IE 231
(5 x 1 buffer + 1 x 2 machines)
(special case)
( ( ) ( )( ) (
)(
b. TH, CT, WIP of the line if buffer is increased to 7 jobs , , (special case)
( ( ) ( )( ) (
)(
c. TH, CT, WIP of the line if the second machine slows down to take 12 minutes per job , , ( ) ( ( ( ) ( )( ) ( )( ) ) ) ( ) ( )( ) ( )
IE 231
d. TH, CT, WIP of the line if the first machine slows down to take 12 minutes per job , , ( (5 @ buffer and 1 @ each machine) ) ( ( ( ) ( )( ) ( )( ) ) ) ( ) ( )( ( ) )