Item I Surplus Common Excavation:

a.) Actual Volume Accomplished:


From Sta. 5 + 940 to Sta. 6 + 160 = 9 020.95 cu. m.
b.) As per Contract

= 8 533.94 cu. m.

Item II Structure Excavation:


From Sta. 0 + 059 to Sta. 0 + 315 = 215.05 cu. m.
Sta. 0 + 358 to Sta. 0 + 460 = 99.10 cu. m.
Sta. 0 + 838 to Sta. 0 + 999 = 213.58 cu. m.
Sta. 1 + 926

= 10.80 cu. m.

Sta. 2 + 300

= 15.75 cu. m.

Sta. 2 + 323 to Sta. 2 + 480 = 59.33 cu. m.


Sta. 2 + 512 to Sta. 2 + 552 = 56.57 cu. m.
Sta. 2 + 600 to Sta. 2 + 697 = 158.67 cu. m.
Actual Volume Accomplished

= 828.83 cu. m.

As per Contract

= 828.83 cu. m.

Item III Embankment:


From Sta. 0 + 059 to Sta. 0 + 315 = 2286.88 cu. m.
Sta. 0 + 358 to Sta. 0 + 460 = 614.58 cu. m.
Sta. 0 + 852

= 13.40 cu. m.

Sta. 1 + 926

= 87.30 cu. m.

Sta. 2 + 300

= 38.85 cu. m.

Sta. 2 + 323 to Sta. 2 + 433 = 204.38 cu. m.


Sta. 2 + 512 to Sta. 2 + 552 = 216.35 cu. m.
Sta. 2 + 592 to Sta. 2 + 697 = 194.15 cu. m.
Actual Volume Accomplished

= 3 655.89 cu. m.

As per contract

= 3 654.69 cu. m.

Item IV Stone Masonry:


From Sta. 0 + 059 to Sta. 0 + 315 = 361.35 cu. m.
Sta. 0 + 358 to Sta. 0 + 460 = 120.99 cu. m.
Sta. 0 + 838 to Sta. 0 + 999 = 122.78 cu. m.
Sta. 1 + 926

= 37.65 cu. m.

Sta. 2 + 300

= 33.07 cu. m.

Sta. 2 + 323 to Sta. 2 + 433 = 78.39 cu. m.


Sta. 2 + 512 to Sta. 2 + 552 = 122.44 cu. m.
Sta. 2 + 600 to Sta. 2 + 697 = 235.80 cu. m.
Actual Volume Accomplished

= 1 112.47 cu. m.

As per Contract

= 1 111.87 cu. m.

Item V R.C. Pipes


Sta. 0 + 218 --- 1 1.00 m x 9.00 m = 9.00 lin. m.
0 + 240 --- 1 1.00 m x 9.00 m = 9.00 lin. m.
0 + 257.50 --- 1 0.60 m x 4.00 m = 4.00 lin. m.
0 + 270 --- 1 1.00 m x 9.00 m = 9.00 lin. m.
0 + 376 --- 2 1.00 m x 9.00 m = 18.00 lin. m.
0 + 852 --- 1 0.60 m x 8.00 m = 8.00 lin. m.
0 + 852 --- 1 0.60 m x 2.00 m = 2.00 lin. m.
1 + 925 --- 1 0.60 m x 5.00 m = 5.00 lin. m.
2 + 323 --- 1 0.60 m x 4.00 m = 4.00 lin. m.
2 + 663 --- 1 0.60 m x 5.00 m = 5.00 lin. m.
Sta. 5 + 070 --- 1 1.00 m x 9.00 m = 9.00 lin. m.
Actual Accomplished

= 82.00 lin. m.

As per Contract

= 82.00 lin. m.

Item VI SubGrading/ Roadway & Drainage Excavation:


a.) Actual Area Accomplished:
Length = 6.22 km.
= 6 220 m.
Area

= 6 220 x 5
= 31 100.00 sq. m.

b.) As per Contract = 31 100.00 sq. m.

Item VII P.C.C.P.


a.) Actual Area Accomplished:
Area

= 5 m x 152 m.
= 760.00 sq. m.

b.) As per Contract = 750.00 sq. m.

Item VII Construction Safety & Health:

Lump Sum ___________