You are on page 1of 1

BILL OF QUANTITY

PEKERJAAN PENSTOCK, PLTM KARAI-7


NO
I

URAIAN PEKERJAAN

SAT

VOLUME

HARGA SATUAN
(Rp.)

TOTAL HARGA
(Rp.)

PEKERJAAN SIPIL
I.1

Pengukuran & Pemasangan Bowplank

m'

1.000,00

94.416,11

94.416.108,98

I.2

Galian tanah dalam 3 m

m3

3.166,81

123.213,74

390.194.503,76

I.3

Pengurukan Tanah Kembali

m3

2.533,45

34.348,61

87.020.407,55

I.4

Galian batu

m3

7.389,23

51.115,31

377.702.750,79

I.5

Compacted stone filling

m3

876,00

457.981,42

401.191.719,80

I.6

Stone masonry 1:4

m3

641,00

878.300,98

562.990.928,68

I.7

Concrete K. 175, Reinforce Concrete

m3

1.157,00

4.457.463,27

5.157.285.006,70

I.8

Concrete K. 225, Reinforce Concrete

m3

182,00

4.866.052,54

885.621.561,82

SUB TOTAL - I
II

7.956.422.988,08

PEKERJAAN PENSTOCK
II.1

Expantion Joint Penstock

bh

11,00

100.320.000,00

1.103.520.000,00

II.2

Man Hole Penstock

bh

3,00

7.300.000,00

21.900.000,00

II.3

Shear Connector

ton

7,21

32.500.000,00

234.325.000,00

II.4

Ring girder

ton

12,40

32.500.000,00

403.000.000,00

II.5

Steel Saddle/Trestle Support

ton

72,25

32.500.000,00

2.348.125.000,00

II.6

Pipa Penstock dia. 1938 mm, t = 10 mm

ton

219,07

32.500.000,00

7.119.775.000,00

II.7

Pipa Penstock dia. 1938 mm, t = 12 mm

ton

89,45

32.500.000,00

2.907.125.000,00

II.8

Pipa Penstock dia. 1938 mm, t = 14mm

ton

24,26

32.500.000,00

788.450.000,00

II.9

Pipa Penstock dia. 1400 mm, t = 12 mm

ton

30,92

32.500.000,00

1.004.900.000,00

II.10

Penstock stiffener

ton

8,82

32.500.000,00

286.650.000,00

II.11

Wye Piece

ton

5,30

38.365.360,43

203.336.410,28

II.12

Coating and sandblasting

M2

8.581,87

171.273,93

1.469.850.601,65

II.13

Radiograf

film

8.233,00

140.000,00

1.152.620.000,00

SUB TOTAL - II

TOTAL I + II
PPh 3 %
PPN 10 %
GRAND TOTAL

19.043.577.011,93
27.000.000.000,00
810.000.000,00
2.700.000.000,00
30.510.000.000,00

KETERANGAN

You might also like