or GTRGPUMCA (GPRS_MS_idle_context_avg),
P392b or GTRGPUM (GPRS_MS_idle_context_max),
P76a or GTRGPUPBA (GPRS_PMU_CPU_power_budget_avg),
P77a or GTRGPUPBM (GPRS_PMU_CPU_power_budget_max),
P402 or GTRGPUOT (GPRS_PMU_overload_time),
GQRDTECCR (GPRS_DL_TBF_estab_fail_cpu_cong_rate)
or P105e / (P91a + P91b + P91c + P91d + P91e + P91f + P505)
GQRUTECCR (GPRS_UL_TBF_estab_fail_cpu_cong_rate),
or P105f / (P62a + P62b + P62c - P438c + P507)
76 | Presentation Title | Month 2008 All Rights Reserved Alcatel-Lucent 2008, XXXXX
BSS Dimensioning Methods in B10
GPU/GP Dimensioning
GPU/GP load
Required number of GPU/GP boards based on user traffic
3600
100c P
traffic _ GCH _ Measured =
%
a P
cong _ Ater _ GCH % 100
3600
383
=
%
P
cong _ DSP _ GCH % 100
3600
384
=
%) ; cong _ GCH (% Min
traffic _ GCH _ Measured
traffic _ GCH _ quired Re
30 1
=
( ) delay quantile; ; CH_traffic Required_G angC InverseErl GCH quired Re of Nb =
% x
) P , P ( Max
load _ DSP % 100
3600
202 201
=
% x
P
overload _ CPU % 100
3600
402
=
) overload _ CPU ,% load _ DSP ,% cong _ DSP ,% cong _ Ater (% Max cong _ GCH % =
where quantile = 99% and delay = 0.01s
77 | Presentation Title | Month 2008 All Rights Reserved Alcatel-Lucent 2008, XXXXX
BSS Dimensioning Methods in B10
GPU/GP Dimensioning
GPU/GP load
Required number of GPU/GP boards based on user traffic
where the GPU board capacity is 480 GCH and the GP board capacity is 1560 GCH.
The result must be compared with the existing number of GPU/GP boards per BSC.
If the required number of GPU/GP boards is less than the existing one, there is no
need for change.
If the required number of GPU/GP boards is greater than the existing one, then the
number of GPU/GP boards per BSC must be increased by one unit.
For a BSC in multi GPU configuration, the method (GCH traffic) may be applied per
each GPU/GP board separately to check the load on each board.
(
(
(

=
Capacity GCH board GPU/GP
GCH Required of Nb
board GPU/GP quired Re of Nb
78 | Presentation Title | Month 2008 All Rights Reserved Alcatel-Lucent 2008, XXXXX
BSS Dimensioning Methods in B10
GPU/GP Dimensioning
GPU/GP load
Required number of GPU/GP boards
GPU power limitation from PTU (DSP/CPU)
If
MAX(P201;P202)/3600 > 0.1% for at least 12% of the observation period
and
dsp_load_fail_rate = MAX(GQRDTELDR; GQRUTELDR) > 1%
then PTU_Power_Limitation = 1
else PTU_Power_Limitation = 0
79 | Presentation Title | Month 2008 All Rights Reserved Alcatel-Lucent 2008, XXXXX
BSS Dimensioning Methods in B10
GPU/GP Dimensioning
GPU/GP load
Required number of GPU/GP boards
GPU power limitation from PMU (CPU)
If
P402/3600 > 0.1% or P76a > 70% for at least 12% of the observation period
and
cpu_cong_fail_rate = MAX (GQRUTECCR; GQRDTECCR) > 1%
then PMU_Power_Limitation = 1
else PMU_Power_Limitation = 0
80 | Presentation Title | Month 2008 All Rights Reserved Alcatel-Lucent 2008, XXXXX
BSS Dimensioning Methods in B10
GPU/GP Dimensioning
GPU/GP load
Required number of GPU/GP boards
GPU memory limitation from PMU (CPU)
If P392b = 1000 and P392a > 900 for at least 12% of the observation period
for Legacy MFS
or
if P392b = 4000 and P392a > 3600 for at least 12% of the observation period
for MxMFS
then MS_context_handling = 1
else MS_context_handling = 0
81 | Presentation Title | Month 2008 All Rights Reserved Alcatel-Lucent 2008, XXXXX
BSS Dimensioning Methods in B10
GPU/GP Dimensioning
GPU/GP load
Final result
The number of required GPU/GP boards =
= Number of required GPU/GP board (from user traffic) +
+ MAX(PTU_Power_Limitation; PMU_Power_Limitation; MS_context_handling)
Note:
If the required number of GPU/GP boards is greater than the existing one, it
is recommanded to add a single board at one time and redo the load
assessment after it.
82 | Presentation Title | Month 2008 All Rights Reserved Alcatel-Lucent 2008, XXXXX
BSS Dimensioning Methods in B10
GPU/GP Dimensioning
Number of AterMux PS links per GPU/GP board
Check the number of links from GCH and GSL requirements
QoS:
quantile
delay
INPUT OUTPUT METHOD
User Traffic
Required
GCH
Traffic
Erlang C
Nb of
required
GCH per BSC
Nb of
required
GPU boards
per BSC
Nb of
required PS
links per
GPU board
QoS:
quantile
delay
Signaling Traffic
Required
GSL
Traffic
Erlang C
Nb of
required
GSL per BSC
Nb of
required PS
links per
GPU board
Choose
Max
value
Final nb of
required
AterMUX-PS
links per
GPU

83 | Presentation Title | Month 2008 All Rights Reserved Alcatel-Lucent 2008, XXXXX
BSS Dimensioning Methods in B10
GPU/GP Dimensioning
Number of AterMux PS links per GPU/GP board
Based on total GCH load and final number of required GPU/GP bords, the
number of Ater PS links per board is:
(
(
(

=
board GP / GPU _ required _ Nb
/ ) GCH _ required _ Nb (
GP / GPU _ per _ links _ AterPS _ required _ Nb
112
84 | Presentation Title | Month 2008 All Rights Reserved Alcatel-Lucent 2008, XXXXX
BSS Dimensioning Methods in B10
GPU/GP Dimensioning
Number of AterMux PS links per GPU/GP board
Method based on total number of GSL links and final number of required
GPU/GP bords
OUTPUT
Nb of
required
GSL links
per GPU
INPUT METHOD
QoS:
quantile
delay
Signaling Traffic
Required
GSL
Traffic
Erlang C
Nb of
required
GSL per BSC
Nb of
required
GPU boards
per BSC

85 | Presentation Title | Month 2008 All Rights Reserved Alcatel-Lucent 2008, XXXXX
BSS Dimensioning Methods in B10
GPU/GP Dimensioning
Number of AterMux PS links per GPU/GP board
Assessment based on GSL bandwidth
Needed counters:
P41 or GTALAPDLN (GPRS_LAPD_DL_traffic_sent_to_BSC),
P42 or GTALAPULN (GPRS_LAPD_UL_traffic_received_from_BSC).
Required number of GSL links per BSC:
28800
42 41 ) P , P ( Max
traffic _ GSL _ Measured =
in arg m % traffic _ GSL _ Measured traffic _ GSL _ quired Re 30 + =
( ) delay quantile; ; SL_traffic Required_G angC InverseErl GSL quired Re of Nb =
where quantile = 99% and delay = 0.01s
86 | Presentation Title | Month 2008 All Rights Reserved Alcatel-Lucent 2008, XXXXX
BSS Dimensioning Methods in B10
GPU/GP Dimensioning
Number of AterMux PS links per GPU/GP board
Assessment based on GSL bandwidth
Checking the GSL load:
GSL link load is:
Compare GSL_load with GSL_link_band_capacity
where GSL_link_band_Capacity = 0.78 Erlang
(corresponding to max rate of 50 Kbps in a 64 Kbps Time slot).
GSL load on a given GPU/GP should not exceed 0.78 Erlang.
It is recommended to increase the number of GSL per GPU/GP if GSL load is greater
than 0.78 Erlang.
links GSL required of Nb
traffic _ GSL _ Measured
load _ GSL =
87 | Presentation Title | Month 2008 All Rights Reserved Alcatel-Lucent 2008, XXXXX
BSS Dimensioning Methods in B10
GPU/GP Dimensioning
Number of AterMux PS links per GPU/GP board
Assessment based on the number of GSL messages per second
Number of GSL messages/s per GPU is calculated as a function of PS traffic (UL and
DL TBF establish requests) and of the number of cells mapped to the GPU/GP.
GSL_link_Max_capacity per GPU is defined as:
K_GSL * (1000ms/GSL_round_trip_delay) * Nb of GSL links per GPU/GP, where
K_GSL is the maximum number of outstanding I frames on a GSL link
(Min = 1, Max = 32, Default = 7)
For terrestrial links: GSL_round_trip_delay < 500ms
(default value = 60ms)
For satellite links: GSL_round_trip_delay > 500ms
(default value = 500ms)
BSC
GPU
K_GSL
GSL messages
buffer
GSL_round_trip_delay
A message is kept in the buffer
during GSL_round_trip_delay
88 | Presentation Title | Month 2008 All Rights Reserved Alcatel-Lucent 2008, XXXXX
BSS Dimensioning Methods in B10
GPU/GP Dimensioning
Number of AterMux PS links per GPU/GP board
Assessment based on the number of GSL messages per second
How to estimate the number of GSL messages per second:
Msg on GSL due to RAE4 mechanism 0.3 Msg/s x Nb_cell
Msg on GSL due to PS traffic
Msg on GSL due to PS/CS paging: Nb_PS_paging/s+ Nb_CS_paging/s
Msg on GSL due to PS data traffic (TBF requests):
TBF (UL & DL) corresponding to RA update 1.7 x Nb_TBF_Sig_req/s
TBF (UL & DL) corresponding to PS data (3 cases)
Low GSL usage (eg. Ping 5 s) 2.5
Medium GSL usage 3.5 x Nb_TBF_Data_req/s
High GSL usage (worst case) 5
The Sum of all rates above gives the Total Nb of Msg/s.
89 | Presentation Title | Month 2008 All Rights Reserved Alcatel-Lucent 2008, XXXXX
BSS Dimensioning Methods in B10
GPU/GP Dimensioning
Number of AterMux PS links per GPU/GP board
Assessment based on the number of GSL messages per second
The GSL usage condition can be defined through the following table:
The values provided in the table above are relibale if T_GCH_INACTIVITY = 3s and
T_GCH_INACTIVITY_LAST = 20s (default setting).
Otherwise (I.e. T_GCH_INACTIVITY = 2s and T_GCH_INACTIVITY_LAST = 6s) GSL load will be
greater due to the consequent increase of deallocation/allocation messages.
3.5 2.5 Low
5 3.5 High Available
GCH
Low High
PS traffic
(TBF req)
Nb of Msg on GSL
per TBF_data_req
If #TBF req /s < 20 TBF/s
If Ater congestion observed
90 | Presentation Title | Month 2008 All Rights Reserved Alcatel-Lucent 2008, XXXXX
BSS Dimensioning Methods in B10
GPU/GP Dimensioning
Number of AterMux PS links per GPU/GP board
Assessment based on the number of GSL messages per second
Nb_cell: number of cell (at BSC level or managed by the GPU, depending if the
method is applied at BSC or GPU level)
Nb_PS_paging: number of processed PS paging requests/s is measured by
P391a/3600
Nb_CS_paging: number of processed CS paging requests/s is measured by P391b/3600
Nb_UL_TBF_req: the total number of UL TBF requests/s
(P62a+P62b+P62c-P438c+P507)/3600
Nb_DL_TBF_req: the total number of DL TBF requests/s
(P91a+P91b+P91c+P91d+P91e+P91f+P505)/3600
Nb_UL_TBF_req_noGSL: number of UL TBF requests/s which will not generate any
message on the GSL is counted by P62b.
91 | Presentation Title | Month 2008 All Rights Reserved Alcatel-Lucent 2008, XXXXX
BSS Dimensioning Methods in B10
GPU/GP Dimensioning
Number of AterMux PS links per GPU/GP board
Assessment based on the number of GSL messages per second
Nb_TBF_Sig_req: the number of TBF (UL and DL)/s which correspond to signalling
traffic. The part of DL TBF signalling requests is estimated with %_DL_TBF_Sig_req =
P160 / Nb_DL_TBF_succ.
where P160 = NB_DL_TBF_1_succ (Number of DL TBF establishment requests
requesting 1 slot which are satisfied) and
Nb_DL_TBF_succ = P90a+P90b+P90c+P90d+P90e+P90f+P506. So,
Nb_TBF_Sig_req = %_DL_TBF_Sig_req x (Nb_UL_TBF_req - Nb_UL_TBF_req_noGSL +
Nb_DL_TBF_req)
Nb_TBF_Data_req: the number of TBF (UL and DL)/s which correspond to data
traffic.
Nb_TBF_Data_req = Nb_UL_TBF_req + Nb_DL_TBF_req - Nb_UL_TBF_req_noGSL -
Nb_TBF_Sig_req
92 | Presentation Title | Month 2008 All Rights Reserved Alcatel-Lucent 2008, XXXXX
BSS Dimensioning Methods in B10
GPU/GP Dimensioning
Number of AterMux PS links per GPU/GP board
Assessment based on the number of GSL messages per second
GSL load (in terms of treated messages)
GSL load in terms of treated messages per second on a given GPU/GP should not
exceed 75%
It is recommended to increase the number of GSL per GPU/GP if GSL load is greater
than 75%.
%
Capacity _ Max _ Link _ GSL
sec _ per _ messages _ GSL _ Nb
load _ GSL 100 =
93 | Presentation Title | Month 2008 All Rights Reserved Alcatel-Lucent 2008, XXXXX
BSS Dimensioning Methods in B10
GPU/GP Dimensioning
Number of AterMux PS links per GPU/GP board
Based on total GSL load and final number of required GPU/GP bords, the
number of GSL links per board is:
If the result is greater than 4 (8), we must increase the number of GPU (GP)
boards with 1, and redo the calculations.
The final number of required AterMux PS links per GPU/GP boards is the
maximum value between the number of links needed for signaling traffic
(GSL) and for user traffic (GCH).
(
(
(

=
board GPU/GP quired Re of Nb
BSC per GSL Required of Nb
GPU/GP per GSL quired Re of Nb
94 | Presentation Title | Month 2008 All Rights Reserved Alcatel-Lucent 2008, XXXXX
Gb Interface
Dimensioning
7
95 | Presentation Title | Month 2008 All Rights Reserved Alcatel-Lucent 2008, XXXXX
BSS Dimensioning Methods in B10
Gb Interface Dimensioning
Gb over Frame Relay
Target
Find the required number of Gb TS
Input (counters values):
PVC downlink Traffic
PVC uplink Traffic
PVC downlink average throughput
PVC uplink average throughput
Customer requirements for QoS (delay and quantile)
Output:
Nb of Gb TS
96 | Presentation Title | Month 2008 All Rights Reserved Alcatel-Lucent 2008, XXXXX
BSS Dimensioning Methods in B10
Gb Interface Dimensioning
Gb over Frame Relay
Method: ErlangC
Needed counters:
P45 or GTGPVCDLN (GPRS_PVC_DL_traffic_from_SGSN),
P46 or GTGPVCULN (GPRS_PVC_UL_traffic_to_SGSN).
Erlang C
Required Gb
Traffic
QoS:
% Quantile of x
delay sec
Nb of required
Gb Timeslot per
link
INPUT OUTPUT METHOD
97 | Presentation Title | Month 2008 All Rights Reserved Alcatel-Lucent 2008, XXXXX
BSS Dimensioning Methods in B10
Gb Interface Dimensioning
Gb over Frame Relay
The required Gb traffic is:
The required number of Gb TS is:
The maximum number of Gb links from one GPU/GP board to the SGSN is 8.
Maximum 31 Gb TS (TS no. 1 to 31) can be configured per one Gb link.
28800
46 45 ) P , P max(
traffic _ Gb _ Measured =
in arg m % traffic _ Gb _ Measured traffic _ Gb _ quired Re 15 + =
) delay ; quantile ; traffic _ Gb _ quired (Re ErlangC link _ per _ TS _ Gb _ No =
where quantile = 99% and delay = 0.01s
98 | Presentation Title | Month 2008 All Rights Reserved Alcatel-Lucent 2008, XXXXX
BSS Dimensioning Methods in B10
Gb Interface Dimensioning
Gb over Frame Relay
The Gb over FR configuration
Parameters:
Tc (Measurement interval) = 1s
CBS (Committed Burst Size)
CIR (Committed Information Rate)
CIR = (CBS*8)/Tc
NIR (Normal Information Rate)
NIR CIR
EBS (Excess Burst Size)
EIR (Excess Information Rate)
EIR = CIR+EBS*8/Tc
AC (Access Rate Bearer Channel)
AC CIR(1+EBS/CBS)
NbGbTS = AC/64kbps
Tc
EBS
CBS
Bit rate
time
EIR
CIR
NIR
ACCESS_RATE_BC
99 | Presentation Title | Month 2008 All Rights Reserved Alcatel-Lucent 2008, XXXXX
BSS Dimensioning Methods in B10
Gb Interface Dimensioning
Gb over Frame Relay
The Gb over FR configuration
Rules if no direct access is used between MFS and SGSN:
CIR NIR CIR x (1 + EBS/CBS) ACCESS_RATE_BC
Example:
number 16 NbGbTS
kbps 1008 AC
kbps 1008 EIR
kbyte 2 EBS
kbps 992 NIR
kbps 992 CIR
kbyte 124 CBS
s 1 Tc
unit value Parameter
100 | Presentation Title | Month 2008 All Rights Reserved Alcatel-Lucent 2008, XXXXX
BSS Dimensioning Methods in B10
Gb Interface Dimensioning
Gb over Frame Relay
The Gb over FR configuration
Rules if direct access is used between MFS and SGSN:
CIR = 0 <=> CBS = 0 => EBS > 0 (mandatory)
NIR = 0 (recommanded)
EBS = ACCESS_RATE_BC (expressed in kbit/s)/8, if CIR = 0 (recommanded)
Example:
For CBS = 0; CIR = 0 and NIR = 0:
number 20 NbGbTS
kbps 1280 EIR
kbps 1280 AC
kbyte 160 EBS
s 1 Tc
unit value Parameter
101 | Presentation Title | Month 2008 All Rights Reserved Alcatel-Lucent 2008, XXXXX
BSS Dimensioning Methods in B10
Gb Interface Dimensioning
Gb over IP
Using Gigabit Ethernet link to the aggregation Router, the max load is:
For MxMFS: 1560 GCHperGP * 16 Kbps = 24.96 Mbps
Assuming all this traffic coming from SGSN for one MxMFS with 21 GP boards we get:
21 boards*24.96 Mbps = 524.16 Mbps Half of the GigaEthernet link capacity
For Legacy MFS: 480 GCHperGPU * 16 Kbps = 7.68 Mbps
Assuming all this traffic coming from SGSN for one MFS DS10 with 30 GPU boards we
get:
30 boards*7.68 Mbps = 230.4 Mbps Quarter of the GigaEthernet link capacity
Congestion is not expected at the level of the link to the aggregation router.
Any Congestion seen afterwards is dependent on bandwidth management of the
core IP network.
102 | Presentation Title | Month 2008 All Rights Reserved Alcatel-Lucent 2008, XXXXX
BSS Dimensioning Methods in B10
Gb Interface Dimensioning
Gb over IP
Target
Find the DL and UL traffic during BH
Input (counters values):
Ip Endpoint downlink data volume
Ip Endpoint uplink data volume
Output:
DL and UL data rate
Counters in the MFS
New counters per IP Endpoint are defined in case of GboIP:
P34a (TIME_SGSN_IP_ENDPOINT_NOT_AVAIL_GBIP),
P45a (NB_KBYTES_RECEIVED_FROM_SGSN_GBIP),
P46a (NB_KBYTES_SENT_TO_SGSN_GBIP).
103 | Presentation Title | Month 2008 All Rights Reserved Alcatel-Lucent 2008, XXXXX
BSS Dimensioning Methods in B10
Gb Interface Dimensioning
Gb over IP
Data rate calculation in DL (SGSN to MFS) and in UL (MFS to SGSN)
Data rate DL/UL, at IP Endpoint level or aggregated at GP or MFS level:
DL Data rate [Kbps] = 1.233*(P45a*8 )/(3600-P34a)
UL Data rate [Kbps] = 1.233*(P46a*8)/(3600-P34a)
Explanation:
Assuming LLC PDU and BSSGP payload are 300 bytes, NS, UDP, IP and Fast Ethernet
overhead are 70 bytes (i.e. 4+28+38),
SNS layer (where Kbytes counts is done) overhead ratio at this layer is 0.23% (i.e.
70/300).
104 | Presentation Title | Month 2008 All Rights Reserved Alcatel-Lucent 2008, XXXXX
BSS Dimensioning Methods in B10
Gb Interface Dimensioning
Gb over IP
GboIP traffic estimation based on actual GboFR traffic
Estimated Traffic:
Estimated DL IP Data rate [Kbps] = (370/306)*(P45*8)/(3600-P34)
Estimated UL IP Data rate [Kbps] = (370/306)*(P46*8)/(3600-P34)
Explanation:
Assuming LLC PDU and BSSGP payload are 300 bytes, NS, UDP, IP and Fast Ethernet
overhead are 70 bytes (i.e. 4+28+38), NS and FR overhead are 6 bytes (i.e. 4+2).
Packet size increase ratio = Total IP packet (i.e. 370) / Total FR packet (i.e. 306)
105 | Presentation Title | Month 2008 All Rights Reserved Alcatel-Lucent 2008, XXXXX
Location Area
Dimensioning
8
106 | Presentation Title | Month 2008 All Rights Reserved Alcatel-Lucent 2008, XXXXX
BSS Dimensioning Methods in B10
Location Area Dimensioning
Location Area definition
Set of cells which are paged each time one Terminating Call is initiated
Specified with a unique Location Area Code (LAC)
Position of each MS in a specific Location Area stored in HLR / VLR
MS tells mobile network (using SDCCH resources)
when it moves from one LAC to another (Location Update)
periodically its current LAC position (Periodical LU)
Location Area size
Trade off between
Signalling load in cells located at LAC border
SDCCH resources in each cell has to be sized accordingly
Number of simultaneous pagings in each cell of the LAC
All MS in LAC and in MT call are paged simultaneously
107 | Presentation Title | Month 2008 All Rights Reserved Alcatel-Lucent 2008, XXXXX
BSS Dimensioning Methods in B10
Location Area Dimensioning
CCCH Sharing
Air interface
Pagings sent in DL on CCCH
Sharing between PCH & AGCH within one CCCH M-51 frame (235 mS
duration)
CCCH_CONF
Combined mode 3 blocks
Non combined mode 9 blocks
Nb of AGCH blocks = BS_AG_BLKS_RES
Nb of PCH blocks = Nb of total CCCH blocks - BS_AG_BLKS_RES
6 CCCH blocks are available for the PCH Reserved for AGCH
CCCH 8 CCCH 7 CCCH 6 CCCH 5 CCCH 4 CCCH 3 CCCH 2 CCCH 1 CCCH 0
Example of AGCH and PCH organisation when BS_AG_BLKS_RES = 3 (Non combined mode)
108 | Presentation Title | Month 2008 All Rights Reserved Alcatel-Lucent 2008, XXXXX
BSS Dimensioning Methods in B10
Location Area Dimensioning
PCH content
Air interface
Nb of pagings per CCCH block, depends on
Paging request type
Subscribers behavior (mobile often on/off)
Paging efficiency
between 1.5 3
2.5 pagings / PCH block considered usually in dimensioning
TYPE 1 TYPE 2 TYPE 3
- IMSI
- (P)TMSI
- IMSI,IMSI
- IMSI, (P)TMSI
- (P)TMSI, (P)TMSI
- (P)TMSI, (P)TMSI, (P)TMSI
- (P)TMSI, (P)TMSI,IMSI
- (P)TMSI, (P)TMSI, (P)TMSI, (P)TMSI

109 | Presentation Title | Month 2008 All Rights Reserved Alcatel-Lucent 2008, XXXXX
BSS Dimensioning Methods in B10
Location Area Dimensioning
PCH content
BTS
BSC
Cell
MS
GPU
MFS
TC
MSC
SGSN
Abis
AterMUX-PS
AterMUX-CS
Gb
A
Paging request
message
(type 1, 2 or 3)
Paging command
Message
(RSL)
Paging command
or
Immediate assign
command message
(RSL)
PCH blocks
on CCCH
CS Paging
(SS7)
(GSL)
PS/CS Paging
or
Channel assignment
downlink message
Paging request
or
Packet downlink
assignment
message
Gs
110 | Presentation Title | Month 2008 All Rights Reserved Alcatel-Lucent 2008, XXXXX
BSS Dimensioning Methods in B10
Location Area Dimensioning
PCH capacity
Non-Combined cell
BS_AG_BLKS_RES = 4 (AGCH blocks) 9 - 4 = 5 PCH blocks (default configuration)
5 PCH blocks/Multiframe * (3600s / 235 ms) =
76 594 PCH blocks/ hour
2.5 paging / Block x 76 594 Blocks =
191 485 paging/hour at 100% load
If 60 % engineering limit applied: 114 891 paging/hour
31.91 paging/s
111 | Presentation Title | Month 2008 All Rights Reserved Alcatel-Lucent 2008, XXXXX
BSS Dimensioning Methods in B10
Location Area Dimensioning
PCH capacity
Combined cell
BS_AG_BLKS_RES = 1 3 - 1 = 2 PCH blocks
2 PCH blocks/Multiframe x (3600s / 235 ms) =
30 638 PCH blocks/ hour
2.5 paging / Block x 30 638 Blocks =
76 595 paging/hour at 100% load
If 60 % engineering limit applied: 45 957 paging/hour
12.76 paging/s
112 | Presentation Title | Month 2008 All Rights Reserved Alcatel-Lucent 2008, XXXXX
BSS Dimensioning Methods in B10
Location Area Dimensioning
AGCH content
BTS
BSC
Cell
MS
GPU
MFS
Abis
AterMUX-PS
Access grant
message
(IA, IAE or IAR)
Immediate assign
command message
(RSL)
Immediate assign
command message
(RSL)
AGCH blocks
on CCCH
Immediate assignment
or
Immediate assignment
reject message
Access grant
message
(PUA, PDA or IAR)
(GSL)
Channel assignment uplink
(EGPRS Uplink assign.),
Channel assignment downlink
(Downlink assign.)
or
Channel assignment uplink
message (Assign. reject)
Note: IA= Immediate Assign; IAE=Immediate Assign Extended; IAR= Immediate Assign Reject;
PUA= Packet Uplink Assignment; PDA= Packet Downlink Assignment.
113 | Presentation Title | Month 2008 All Rights Reserved Alcatel-Lucent 2008, XXXXX
BSS Dimensioning Methods in B10
Location Area Dimensioning
AGCH capacity
Non-Combined cell
BS_AG_BLKS_RES = 4
4 AGCH blocks/Multiframe x (3600s / 235 ms) =
61 272 AGCH blocks/ hour
1 Immediate Assign message / Block x 61 272 Blocks =
61 272 paging/hour at 100% load
If 60 % engineering limit applied: 36 763 IA message/hour
10.21 IA message/s
AGCH efficiency: between 1 2 (2 if Immediate Assign Extended)
1 Immediate Assign message / AGCH block used usually in dimensioning
114 | Presentation Title | Month 2008 All Rights Reserved Alcatel-Lucent 2008, XXXXX
BSS Dimensioning Methods in B10
Location Area Dimensioning
AGCH capacity
Combined cell
BS_AG_BLKS_RES = 1
1 AGCH block/Multiframe x (3600s / 235 ms) =
15 318 AGCH blocks/ hour
1 Immediate Assign message / Block x 15 318 Blocks =
15 318 paging/hour at 100% load
If 60 % engineering limit applied: 9 180 IA message/hour
2.55 IA message/s
115 | Presentation Title | Month 2008 All Rights Reserved Alcatel-Lucent 2008, XXXXX
BSS Dimensioning Methods in B10
Location Area Dimensioning
AGCH and PCH capacity
Non-Combined cell

PCH
blocks
AGCH
blocks
Paging
Request/s
(PCH
blocks/s)
Access
Grant
msgs/s
(AGCH
blocks/s)
Paging
msgs/s at
60% limit
ImmAs
msgs/s at
60% limit
PCH
msgs/h at
60% limit
ImmAs
msgs/h at
60% limit
Total #
msgs
sent/h at
60% limit
6 3 25.53 12.75 38.29 7.65 137851 27540 165391
5* 4 21.27 17.02 31.91 10.21 114893 36763 151656
4** 5 17.02 21.27 25.53 12.76 91908 45936 137844
Notes: * Alcatel recommended default configuration.
** Recommended for 16 TRX cells with CS only.
116 | Presentation Title | Month 2008 All Rights Reserved Alcatel-Lucent 2008, XXXXX
BSS Dimensioning Methods in B10
Location Area Dimensioning
B9 limitations
Abis interface limitation
max paging load of 33 paging commands per second = 118 800 paging/hour
G2 BSC limitation
max paging load of 70 paging commands per second = 252 000 paging/hour
MxBSC limitation
max paging load of 95 paging commands per second = 342 000 paging/hour
117 | Presentation Title | Month 2008 All Rights Reserved Alcatel-Lucent 2008, XXXXX
BSS Dimensioning Methods in B10
Location Area Dimensioning
Location Area dimensioning in B9
G2 BSC:
MxBSC:
2 Location Areas
with an average of
132 cells per LA
3 Location Areas
with an average of
88 cells per LA
G2 BSC
(max 264 cells)
A Abis
70 paging/s 33 paging/s
LA
LA
Mx BSC
(max 264 cells)
A Abis
95 paging/s 33 paging/s
LA
LA
LA
118 | Presentation Title | Month 2008 All Rights Reserved Alcatel-Lucent 2008, XXXXX
BSS Dimensioning Methods in B10
Location Area Dimensioning
B10 limitations
Abis interface limitation
max paging load of 33 paging commands/second 118 800 paging/hour
max paging load of 66 paging commands/second 237 600 paging/hour with mCCCH
G2 BSC limitation
max paging load of 70 paging commands/second = 252 000 paging/hour
MxBSC limitation
max paging load of 120 paging commands/second= 432 000 paging/h
(expected in B10)
119 | Presentation Title | Month 2008 All Rights Reserved Alcatel-Lucent 2008, XXXXX
BSS Dimensioning Methods in B10
Location Area Dimensioning
B10 limitations
CCCH capacity in B10 with mCCCH
(rounded figures)
Nb CCCH TS BS_AG_BLKS_RES

PCH blocks AGCH blocks Max paging/s
at 60% load
Max assign/s
at 60% load
1 3 6 3 38 7
1 4 5 4 32 10
1 5 4 5 25 12
2 3 12 6 76 15
2 4 10 8 63 20
2 5 8 10 51 25
2 6 6 12 38 31

120 | Presentation Title | Month 2008 All Rights Reserved Alcatel-Lucent 2008, XXXXX
BSS Dimensioning Methods in B10
Location Area Dimensioning
Location Area dimensioning in B10
G2 BSC without mCCCH:
1 Location Area with
up to 264 cells per
LA
G2 BSC with mCCCH:
G2 BSC
(max 264 cells)
A Abis
70 paging/s 33 paging/s
LA
LA
2 Location Areas
with an average of
132 cells per LA
G2 BSC
(max 264 cells)
A Abis
70 paging/s 66 paging/s
LA
121 | Presentation Title | Month 2008 All Rights Reserved Alcatel-Lucent 2008, XXXXX
BSS Dimensioning Methods in B10
Location Area Dimensioning
Location Area dimensioning in B10
MxBSC without mCCCH:
4 Location Areas
with an average of
125 cells per LA
2 Location Areas
with an average of
250 cells per LA
Mx BSC
(max 500 cells)
A Abis
120 paging/s 2 CCCH
66 paging/s
LA
LA
Mx BSC
(max 500 cells)
A Abis
120 paging/s 1 CCCH
33 paging/s
LA
LA
LA
LA
MxBSC with mCCCH:
122 | Presentation Title | Month 2008 All Rights Reserved Alcatel-Lucent 2008, XXXXX
BSS Dimensioning Methods in B10
Location Area Dimensioning
Location Area dimensioning in B10
There is no relationship between the BSC paging mechanism and CCCH
configuration.
The BSC has just the task of broadcasting paging messages per LAC.
If paging coming from MSC has a high rate, the BSC will send on Abis paging
commands at high speed, ignoring the fact that some cells are not able to
send it.
As a consequence, some paging commands shall be discarded by cells with
less radio capacity compared with BSC capacity for sending paging on Abis.
123 | Presentation Title | Month 2008 All Rights Reserved Alcatel-Lucent 2008, XXXXX
BSS Dimensioning Methods in B10
Location Area Dimensioning
Location Area dimensioning in B10
The Paging load must be assessed during busy hour.
If the paging rate on Abis doesnt exceed 33 paging/s, cells with 1 CCCH TS
may be used without loses.
If the paging rate is higher (up to 66 paging/s), all the cells in LAC should be
configured with 2 CCCH TS, to avoid paging messages to be discarded.
If the paging rate per LAC is higher than 66 paging/s, the LAC should be split.
124 | Presentation Title | Month 2008 All Rights Reserved Alcatel-Lucent 2008, XXXXX
BSS Dimensioning Methods in B10
Location Area Dimensioning
Dimensioning Target
Verify if the Location Area size is OK
Method:
Check the BSC and Abis limits
Check the related parameters
Check the load on CCCH (PCH, AGCH, RACH)
Input (counter values):
Paging rate, Nb of paging messages discarded, PS Paging rate, AGCH load, Nb of IA
messages discarded
Output
Location area load
125 | Presentation Title | Month 2008 All Rights Reserved Alcatel-Lucent 2008, XXXXX
BSS Dimensioning Methods in B10
Location Area Dimensioning
Method for Location area:
Needed telecom parameters:
BS_AG_BLKS_RES
CCCH_CONF
Needed counters for PCH and AGCH:
MC8a = NB_CELL_PAGING_CMD
MC8b = NB_CELL_IMM_ASS_CMD
MC8d = NB_CELL_IMM_ASS_REJ
P49 = NB_IMM_ASS_AGCH
MC27 = CCCH_TS_Cell_available
126 | Presentation Title | Month 2008 All Rights Reserved Alcatel-Lucent 2008, XXXXX
BSS Dimensioning Methods in B10
Location Area Dimensioning
Method for Location area:
New counters for CCCH in B10:
MC925a = NB_AGCH_USEFUL_BLOCKS_SENT
MC925b = NB_PCH_USEFUL_BLOCKS_SENT
MC925c = NB_BUSY_RACH_SLOTS
MC925d = NB_CHANNEL_RQ_RADIO
MC925e = NB_ASSIGN_CMD_RECEIVED_ABIS
MC925f = NB_ASSIGN_CMD_DISCARDED
MC925g = NB_PAGING_CMD_RECEIVED_ABIS
MC925h = NB_PAGING_CMD_DISCARDED
MC930 = NB_ABIS_PAGING_MESSAGE_RECEIVED
127 | Presentation Title | Month 2008 All Rights Reserved Alcatel-Lucent 2008, XXXXX
BSS Dimensioning Methods in B10
Location Area Dimensioning
Method for Location area:
B9 Method
Total MC8a > 252000
(Total for all LA in the BSC)
Re-Design LA, and/or
Reduce nb of LA per BSC
All Cells in a LA are non-combined
MC8a > 57,446 MC8a >114,891
Yes
No
No
No
No Yes Yes
Yes
OK
OK
Re-Design LA Change to non-combined
Re-Design LA
Check BSC Limitation
Check Um Limitation
This value represents G2 BSC limit.
For MX BSC the limit is 342 000.
This value represents 60%
of PCH channel capacity.
128 | Presentation Title | Month 2008 All Rights Reserved Alcatel-Lucent 2008, XXXXX
BSS Dimensioning Methods in B10
Location Area Dimensioning
Method for Location area:
B10 Method
Total MC8a > 252000
(Total for all LA in the BSC)
Re-Design LA, and/or
Reduce nb of LA per BSC
All Cells in a LA are non-combined
MC8a > 57,446 MC8a >114,891
Yes
No
No
No
No Yes Yes
Yes
OK
OK
Re-Design LA Change to non-combined
Re-Design LA
Check BSC Limitation
Check Um Limitation
This value represents G2 BSC limit.
For MX BSC the limit is 432 000.
This value represents 60%
of PCH channel capacity.
This value must be double
in case of 2 CCCH TS.
129 | Presentation Title | Month 2008 All Rights Reserved Alcatel-Lucent 2008, XXXXX
BSS Dimensioning Methods in B10
Location Area Dimensioning
Method for Location area (and Routing Area):
Abis approach
If (CS+PS) Paging load is less than 60% of PCH channel capacity:
The LA size is OK (no overload)
It is possible to keep RA size = LA size
LA
RA
Note:
Total PCH channel capacity is 191 485 paging/hour for 1 CCCH TS and
382 970 paging/hour for 2 CCCH TSs (for BS_AG_BLKS_RES = 4).
(CS+PS) Paging load = MC8a
60% represents engineering limit
130 | Presentation Title | Month 2008 All Rights Reserved Alcatel-Lucent 2008, XXXXX
BSS Dimensioning Methods in B10
Location Area Dimensioning
Method for Location area (and Routing Area):
Abis approach
If (CS+PS) Paging load is greater than 60% of PCH channel capacity and if
PS Paging load/(CS+PS) Paging load is greater than 20% then:
Is necessary to have RA size < LA size, so LA must be splitted in two or more RAs.
Note: (CS+PS) Paging load = MC8a
PS Paging load = P53a
LA
RA1
RA2
RA
131 | Presentation Title | Month 2008 All Rights Reserved Alcatel-Lucent 2008, XXXXX
BSS Dimensioning Methods in B10
Location Area Dimensioning
Method for Location area (and Routing Area):
Abis approach
If (CS+PS) Paging load is still greater than 60% of PCH channel capacity after
PS Paging load/(CS+PS) Paging load has been changed to be under 20%, then:
Is necessary to splitt the initial LA in two or more LAs.
LA
LA1
LA2
132 | Presentation Title | Month 2008 All Rights Reserved Alcatel-Lucent 2008, XXXXX
BSS Dimensioning Methods in B10
Location Area Dimensioning
Method for Location area (and Routing Area):
CCCH frame tuning at cell level
Checking during busy hour
Check BS_AG_BLKS_RES value
Check AGCH load (MC925e/AGCH capacity) and congestion (MC925f/ MC925e)
Check PCH load (MC925g/PCH capacity) and congestion (MC925h/ MC925g)
Tuning
If PCH load is below 60% and no congestion but AGCH load is above 60% and with
congestion => BS_AG_BLKS_RES may be increased by 1.
If PCH load is above 60% and with congestion but AGCH load is below 60% and without
congestion => BS_AG_BLKS_RES may be decreased by 1.
133 | Presentation Title | Month 2008 All Rights Reserved Alcatel-Lucent 2008, XXXXX
www.alcatel-lucent.com
www.alcatel-lucent.com