VISIT REPORT AT INDONESIA POWER PLANT IN BALI FRIDAY 15 MARCH 2013

Purpose PT.PERTA DAYA GAS is planning to construct a LNG terminal Plant in Bali in line with Government program in converting HSD fuel with gas fuel for power plants in Eastern Indonesia. The receiving terminal is being designed on gas production capacity and LNG tank capacity. It is important to fix the gas production capacity of the terminal from the quantity of maximum gas demand per hour for PT>INDONESIA POWER, in order to decide the capacity and number equipment of installed LNG terminal facilities. The power plant is located not far from the LNG terminal approximately 3,4 km and gas is transported by means of pipeline system.

Data Received PT.Indonesia Power is planning to bid the Procurement Dual Fuel Gas/HSD Engine Units amounting 200 MW installed which consist of: Total units :12 x 17 MW Gas Engines total output 200 MW

Fuel Consumtion : 30 MMscfd Location at : PT.Indonesia Power, Pesanggaran

Facilities include : A gas metering system, filtering system, manifold etc. Below is general lay out of the new Gas Engines in Pasanggaran. Person contacted : Mr. Kukuh Pambudi, Senior Supervisor of Asset Management PT.Indonesia Power.

General Lay out PLTD 200 MW, Pasanggaran, Bali