Professional Documents
Culture Documents
Timesheets 20130726
Timesheets 20130726
Bieber, Howard
Date Tue Tue 7/9/2013 7/9/2013 Start Location MarkWest - Harrison MarkWest - Harrison Start Time 7:00 am 12:25 pm Stop Time Stop Location Cost Code Dig/Pour main frame mats/piers Dig/Pour main frame mats/piers Daily Total Wed 7/10/2013 Wed 7/10/2013 Thu Thu Fri Fri Sat Sat 7/11/2013 7/11/2013 7/12/2013 7/12/2013 7/13/2013 7/13/2013 MarkWest - Harrison MarkWest - Harrison MarkWest - Harrison MarkWest - Harrison MarkWest - Harrison MarkWest - Harrison MarkWest - Harrison MarkWest - Harrison HC - Steelcon shop MarkWest - Harrison MarkWest - Harrison MarkWest - Harrison MarkWest - Harrison 7:00 am 12:29 pm 7:00 am 1:28 pm 7:00 am Dig/Pour main frame mats/piers Erect steel Daily Total Dig/Pour main frame mats/piers Erect steel Daily Total Erect steel Erect steel Daily Total Erect steel Erect steel Daily Total Mon 7/15/2013 Mon 7/15/2013 Mon 7/15/2013 Tue Tue 7/16/2013 7/16/2013 6:00 am 9:41 am 12:27 pm 7:03 am Fab shop / office addition Erect steel Erect steel Daily Total Erect steel Erect steel Total 5.00 4.30 9.30 5.00 4.05 9.05 6.05 3.17 9.22 5.28 4.59 9.87 5.02 3.06 8.08 1.77 2.43 4.47 8.67 4.98 4.47
12:00 pm MarkWest - Harrison 4:32 pm MarkWest - Harrison 1:03 pm MarkWest - Harrison 4:38 pm MarkWest - Harrison
12:17 pm MarkWest - Harrison 12:28 pm 5:03 pm MarkWest - Harrison 12:01 pm MarkWest - Harrison 12:29 pm 3:33 pm MarkWest - Harrison
7:00 am
Page 1 of 15
Bieber, Howard
Date Start Location Start Time Stop Time Stop Location Cost Code Daily Total Wed 7/17/2013 Wed 7/17/2013 MarkWest - Harrison MarkWest - Harrison 6:37 am 12:26 pm Total 9.45 5.37 4.20 Daily Total Thu Thu Fri 7/18/2013 7/18/2013 7/19/2013 MarkWest - Harrison MarkWest - Harrison MarkWest - Harrison 6:42 am 12:26 pm 6:35 am 9.57 5.30 5.17 Daily Total 10.47 9.82 Daily Total Total 9.82 93.50
Dig/Pour main frame mats/piers Dig/Pour main frame mats/piers Dig/Pour main frame mats/piers Erect steel Dig/Pour main frame mats/piers
Dean, Joshua
Date Tue 7/9/2013 Start Location Access Augusta Pipe Rack Kensington Slug Catcher Start Time 7:00 am 7:00 am Stop Time Stop Location Cost Code Total 14.77 Daily Total Wed 7/10/2013 14.77 8.08 Daily Total Thu 7/11/2013 Access Augusta Pipe Rack 7:00 am 8.08 5.97 Daily Total Total 5.97 28.82
9:46 pm Access Augusta Pipe Rack Install pipe bridge 3:05 pm Kensington Slug Catcher
Pipe - field fabrication, positioning
Page 2 of 15
Farmer, Tyler
Date Tue 7/9/2013 Start Location MarkWest - Harrison Start Time 12:31 pm Stop Time Stop Location Cost Code Dig/Pour main frame mats/piers Daily Total Thu Thu 7/11/2013 7/11/2013 Consol Majorsville Compressor bldg. Consol Majorsville Compressor bldg. Consol Majorsville Compressor bldg. Consol Majorsville Compressor bldg. Access Augusta Pipe Rack Access Augusta Pipe Rack HC - Steelcon shop Consol Majorsville Compressor bldg. Consol Majorsville Compressor bldg. Consol Majorsville Compressor bldg. Consol Majorsville Compressor bldg. 7:00 am 1:45 pm Erect steel Erect steel Daily Total Fri Fri 7/12/2013 7/12/2013 7:00 am 1:02 pm Total 4.72 4.72 6.25 3.70 9.95 5.58 3.14 Daily Total Sat Sat 7/13/2013 7/13/2013 Install pipe racks 12:11 pm 12:32 pm 3:59 pm Access Augusta Pipe Rack Install pipe racks 7:02 am Daily Total Mon 7/15/2013 Mon 7/15/2013 Mon 7/15/2013 6:00 am 9:15 am 12:27 pm 8.72 5.15 3.45 8.60 0.13 2.83 3.71 Daily Total Tue Tue 7/16/2013 7/16/2013 7:00 am 1:13 pm 6.67 5.70 2.52 Daily Total
Regular: Created by employee Italics: Created by office Bold: Modified by policy Underline: Auto-generated "Out"
8.22
Page 3 of 15
Farmer, Tyler
Date Wed 7/17/2013 Wed 7/17/2013 Start Location Consol Majorsville Compressor bldg. Consol Majorsville Compressor bldg. Consol Majorsville Compressor bldg. Consol Majorsville Compressor bldg. Consol Majorsville Compressor bldg. Consol Majorsville Compressor bldg. HC - Steelcon shop Consol Majorsville Compressor bldg. Consol Majorsville Compressor bldg. Consol Majorsville Compressor bldg. Start Time 7:00 am 12:57 pm Stop Time Stop Location Cost Code Erect steel Erect steel Daily Total Thu Thu 7/18/2013 7/18/2013 7:00 am 12:37 pm Total 5.27 2.86 8.13 5.00 5.13 Daily Total Fri Fri 7/19/2013 7/19/2013 7:00 am 1:17 pm 10.13 5.73 1.92 Daily Total Mon 7/22/2013 Mon 7/22/2013 Mon 7/22/2013 6:00 am 8:39 am 12:28 pm 7.65 2.65 3.35 8.87 Daily Total Tue 7/23/2013 7:00 am 14.87 9.62 Daily Total Total 9.62 97.28
Erect steel
Frease, Carl
Regular: Created by employee Italics: Created by office Bold: Modified by policy Underline: Auto-generated "Out" Page 4 of 15
Hill, John
Date Tue Tue 7/9/2013 7/9/2013 Start Location HC - Steelcon shop HC - Steelcon shop Start Time 6:00 am 9:12 pm Stop Time Stop Location Cost Code Fab shop / office addition Fab shop / office addition Daily Total Wed 7/10/2013 Wed 7/10/2013 MarkWest - Harrison MarkWest - Harrison 7:00 am 12:27 pm Dig/Pour main frame mats/piers Dig/Pour main frame mats/piers Daily Total Thu Thu 7/11/2013 7/11/2013 MarkWest - Harrison MarkWest - Harrison 7:00 am 1:31 pm Dig/Pour main frame mats/piers Dig/Pour main frame mats/piers Daily Total Fri Fri 7/12/2013 7/12/2013 MarkWest - Harrison MarkWest - Harrison 7:00 am 12:29 pm Dig/Pour main frame mats/piers Dig/Pour main frame mats/piers Daily Total Total 7.12 2.15 9.27 5.03 4.10 9.13 6.08 3.14 9.22 5.32 4.58 9.90
Page 5 of 15
Hill, John
Date Sat Sat 7/13/2013 7/13/2013 Start Location MarkWest - Harrison MarkWest - Harrison Start Time 6:42 am 12:26 pm Stop Time Stop Location Cost Code Dig/Pour main frame mats/piers Dig/Pour main frame mats/piers Daily Total Mon 7/15/2013 Mon 7/15/2013 Mon 7/15/2013 Tue Tue 7/16/2013 7/16/2013 MarkWest - Harrison MarkWest - Harrison MarkWest - Harrison MarkWest - Harrison MarkWest - Harrison MarkWest - Harrison MarkWest - Harrison 6:00 am 8:19 am Dig/Pour main frame mats/piers Erect steel Erect steel Daily Total 6:42 am 12:27 pm 6:30 am 11:26 am Erect steel Erect steel Daily Total Wed 7/17/2013 Wed 7/17/2013 Dig/Pour main frame mats/piers Dig/Pour main frame mats/piers Daily Total Thu Thu 7/18/2013 7/18/2013 MarkWest - Harrison MarkWest - Harrison 6:41 am 12:24 pm Dig/Pour main frame mats/piers Dig/Pour main frame mats/piers Daily Total Fri 7/19/2013 MarkWest - Harrison 6:33 am Dig/Pour main frame mats/piers Daily Total Total 5.42 3.15 8.57 0.42 3.92 4.41 8.75 5.48 4.42 9.90 3.28 5.20 8.48 5.32 5.23 10.55 11.50 11.50
12:14 pm MarkWest - Harrison 12:30 pm 4:55 pm MarkWest - Harrison 12:11 pm 4:52 pm MarkWest - Harrison 9:47 am MarkWest - Harrison 4:38 pm MarkWest - Harrison
Page 6 of 15
Hill, John
Date Mon 7/22/2013 Mon 7/22/2013 Mon 7/22/2013 Start Location MarkWest - Harrison MarkWest - Harrison MarkWest - Harrison Start Time 6:00 am 8:31 am 12:26 pm Stop Time Stop Location Cost Code Dig/Pour main frame mats/piers Dig/Pour main frame mats/piers Dig/Pour main frame mats/piers Daily Total Tue Tue 7/23/2013 7/23/2013 MarkWest - Harrison MarkWest - Harrison 7:00 am 12:27 pm Dig/Pour main frame mats/piers Dig/Pour main frame mats/piers Daily Total Total Total 0.63 3.60 2.90 7.13 5.07 5.83 10.90 113.30
Hughes, Charlie
Date Tue 7/9/2013 Start Location Kensington Slug Catcher Kensington Slug Catcher Kensington Slug Catcher Kensington Slug Catcher Start Time 7:11 am 6:11 am 7:46 am 7:07 am Stop Time Stop Location Cost Code Hydrotest Daily Total Wed 7/10/2013 Fri Tue 7/12/2013 7/16/2013 Hydrotest Daily Total Hydrotest Daily Total Pipe - field fabrication, positioning Daily Total Wed 7/17/2013 Access Augusta Pipe Rack 8:03 am Total 14.58 14.58 7.57 7.57 8.50 8.50 7.95 7.95 7.48
Page 7 of 15
9:46 pm Kensington Slug Catcher 1:45 pm Kensington Slug Catcher 4:16 pm Kensington Slug Catcher 3:04 pm Kensington Slug Catcher
Hughes, Charlie
Date Start Location Start Time Stop Time Stop Location Cost Code Daily Total Total Total 7.48 46.08
Jones, Ed
Date Tue 7/9/2013 Start Location Kensington Slug Catcher Kensington Slug Catcher Kensington Slug Catcher Start Time 7:03 am 6:11 am 7:00 am Stop Time Stop Location Cost Code Hydrotest Daily Total Wed 7/10/2013 Fri 7/12/2013 Hydrotest Daily Total Pipe - field fabrication, positioning Daily Total Mon 7/15/2013 Mon 7/15/2013 Tue 7/16/2013 HC - Steelcon shop Kensington Slug Catcher Kensington Slug Catcher HC - Steelcon shop Access Augusta Pipe Rack Kensington Slug Catcher Access Augusta Pipe Rack 6:00 am 10:28 am 7:01 am 6:06 am 7:32 am 6:44 am Maintenance Touch up paint Daily Total Grout under columns Daily Total Wed 7/17/2013 Wed 7/17/2013 Thu Thu 7/18/2013 7/18/2013 Total 14.78 14.78 7.57 7.57 9.30 9.30 1.05 4.88 5.93 8.05 8.05 0.60 8.03 Daily Total 8.63 3.57 Daily Total 3.57
9:50 pm Kensington Slug Catcher 1:45 pm Kensington Slug Catcher 4:18 pm Kensington Slug Catcher
7:03 am HC - Steelcon shop 3:21 pm Kensington Slug Catcher 3:04 pm Kensington Slug Catcher 6:42 am 3:34 pm
Fab shop / office addition Access Augusta Pipe Rack Install pipe racks
10:18 am Access Augusta Pipe Rack Hydrotest 10:18 am 10:18 am Install pipe bridge
Page 8 of 15
Jones, Ed
Date Start Location Start Time Stop Time Stop Location Cost Code Total Total 57.83
Kovach, Mike
Date Tue Tue 7/9/2013 7/9/2013 Start Location MarkWest - Harrison MarkWest - Harrison Start Time 7:00 am 12:24 pm Stop Time Stop Location Cost Code Dig/Pour main frame mats/piers Dig/Pour main frame mats/piers Daily Total Wed 7/10/2013 Wed 7/10/2013 MarkWest - Harrison MarkWest - Harrison 7:00 am 12:29 pm Dig/Pour main frame mats/piers Dig/Pour main frame mats/piers Daily Total Thu Thu 7/11/2013 7/11/2013 MarkWest - Harrison MarkWest - Harrison 7:00 am 1:27 pm Dig/Pour main frame mats/piers Dig/Pour main frame mats/piers Daily Total Fri Fri 7/12/2013 7/12/2013 MarkWest - Harrison MarkWest - Harrison 7:00 am 12:32 pm Dig/Pour main frame mats/piers Dig/Pour main frame mats/piers Daily Total Sat Sat 7/13/2013 7/13/2013 MarkWest - Harrison MarkWest - Harrison 7:00 am 12:26 pm Dig/Pour main frame mats/piers Dig/Pour main frame mats/piers
Underline: Auto-generated "Out"
Total 5.03 4.19 9.22 5.02 4.06 9.08 6.10 3.22 9.32 5.30 4.53 9.83 5.08 3.12
Page 9 of 15
Kovach, Mike
Date Start Location Start Time Stop Time Stop Location Cost Code Daily Total Mon 7/15/2013 Mon 7/15/2013 Mon 7/15/2013 Tue Tue 7/16/2013 7/16/2013 HC - Steelcon shop MarkWest - Harrison MarkWest - Harrison MarkWest - Harrison MarkWest - Harrison 6:00 am 8:19 am Total 8.20 0.42 3.77 4.46 Daily Total 7:04 am 12:35 pm 8.65 5.20 4.35 Daily Total Wed 7/17/2013 Wed 7/17/2013 MarkWest - Harrison MarkWest - Harrison 6:38 am 12:28 pm 9.55 5.37 4.18 Daily Total Thu Thu 7/18/2013 7/18/2013 MarkWest - Harrison MarkWest - Harrison 6:42 am 12:26 pm 9.55 5.32 5.16 Daily Total Fri 7/19/2013 MarkWest - Harrison 6:36 am 10.48 9.80 Daily Total Mon 7/22/2013 Mon 7/22/2013 HC - Steelcon shop MarkWest - Harrison 6:00 am 8:31 am 9.80 0.62 3.57
12:05 pm MarkWest - Harrison 12:28 pm 4:56 pm MarkWest - Harrison 12:16 pm MarkWest - Harrison 4:56 pm MarkWest - Harrison
Fab shop / office addition Erect steel Erect steel Erect steel Dig/Pour main frame mats/piers Dig/Pour main frame mats/piers Dig/Pour main frame mats/piers Dig/Pour main frame mats/piers Dig/Pour main frame mats/piers Dig/Pour main frame mats/piers Fab shop / office addition Dig/Pour main frame mats/piers
Page 10 of 15
Kovach, Mike
Date Mon 7/22/2013 Start Location MarkWest - Harrison Start Time 12:29 pm Stop Time Stop Location Cost Code Dig/Pour main frame mats/piers Daily Total Tue Tue 7/23/2013 7/23/2013 MarkWest - Harrison MarkWest - Harrison 7:00 am 12:27 pm Dig/Pour main frame mats/piers Dig/Pour main frame mats/piers Daily Total Total Total 2.83 7.02 5.07 5.81 10.88 111.58
Wiley, Eric
Date Tue Tue Thu Thu 7/9/2013 7/9/2013 7/11/2013 7/11/2013 Start Location Consol Majorsville Compressor bldg. MarkWest - Harrison Consol Majorsville Compressor bldg. Consol Majorsville Compressor bldg. Consol Majorsville Compressor bldg. Consol Majorsville Compressor bldg. Start Time 10:59 am 12:32 pm 7:00 am 1:46 pm Stop Time Stop Location Cost Code Erect steel Dig foundations Daily Total Erect steel Erect steel Daily Total Fri Fri 7/12/2013 7/12/2013 7:00 am 1:04 pm Total 1.55 4.70 6.25 6.27 3.70 9.97 5.67 3.11 Daily Total 8.78
12:32 pm MarkWest - Harrison 5:14 pm MarkWest - Harrison 1:16 pm 5:28 pm Consol Majorsville
Compressor bldg.
Page 11 of 15
Wiley, Eric
Date Sat Sat 7/13/2013 7/13/2013 Start Location Access Augusta Pipe Rack Access Augusta Pipe Rack Start Time 7:10 am 12:12 pm Stop Time Stop Location Cost Code Total 5.03 3.40 Daily Total Mon 7/15/2013 Mon 7/15/2013 Mon 7/15/2013 HC - Steelcon shop Consol Majorsville Compressor bldg. Consol Majorsville Compressor bldg. Consol Majorsville Compressor bldg. Consol Majorsville Compressor bldg. Consol Majorsville Compressor bldg. Consol Majorsville Compressor bldg. MarkWest - Harrison MarkWest - Harrison 6:00 am 9:10 am 12:27 pm 8.43 0.10 2.92 3.68 Daily Total Tue Tue 7/16/2013 7/16/2013 7:00 am 1:14 pm 6.70 5.70 2.50 Daily Total Wed 7/17/2013 7:00 am 8.20 1.58 Daily Total Thu 7/18/2013 7:00 am 1.58 5.02 Daily Total Tue Tue 7/23/2013 7/23/2013 7:03 am 12:33 pm 5.02 5.00 5.63 Daily Total 10.63
Erect steel
Erect steel
Page 12 of 15
Wiley, Eric
Date Start Location Start Time Stop Time Stop Location Cost Code Total Total 65.56
Zohnd, Ethan
Date Tue Thu Thu 7/9/2013 7/11/2013 7/11/2013 Start Location MarkWest - Harrison Consol Majorsville Compressor bldg. Consol Majorsville Compressor bldg. Consol Majorsville Compressor bldg. Consol Majorsville Compressor bldg. Access Augusta Pipe Rack Access Augusta Pipe Rack Start Time 12:32 pm 7:00 am 1:46 pm Stop Time Stop Location Cost Code Erect steel Daily Total Erect steel Erect steel Daily Total Fri Fri 7/12/2013 7/12/2013 7:00 am 1:02 pm Total 4.70 4.70 6.27 3.70 9.97 5.58 3.15 Daily Total Sat Sat 7/13/2013 7/13/2013 7:14 am 12:34 pm 8.73 4.97 3.03 Daily Total Mon 7/15/2013 Mon 7/15/2013 HC - Steelcon shop Consol Majorsville Compressor bldg. 6:00 am 9:10 am 8.00 0.10 2.90 Daily Total 3.00
12:12 pm 3:36 pm
Dig/Pour main frame mats/piers Access Augusta Pipe Rack Dig/Pour main frame mats/piers Fab shop / office addition Erect steel
Page 13 of 15
Zohnd, Ethan
Date Tue Tue 7/16/2013 7/16/2013 Start Location Consol Majorsville Compressor bldg. Consol Majorsville Compressor bldg. Consol Majorsville Compressor bldg. Consol Majorsville Compressor bldg. Consol Majorsville Compressor bldg. Consol Majorsville Compressor bldg. Consol Majorsville Compressor bldg. Consol Majorsville Compressor bldg. HC - Steelcon shop Consol Majorsville Compressor bldg. Consol Majorsville Compressor bldg. Consol Majorsville Compressor bldg. Start Time 7:00 am 1:15 pm Stop Time Stop Location Cost Code Erect steel Erect steel Daily Total Wed 7/17/2013 Wed 7/17/2013 7:00 am 12:58 pm Total 5.70 2.48 8.18 5.27 2.85 Daily Total Thu Thu 7/18/2013 7/18/2013 7:00 am 12:38 pm 8.12 5.00 5.12 Daily Total Fri Fri 7/19/2013 7/19/2013 7:00 am 1:17 pm 10.12 5.73 1.92 Daily Total Mon 7/22/2013 Mon 7/22/2013 Mon 7/22/2013 6:02 am 8:39 am 12:28 pm 7.65 0.10 3.35 8.88 Daily Total Tue 7/23/2013 7:00 am 12.33 9.62
Erect steel
Page 14 of 15
Zohnd, Ethan
Date Start Location Start Time Stop Time Stop Location Cost Code Daily Total Total Total 9.62 90.42
Page 15 of 15