You are on page 1of 1

Tel : +9712 550 2004 , Fax +9712 550 3662, Email: info@swlifitng.com, Website: www.southwestme.

com

RE- QUOTATION
Quote Date : SWC-0068 REV. 1 : 15.06.2013

TO:

SEIL Machinery Installation Co.,Ltd.


Attention Address Tel No. Fax No. Email : Mr. Harison A. Udasan :P.O. Box 105570 - Abu Dhabi, U.A.E. : +971 56 198 7717 / +971 52 832 5856 : +971 2 553 1581 : harison_udasan@yahoo.com
Subject Onsite Visual Inspection & Certification of LG Payment Terms : Cash or CDC against releasing of the original certificate

Dear Sir,
Please find below our best and competitive offer for the Onsite Visual Test/Inspection and Ceritifcation of Various Equipments/ Gears
SL NO. 1 2 3 4 5 6 7 8 9 ITEM DESCRIPTION SLING BELT SLING BELT SLING BELT CHAIN BLOCK CHAIN BLOCK LEVER BLOCK SHACKLE PIN SHACKLE PIN ID NO. SWL 4ton 3ton 2ton 1 Ton 1 Ton 0.75TON 4.75TON 8.5TON QTY 3 3 2 1 1 1 4 5 LS Gross Discount Net Amount U. RATE 20.00 20.00 20.00 75.00 75.00 75.00 20.00 20.00 TRIP AMOUNT 60.00 60.00 40.00 75.00 75.00 75.00 80.00 100.00 250.00 815.00 0.00 815.00

TRANSIT CHRAGES FROM/TO BNPP SITE

Total Amount AED. Eight Hundred Fifteen Only. Terms And Condition
Client must provide previous test certificate of all the above mentioned items.

Inspection Report / Certificate will be issued after receipt of 100 % Payment/ Service Order..

To the fullest extent neither South West nor any of its Inspector, employees or agents will be liable for any damages arising out of or in connection the use of this site. Disassembling and assembling during inspection item, if any must be done by the client. All man power during Inspection will be provided by client. In case of rejection in inspection or unsafe condition of Equipment, The client will be liable to pay full amount of Job. Client must provide all the material available onsite time of inspection to avoid any delay for inspectio Any delay during inspection due to unforeseen circumstances at site client will be liable to pay, 150 AED per hour as hourly delay charges

Security pass for our engineer will be our responsibility and transporation inside the baraka site would be client scope of work.

Regards, For South West Certification APRIL M.


SOFTWARE GENERATED DOCUMENT, NO NEED FOR SIGNATURE OR SEAL SW, ISSUE-01, REV-2, DATE: 05.03.2012

You might also like